An integrated approach for improving the wastewater discharge and treatment systems

1998 ◽  
Vol 37 (1) ◽  
pp. 341-346 ◽  
Author(s):  
A. Pfister ◽  
A. Stein ◽  
S. Schlegel ◽  
B. Teichgräber

Since treatment plants have been built all over Germany during the last decades, the water quality of receiving streams has been improved remarkably. But there are still a lot of quality problems left, which are caused e.g. by combined sewer overflows (CSO), treatment plant effluents or rainwater discharges from separate sewer systems. At present different efforts are undertaken to control sewer systems in order to improve the operation of urban drainage systems or more generally, design processes. The Emschergenossenschaft and Lippeverband (EG/LV) are carrying out research studies, which are focusing on a minimization of total emissions from sewer systems both from wastewater treatment plant (WWTP) effluents and from CSO. They consider dynamic interactions between rainfall, resultant wastewater, combined sewers, WWTP and receiving streams. Therefore, in an advanced wastewater treatment, a model-based improvement of WWTP operation becomes more and more essential, and consequently a highly qualified operational staff is needed. Some aspects of the current research studies are presented in this report. The need and the use of an integrated approach to combine existing model components in order to optimize dynamic management of combined sewer systems (CSS) with a benefit for nature are outlined.

1996 ◽  
Vol 31 (3) ◽  
pp. 453-472 ◽  
Author(s):  
M. Stirrup

Abstract The Regional Municipality of Hamilton-Wentworth operates a large combined sewer system which diverts excess combined sewage to local receiving waters at over 20 locations. On average, there are approximately 23 combined sewer overflows per year, per outfall. The region’s Pollution Control Plan, adopted by Regional Council in 1992, concluded that the only reasonable means of dealing with large volumes of combined sewer overflow in Hamilton was to intercept it at the outlets, detain it and convey it to the wastewater treatment plant after the storm events. The recommended control strategy relies heavily on off-line storage, with an associated expansion of the Woodward Avenue wastewater treatment plant to achieve target reductions of combined sewer overflows to 1–4 per year on average. The region has begun to implement this Pollution Control Plan in earnest. Three off-line detention storage tanks are already in operation, construction of a fourth facility is well underway, and conceptual design of a number of other proposed facilities has commenced. To make the best possible use of these facilities and existing in-line storage, the region is implementing a microcomputer-based real-time control system. A number of proposed Woodward Avenue wastewater treatment plant process upgrades and expansions have also been undertaken. This paper reviews the region's progress in implementing these control measures.


2019 ◽  
pp. 271-282
Author(s):  
Oddvar Georg Lindholm ◽  
Lars Aaby

Wet weather discharges consist mainly of washed out surface pollution in separate sewered areas, but in combined sewered areas; resuspended pipe deposits, surface washoff and sewage, discharging via combined sewer overflows (CSOs). Of the three mentioned sources, resuspended pipe solids is dominating over the other two and may contribute as much as 50 to 90 % of the total amount of the CSO. The CSO in a normal catchment may also on an annual bases be of the same amount, or even twice as much as the effluent from the wastewater treatment plant (WWTP). If the receiving waters are vulnerable to shock loads on a daily base, it is important to be aware that the amount of CSO might, at its most adverse be up to I 00 times more than the effluent from the WWTP during a day. The annual discharge via CSOs in a catchment may easily vary with a factor of up to 8 from the driest to the wettest year, during time series of 20 to 40 years.


2009 ◽  
Vol 76 (3) ◽  
pp. 715-723 ◽  
Author(s):  
Theng-Theng Fong ◽  
Mantha S. Phanikumar ◽  
Irene Xagoraraki ◽  
Joan B. Rose

