Case Study: Application of Coiled Tubing Tractor to Acid Stimulate Horizontal Extended Reach Open Hole Power Water Injector

Author(s):  
Ayed M. Al-Shehri ◽  
Mazen Omari ◽  
Samer AlSarakbi
2017 ◽  
Author(s):  
Alexey Anopov ◽  
Ahmed Alomair ◽  
Mohammed A. Aseeri ◽  
Danish Ahmed ◽  
Nestor Molero

Author(s):  
JATRIANA B2041142013

Penelitian ini bertujuan untuk mengukur kinerja keuangan kampus IAIN Pontianak menggunakan pendekatan Balance Scorecard. Metode penelitian ini adalah kuantitatif dengan menggunakan statistika untuk menganalisis sampel yang digunakan sebanyak 664 orang mahasiswa dan 193 orang dosen dan pegawai. Hasil penelitian menyatakan bahwa variabel perspektif pelanggan, perpektif bisnis internal dan variabel perspektif pertumbuhan dan pembelajaran, masing-masing berpengaruh positif dan signifikan terhadap peningkatan kinerja keuangan IAIN Pontianak.Kata Kunci : Balance Scorecard, IAIN Pontianak, Kinerja KeuanganDAFTAR PUSTAKA Andriyanto, R. W., & Metalia, M. (2010). Efektivitas Balanced Scorecard Dalam Maningkatkan Kinerja Manajerial Badan Usaha Milik Negara (Bumn). Jurnal Akuntansi dan Investasi, 11(2), 97-114.Arikunto, S. 1992. Prosedur penelitian: Suatu pendekatan praktik. Rineka Cipta.Bastian, Indra. 2006. Akutansi Sektor Publik, Suatu Pengantar. Jakarta: Airlangga.Brown, Cindy. 2012. Application of the Balanced Scorecard in Higher Education: Opportunities and Challenges - An Evaluation of Balanced Scorecard Implementation at the College of St. Scolastica. SCUP; Society for College and University Planning. www.scup.org/phe.html.Effendi, R. (2012). Pengukuran Kinerja Sektor Publik Dengan Menggunakan Balanced Scorecard (Studi Kasus Kanwil DJP Sumsel dan Kep. Babel). Jurnal Ilmiah Stie Mdp, 1(2), 67-73.Gaspersz, Vicent. 2002. Sistem Manajemen Kinerja Terintegrasi: Balanced Scorecard dengan Six Sigma untuk Organisasi Bisnis dan Pemerintah. Cet ke-3, Jakarta: Gramedia Pustaka UtamaHandayani, S. (2017). Analisis Balanced Scorecard Sebagai Tolok Ukur Kinerja Perusahaan Pada Pt Pos Indonesia ( Persero ) Lamongan. Jurnal Penelitian Ekonomi dan Akuntansi, II(3), 589-601.IAIN Pontianak. 2019. “Sistem Informasi Akademik Institut Agama Islam Negeri Pontianak.” Mahasiswa IAIN Pontianak. www.sia.iainptk.ac.id.Kaplan, S. Robert, and David P. Norton. 2000. Balanced Scorecard, Menerapkan Strategi Menjadi Aksi. Jakarta: Penerbit Erlangga.Karathanos, Dementrius, and Patricia Karathanos. 2005. “Appliying the Balanced Scoredard to Education.” Journal of Education for Business: 222–30.Kemenristek Dikti RI. 2019. “Pangkalan Data Pendidikan Tinggi:  Kementrian Riset , Teknologi, Dan Pendidikan Tinggi.” Tenaga Pendidik  IAIN Pontianak. www/forlap.ristekdikti.go.id.Kementrian Agama RI. 2019. “Seleksi Prestasi Akademik Nasional APerguruan Tinggi Keagamaan Islam Negeri.” SPAN PTKIN 2019. https://span-ptkin.ac.id.Mahsun, Muhammad. 2006. Pengukuran Kinerja Sektor Publik. 1st ed. Yogyakarta: BPFE.Mardiasmo. 2004. Akuntansi Sektor Publik. 1st ed. Yogyakarta: BPFE.Mulyadi. 2007. Balanced Scorecard, Alat Manajemen Kontemporer Untuk Pelipatganda Kinerja Keuangan Perusahaan. 1st ed. Jakarta: Penerbit Salemba Empat.Nugrahini, I. A. P., Ratnadi, N. M. D., & Putri, I. G. A. M. A. D. (2016). Penilaian Kinerja Berdasarkan Balanced Scorecard Pada Badan Penanaman Modal Dan Perijinan Daerah Kabupaten Tabanan. E-Jurnal Ekonomi dan Bisnis Universitas Udayana, 5(4), 829-856.Rollins, Andrea Mae. 2011. “A Case Study: Application of Balanced Scorecard in Hingher Education.” PhD Dissertation. San Diego State University.Singarimbun, Masri, and Sofian Effendi. 1989. Metode Penelitian Survey. Jakarta: LP3ES.Sugiono. 2005. Metode Penelitian Bisnis. Bandung: Alfabeta.Suta, I. W. P., & Dwiastuti, G. A. A. S. A. (2016). Pengukuran Kinerja Dengan Pendekatan Balanced Scorecard Pada Kantor Pusat Pt Bank Pembangunan Daerah Bali. Jurnal Bisnis Dan Kewirausahaan, 12(1), 32-41.Syarbaini, Khatib. 1986. “Fakultas Tarbiyah (Ketikan Manual).”Yassin, A., Musadieq, M. A., & Afrianty, T. W. (2016). Pengaruh Balanced Scorecard Dan Knowledge Management Terhadap Kinerja Karyawan Dan Kinerja Perusahaan (Studi Pada Karyawan Pt Semen Indonesia (Persero) Tbk). Jurnal Administrasi Bisnis, 33(2), 125-134.


