scholarly journals Quality assurance program for Angra 1 licence renewal and long-term operation

2021 ◽  
Vol 9 (2B) ◽  
Author(s):  
YOUSSEF MORGHI ◽  
Amir Zacarias Mesquita ◽  
Ana Rosa BALIZA MAIA

In Brazil, according to Cnen standard, a nuclear power plant has authorization to operate for 40 years. Angra 1 commercial operation started in 1985 and it has license to operate until 2024. Eletronuclear aims to extend the operation of the Angra 1 plant from 40 to 60 years. To obtain the license renewal by more than 20 years (long-term operation), Eletronuclear will need to meet the requirements of 10 CFR Part 54, Cnen NT-CGRC-007/18 and NT-CGRC-008/18 (Cnen technical notes). To obtain a license renewal to a long-term operation it is necessary to demonstrate that the plants will operate according to safety requirements, through analysis, testing, aging management, system upgrades, as well as additional inspections. Plant operators and regulators must always ensure that plant safety is maintained and, when it is possible, strengthened during the long-term operation of the plant. One of the documents to obtain a license renewal to a long-term operation is the Quality Assurance Program (QAP). Angra 1 has a QAP according to 10CFR 50 App B and Cnen NN 1.16 for safety related items. However, according to 10 CFR50.34, Nureg-1800 Appendix A.2, Nureg-1801 Appendix A-1 of Nuclear Regulatory Commission (NRC) and NT-CGRC-007/18 and NT-CGRC-008/18 of Cnen, the QAP needs to include the items that are not safety related but are included in the Aging Management. This article will discuss the Angra 1 QAP for the license renewal to a long-term operation according the standards approved by Cnen.

Author(s):  
Garry G. Young

As of January 2013, the U.S. Nuclear Regulatory Commission (NRC) has renewed the operating licenses of 73 nuclear units out of a total of 104 licensed units, allowing for up to 60 years of safe operation. In addition, the NRC has license renewal applications under review for 15 units and more than 13 additional units have announced plans to submit applications over the next few years [1]. This brings the total of renewed licenses and plans for renewal to over 97% of the 104 operating nuclear units in the U.S. This paper presents the status of the U.S. license renewal process and issues being raised for possible applications for subsequent renewals for up to 80 years of operation. By the end of 2013 there will be 26 nuclear plants in the U.S. (or 25% of the 104 units) that will be eligible to seek a second license renewal and by the end of 2016 this number will increase to about 50% of the 104 licensed units. Although some nuclear plant owners have announced plans to shutdown before reaching 60 years, the majority are keeping the option open for long term operation beyond 60 years. The factors that impact decisions for both the first license renewals and subsequent renewals for 80 years of safe operation are presented and discussed in this paper.


2021 ◽  
Vol 8 (3A) ◽  
Author(s):  
ANA ROSA BALIZA MAIA ◽  
Youssef Morghi ◽  
AMIR ZACARIAS MESQUITA

The in-service inspection program of the Angra 1 plant is updated every 10 years, according to applicable standards - designer (American Project - are followed NRC requirements) and Cnen. NRC approves the use of ASME Section XI (In-service Inspection of Nuclear Power Plant Components). The object of in-service inspection of components in nuclear power plants is to provide a continuing assurance that they are safe. To provide this assurance for those components that are subject to the requirements of the ASME Boiler and Pressure Vessel Code, a set of rules has been formulated to provide assurance that the functional requirements of the components are available when required. The rules have been arranged to provide appropriate levels of assurance according to the importance of the component in its relationship to plant safety. The classifications that are established during design and manufacturing have been adopted to provide the levels of importance for the components. The types of components typically found in the various classifications have then been identified and rules formulated for each type. For each type of component in each classification, the functions have been considered and methods of inspecting, testing, or monitoring each component is specified. These rules include methods of determining the limits of acceptance of the results. Should it be necessary to take corrective action to repair various components, rules have been provided to establish acceptable methods of repair or replacement. Angra 1 started the Renewal License and Long-term Operation project and there are three important Aging Management Programs (AMP) that are based on ASME section XI. This article will discuss the ASME section XI subsections that are important for the License Renewal and Long-term Operation for Angra 1.  


Author(s):  
Taunia Wilde ◽  
Shannan Baker ◽  
Gary M. Sandquist

The design, construction, operation, maintenance, and decommissioning and decontamination of nuclear infrastructure particularly nuclear power plants licensed in the US by the US Nuclear Regulatory Commission (NRC) or operated by the US Department of Energy (DOE) or the US Department of Defense (DOD) must be executed under a rigorous and documented quality assurance program that provides adequate quality control and oversight. Those codes, standards, and orders regulate, document and prescribe the essentials for quality assurance (QA) and quality control (QC) that frequently impact nuclear facilities operated in the US are reviewed and compared.


1980 ◽  
Vol 24 (1) ◽  
pp. 123-123
Author(s):  
Linda O. Hecht

Due to the concern for safety the nuclear power industry in the United States has fostered the use of reliability analysis to assess system performance and the impact of system failure on overall plant safety. The need for system and component failure rate data has been recognized and has spurred such efforts as NPRDS (Nuclear Power Research Data System) and IEEE's Std 500 (The Reliability Data Manual). Reliability modeling techniques have been developed for application to nuclear systems and are presently being considered by the Nuclear Regulatory Commission for licensing purposes.