ABSTRACT Enteric viruses are important pathogens found in contaminated surface waters and have previously been detected in waters of the Great Lakes. Human adenoviruses were monitored because of their high prevalence and persistence in aquatic environments. In this study, we quantified adenoviruses in wastewater, surface water, and combined sewer overflows (CSOs) by real-time PCR. Between August 2005 and August 2006, adenovirus concentrations in raw sewage, primary-treated effluent, secondary-treated effluent, and chlorinated effluent from a wastewater treatment plant in Michigan were examined. CSO samples (n = 6) were collected from a CSO retention basin in Grand Rapids, MI. Adenoviruses were detected in 100% of wastewater and CSO discharge samples. Average adenovirus DNA concentrations in sewage and CSOs were 1.15 × 106 viruses/liter and 5.35 × 105 viruses/liter, respectively. Adenovirus removal was <2 log10 (99%) at the wastewater treatment plant. Adenovirus type 41 (60% of clones), type 12 (29%), type 40 (3%), type 2 (3%), and type 3 (3%) were isolated from raw sewage and primary effluents (n = 28). Six of 20 surface water samples from recreational parks at the lower Grand River showed virus concentrations above the real-time PCR detection limit (average, 7.8 × 103 viruses/liter). This research demonstrates that wastewater effluents and wastewater-impacted surface waters in the lower Grand River in Michigan contain high levels of viruses and may not be suitable for full-body recreational activities. High concentrations of adenovirus in these waters may be due to inefficient removal during wastewater treatment and to the high persistence of these viruses in the environment.


1998 ◽  
Vol 37 (1) ◽  
pp. 333-340 ◽  
Author(s):  
Joachim Guderian ◽  
Andreas Durchschlag ◽  
Jürgen Bever

Based upon the connection of a simulation program for combined sewer systems with the IAWQ-Activated Sludge Model No.1 the new simulation tool GEMINI was developed, which allows the calculation of sewer and sewage treatment plant as a unit. Some obtained results are presented in an example. They suggest, that for every treatment plant a rate of inflow is determinable, which leads to a minimum of total emissions out of sewer and treatment plant. The optimal value of sewage treatment plant inflow in the example is distinctly greater than the design flow rate fixed in German design rules. So it is recognizable that a rigid flow management for sewer and treatment plant does not always fulfil the aim of minimization of total emissions.


2017 ◽  
Vol 75 (9) ◽  
pp. 2025-2033
Author(s):  
M. Gunkel ◽  
E. Pawlowsky-Reusing

As part of the project KURAS, the Berliner Wasserbetriebe realized a field campaign in 2015 in order to increase the process knowledge regarding the behaviour of transported sediment in the pressure main leading from the pumpstation to the wastewater treatment plant. The field campaign was conducted because of a lack of knowledge about the general condition of the pressure main due to its bad accessibility and the suspicion of deposits caused by hydraulic underload. The practical evidence of the sediment transport performance of this part of the sewer system, dependent on different load cases, should present a basis for further analysis, for example regarding flushing measures. A positive side-effect of the investigation was the description of the amount of pollutants caused by different weather conditions in combined sewer systems and the alterations of the sewage composition due to biogenic processes during transport. The concept included the parallel sampling of the inflow at the pumpstation and the outflow at the end of the pressure main during different weather conditions. By calculating the inflow to the pressure main, as well as its outflow at different flow conditions, it was possible to draw conclusions in regard to the transport behaviour of sediment and the bioprocesses within an 8.5 km section of the pressure main. The results show clearly that the effects of sedimentation and remobilization depend on the flow conditions. The balance of the total suspended solids (TSS) load during daily variations in dry weather shows that the remobilization effect during the run-off peak is not able to compensate for the period of sedimentation happening during the low flow at night. Based on the data for dry weather, an average of 238 kg of TSS deposits in the pressure main remains per day. The remobilization of sediment occurs only due to the abruptly increased delivery rates caused by precipitation events. These high pollution loads lead to a sudden strain at the wastewater treatment plant. It was found that the sediment transport behaviour is characterized by sedimentation up to a flow velocity of 0.35 m/s, while remobilization effects occur above 0.5 m/s. The assumption of bad sediment transport performance in the pressure main was confirmed. Therefore, the results can be used as a basis for further analysis, for example regarding periodical flushing as a means of cleaning the pressure main. The findings, especially regarding the methods and processes, are transferable and can be applied to other pressure mains in combined sewer systems. Besides the outlined evaluation of the sediment transport behaviour of the pressure main, the collected data were used in the project to calibrate a sewer system model, including a water quality model for the catchment area, and as a contribution towards an early physically based sediment transport modelling in InfoWorks CS.