Author(s):  
Vidal Félix Navarro Torres ◽  
Carlos Dinis Da Gama ◽  
Juan Manuel Girao Sotomayor

2021 ◽  
Author(s):  
Sviatoslav Iuras ◽  
Samira Ahmad ◽  
Chiara Cavalleri ◽  
Yernur Akashev

Abstract Ukraine ranks the third largest gas reserves in Europe. Gas production is carried out mainly from the Dnieper-Donets Basin (DDB). A gradual decline in reserves is forcing Ukraine to actively search for possible sources to increase reserves by finding bypassed gas intervals in existing wells or exploration of new prospects. This paper describes 3 case studies, where advanced pulsed neutron logging technology has shown exceptional value in gas-bearing layer identification in different scenarios. The logging technology was applied for formation evaluation. The technology is based on the neutron interaction with the minerals and the fluids contained in the pore space. The logging tool combines measurements from multiple detectors and spacing for self-compensated neutron cross-capture section (sigma) and hydrogen index (HI), and the Fast Neutron Cross Section (FNXS) high-energy neutron elastic cross section rock property. Comprehensive capture and inelastic elemental spectroscopy are simultaneously recorded and processed to describe the elemental composition and the matrix properties, reducing the uncertainties related to drilling cuttings analysis, and overall, the petrophysical evaluation combined with other log outputs. The proposed methodology was tested in several wells, both in open hole and behind casing. In the study we present its application in three wells from different fields of the DDB. The log data acquisition and analysis were performed across several sandstone beds and carbonates formation with low porosities (<10%), in various combinations of casing and holes sizes. The results showed the robustness and effectiveness of using the advanced pulsed neutron logging (PNL) technologies in multiple cases: Case Study A: Enabling a standalone cased hole evaluation and highlighting new potential reservoir zones otherwise overlooked due to absence of open hole logs. Case Study B: Finding by-passed hydrocarbon intervals that were missed from log analysis based on conventional open hole logs for current field operator. Case Study C: Identifying gas saturated reservoirs and providing solid lithology identification that previously was questioned from drilling cuttings in an unconventional reservoir.


2021 ◽  
Author(s):  
Laurie S. Duthie ◽  
Hussain A. Saiood ◽  
Abdulaziz A. Al-Anizi ◽  
Norman B. Moore ◽  
Carol Correia

Abstract Successful reservoir surveillance and production monitoring is a key component for effectively managing any field production strategy. For production logging in openhole horizontal extended reach wells (ERWs), the challenges are formidable and extensive; logging these extreme lengths in a cased hole would be difficult enough, but are considerably exaggerated in the openhole condition. A coiled tubing (CT) logging run in open hole must also contend with increased frictional forces, high dogleg severity, a quicker onset of helical buckling and early lockup. The challenge to effectively log these ERWs is further complicated by constraints in the completion where electrical submersible pumps (ESPs) are installed including a 2.4" bypass section. Although hydraulically powered coiled tubing tractors already existed, a slim CT tractor with real-time logging capabilities was not available in the market. In partnership with a specialist CT tractor manufacturer, a slim logging CT tractor was designed and built to meet the exceptional demands to pull the CT to target depth. The tractor is 100% hydraulically powered, with no electrical power allowing for uninterrupted logging during tractoring. The tractor is powered by the differential pressure from the bore of the CT to the wellbore, and is operated by a pre-set pump rate from surface. Developed to improve the low coverage in open hole ERW logging jobs, the tractor underwent extensive factory testing before being deployed to the field. The tractor was rigged up on location with the production logging tool and ran in hole. Once the coil tubing locked up, the tractor was activated and pulled the coil to cover over 90% of the open hole section delivering a pulling force of up to 3,200 lb. Real-time production logging was conducted simultaneously with the tractor activated, flowing and shut-in passes were completed to successfully capture the zonal inflow profile. Real-time logging with the tractor is logistically efficient and allows instantaneous decision making to repeat passes for improved data quality. The new slim logging tractor is the world's slimmest most compact, and the first of its kind CT tractor that enables production logging operations in horizontal extended reach open hole wells. The ability to successfully log these extended reach wells cannot be understated, reservoir simulations and management decisions can only as good as the quality of data available. Some of the advantages of drilling extended reach wells such as increased reservoir contact, reduced footprint and less wells drilled will be lost if sufficient reservoir surveillance cannot be achieved. To maximize the benefits of ERWs, creative solutions and innovative designs must continually be developed to push the boundaries further.


Sign in / Sign up

Export Citation Format

Share Document