Construction costs forecasting: comparison of the accuracy of linear regression and support vector machine models
2019 ◽
Vol 4
(2)
◽
pp. 104-107
Keyword(s):
2012 ◽
Vol 7
(10)
◽
pp. 11-20
Keyword(s):
2018 ◽
2012 ◽
Vol 182-183
◽
pp. 869-872
Keyword(s):
2013 ◽
Vol 36
(15)
◽
pp. 2464-2471
◽
2017 ◽
Vol 27
(13)
◽
pp. 2931-2938
◽
Keyword(s):
2020 ◽
Vol 14
(1V)
◽
pp. 35-45