2018 ◽  
Vol 25 (4) ◽  
pp. 619-630 ◽  
Author(s):  
Grażyna Sakson ◽  
Marek Zawilski ◽  
Agnieszka Brzezińska

Abstract Combined sewer systems in cities are increasingly equipped with additional storage facilities or other installations necessary for keeping the wastewater treatment plants from overloading during wet weather and reducing combined sewer overflows into receiving waters. Effective methods for reducing such negative phenomena include the temporary storage of wet weather flow in an end-of-pipe separate tank or in a sewer system. In this paper, four scenarios of wastewater storage for the Group Wastewater Treatment Plant (GWWTP) in Lodz (Poland) have been analysed: a storage in a separate single tank located in GWWTP, a storage in the bypass channel in GWWTP, in-sewer storage, and a combination of the aforementioned variants, also with real time control (RTC) system introduced. The basic calculations were performed using the EPA’s SWMM software for the period of 5 years (2004-2008). The chosen solution - storage in a separate storage tank - has been verified based on the inflow dataset from the years 2009-2013. The specific volume of the separate storage tank should be at least 22 m3 per hectare of impervious catchment area, but it could be reduced if additional in-sewer storage with RTC were introduced. Both options allow the effective protection of receiving waters against discharge of untreated sewage during wet weather.


1990 ◽  
Vol 22 (10-11) ◽  
pp. 69-76 ◽  
Author(s):  
A. Durchschlag

As a result of urbanization, the pollutant discharges from sources such as treatment plant effluents and polluted stormwaters are responsible for an unacceptable water quality in the receiving waters.In particular, combined sewer system overflows may produce great damage due to a shock effect. To reduce these combined sewer overflow discharges, the most frequently used method is to build stormwater storage tanks. During storm water runoff, the hydraulic load of waste water treatment plants increases with additional retention storage. This might decrease the treatment efficiency and thereby decrease the benefit of stormwater storage tanks. The dynamic dependence between transport, storage and treatment is usually not taken into account. This dependence must be accounted for when planning treatment plants and calculating storage capacities in order to minimize the total pollution load to the receiving waters. A numerical model will be described that enables the BOD discharges to be continuously calculated. The pollutant transport process within the networks and the purification process within the treatment plants are simulated. The results of the simulation illustrate; a statistical balance of the efficiency of stormwater tanks with the treatment plant capacity and to optimize the volume of storm water tanks and the operation of combined sewer systems and treatment plants.


1995 ◽  
Vol 32 (2) ◽  
pp. 95-103
Author(s):  
José A. Revilla ◽  
Kalin N. Koev ◽  
Rafael Díaz ◽  
César Álvarez ◽  
Antonio Roldán

One factor in determining the transport capacity of coastal interceptors in Combined Sewer Systems (CSS) is the reduction of Dissolved Oxygen (DO) in coastal waters originating from the overflows. The study of the evolution of DO in coastal zones is complex. The high computational cost of using mathematical models discriminates against the required probabilistic analysis being undertaken. Alternative methods, based on such mathematical modelling, employed in a limited number of cases, are therefore needed. In this paper two alternative methods are presented for the study of oxygen deficit resulting from overflows of CSS. In the first, statistical analyses focus on the causes of the deficit (the volume discharged). The second concentrates on the effects (the concentrations of oxygen in the sea). Both methods have been applied in a study of the coastal interceptor at Pasajes Estuary (Guipúzcoa, Spain) with similar results.


1992 ◽  
Vol 26 (5-6) ◽  
pp. 1295-1304 ◽  
Author(s):  
C. Jefferies

Visible pollution discharged from two combined sewer overflows were studied using passive Trash Trap devices and the UK Water Research Centre Gross Solids Sampler. Relationships are presented for the number of visible solids and the mass of gross solids discharged during an event. The differences in the behaviour of the overflow types are reported on and they are categorised using the Trash Traps.


Sign in / Sign up

Export Citation Format

Share Document