Author(s):  
David Alley

This paper provides a historical perspective on the need for, and development of, buried and underground piping tanks programs at nuclear power plants. Nuclear power plant license renewal activities, Nuclear Regulatory Commission Buried Piping Action Plan, and the rationale for addressing the issue of buried pipe through an industry initiative as opposed to regulation are discussed. The paper also addresses current NRC activities including the results of Nuclear Regulatory Commission inspections of buried piping programs at nuclear power plants as well as Nuclear Regulatory Commission involvement in industry and standards development organizations. Finally, the paper outlines the Nuclear Regulatory Commission’s future plans concerning the issue of buried piping at US nuclear power plants.


Author(s):  
John M. O'Hara

The purpose of this paper is to discuss the role of human factors engineering (HFE) guidelines in the evaluation of complex human-machine systems, such as advanced nuclear power plants. Advanced control rooms will utilize human-system interface (HSI) technologies that can have significant implications for plant safety in that they will affect the ways in which plant personnel interact with the system. In order to protect public health and safety, the U.S. Nuclear Regulatory Commission reviews the HFE aspects of plant HSIs to ensure that they are designed to HFE principles and that operator performance and reliability are appropriately supported. Evaluations using HFE guidelines are an important part of the overall review methodology. The Advanced HSI Design Review Guideline (DRG) was developed to provide these review criteria. This paper will address (1) the issues associated with guideline-based evaluations, (2) DRG development and validation, and (3) the DRG review procedures.


2013 ◽  
Vol 284-287 ◽  
pp. 1151-1155
Author(s):  
Che Hao Chen ◽  
Jong Rong Wang ◽  
Hao Tzu Lin ◽  
Chun Kuan Shih

The objective of this study is to utilize TRACE (TRAC/RELAP Advanced Computational Engine) code to analyze the reactor coolant system (RCS) pressure transients under ATWS (Anticipated Transient Without Scram) for Maanshan PWR (Pressurized Water Reactor) in various MTC (Moderator Temperature Coefficient) conditions. TRACE is an advanced thermal hydraulic code for nuclear power plant safety analysis, which is currently under development by the United States Nuclear Regulatory Commission (USNRC). A graphic user interface program named SNAP (Symbolic Nuclear Analysis Package), which processes inputs and outputs for TRACE is also under development. Maanshan nuclear power plant (NPP) is the only Westinghouse PWR in Taiwan. The rated core thermal power of Maanshan with MUR (Measurement Uncertainty Recapture) is 2822 MWt. In document SECY-83-293, all initializing events were classified as either turbine trip or non-turbine trip events and their ATWS risks were also evaluated according to these two events. Loss of condenser vacuum (LOCV) and Loss of normal feedwater (LONF) ATWS were identified as limiting transients of turbine trip and non-turbine trip events in this study. According to ASME Code Level C service limit criteria, the RCS pressure for Maanshan NPP must be under 22.06 MPa. Furthermore, we select the LOCV transient to analyze various MTC effects on RCS pressure variations.


Materials ◽  
2021 ◽  
Vol 14 (7) ◽  
pp. 1703
Author(s):  
Salvatore Angelo Cancemi ◽  
Rosa Lo Frano

Combining global experience, comprehensive aging knowledge, and predictive methodologies provides ideal prerequisites for the long-term operation strategy (LTO) of a nuclear power plant (NPP). Applying management strategies with an understanding of the ways in which structures relevant for the plant safety perform and interact in their operating environments is of meaningful importance for operating the plant beyond its originally licensed service life. In performing aging studies on the nuclear systems, structure, and components (SSCs), the results are crucial for demonstrating the safety and reliability of the NPP beyond 30 years of nominal operation. In this study, the synergistic effect of a creep mechanism with the alteration suffered by piping material is analyzed by means of MSC©MARC finite element code. Nonlinear analyses were performed to calculate the effects of the long operational period on a primary pipe, assess its degradation, and determine its residual functionality. In these analyses, both homogeneous and inhomogeneous pipe wall thinning are considered, as well as the operating or expected thermal–mechanical loads. The obtained results indicate that thermo–mechanical loads are responsible for pipe deformation, which develops and increases as the transient progresses. Furthermore, an excessive (general or local) wall thinning may determine a dimensional change of the pipe, even causing bending or buckling.


Author(s):  
Tama´s Ja´nos Katona ◽  
Sa´ndor Ra´tkai ◽  
A´gnes Ja´nosine´ Bi´ro´

Operational license of WWER-440/213 units at Paks NPP, Hungary is limited to the design lifetime of 30 years. Prolongation by additional 20 years of the operational lifetime is feasible. Moreover, enhancement of the reactor thermal power by 8% will increase both the net power output and the competitiveness of the plant. Paks NPP is one of the first considering the power up-rate and preparation of long-term operation of WWER-440/213 design. Systematic preparatory work for long-term operation of Paks NPP has been started in 2000. A regulatory framework and a comprehensive engineering practice have been developed. According to the authors view, creation of a gapless engineering system via consequent application of best practices, and feed-back of experiences together with proper consideration of WWER-440/V213 features are the decisive elements of ensuring the safety of long-term operation. That systematic engineering approach is in the focus of recent paper. Key elements of justification and measures and actions for ensuring the safety of long-term operation of Paks NPP WWER-440/213 units are identified and discussed. These are the assessment of plant condition and review of adequacy of ageing management programmes, also the review, validation and reconstitution of time limited ageing analyses as core tasks of license renewal.