Simulation study supporting wastewater treatment plant upgrading

2002 ◽  
Vol 46 (4-5) ◽  
pp. 325-332 ◽  
Author(s):  
N. Hvala ◽  
D. Vrečko ◽  
O. Burica ◽  
M. Strazžar ◽  
M. Levstek

The paper presents a study where upgrading of an existing wastewater treatment plant was supported by simulation. The aim of the work was to decide between two technologies to improve nitrogen removal: a conventional activated sludge process (ASP) and a moving bed biofilm reactor (MBBR). To perform simulations, the mathematical models of both processes were designed. The models were calibrated based on data from ASP and MBBR pilot plants operating in parallel on the existing plant. Only two kinetic parameters needed to be adjusted to represent the real plant behaviour. Steady-state analyses have shown a similar efficiency of both processes in relation to carbon removal, but improved performance of MBBR in relation to nitrogen removal. Better performance of MBBR can be expected especially at low temperatures. Simulations have not confirmed the expected less volume required for the MBBR process. Finally, the MBBR was chosen for plant upgrading. The developed process model will be further used to evaluate the final plant configuration and to optimise the plant operating parameters.

2014 ◽  
Vol 9 (2) ◽  
pp. 215-224 ◽  
Author(s):  
Anneli Andersson Chan ◽  
Niklas Johansson ◽  
Magnus Christensson

Many wastewater treatment plants need to improve their nitrogen removal due to stricter requirements and increasing loads. This often means larger bioreactor volumes, which can be very expensive and is sometimes impossible if space is limited. Therefore, there is a need for compact hybrid solutions that can increase capacity within existing volumes. Two full-scale demonstration projects using moving bed biofilm reactor (MBBR) technology has proven to be an efficient way to treat nitrogen in existing volumes at Sundet wastewater treatment plant in Växjö. Increased nitrification and denitrification capacity in parts of the main stream were demonstrated through the Hybas™ process, a combination of MBBR and activated sludge using the integrated fixed-film activated sludge technology. The ANITA™ Mox process, using autotrophic N-removal through anaerobic ammonium oxidation (anammox), provided high nitrogen removal for the sludge liquor. Data collected on-site for over a year are analyzed and compared with the performance of conventional treatment systems. These two full-scale demonstration projects have been a successful learning experience in identifying and correcting both process and operational issues, which may not have arisen at pilot scale. The set objectives in terms of nitrogen removal were met for both processes and design modifications have been identified that will improve future operation at Sundet WWTP.


2000 ◽  
Vol 41 (4-5) ◽  
pp. 13-20 ◽  
Author(s):  
B. Rusten ◽  
B.G. Hellström ◽  
F. Hellström ◽  
O. Sehested ◽  
E. Skjelfoss ◽  
...  

A moving bed biofilm reactor (MBBR) pilot plant, using Kaldnes type K1 biofilm carriers, was tested for nitrogen removal at the FREVAR wastewater treatment plant. The pilot plant was fed primary treated municipal wastewater, at temperatures from 4.8 to about 20°C. The results showed that a reasonable design nitrification rate will be 190 g TKN/m3d, at 10°C and a reactor pH≥7.0. Pre-denitrification was very dependent on the concentration of readily biodegradable organic matter and the amount of oxygen in the influent to the first anoxic MBBR. It was found that a MBBR process for nitrogen removal at FREVAR will require a total reactor volume corresponding to an empty bed hydraulic retention time of 4–5 hours at average design influent flow. This was based on an influent concentration of 25 mg total N/l, 70% annual average removal of total N and a treatment process consisting of primary treatment, MBBRs with combined pre- and post-denitrification, and followed by coagulation/flocculation and a final solids separation stage.


1992 ◽  
Vol 25 (4-5) ◽  
pp. 203-209 ◽  
Author(s):  
R. Kayser ◽  
G. Stobbe ◽  
M. Werner

At Wolfsburg for a load of 100,000 p.e., the step-feed activated sludge process for nitrogen removal is successfully in operation. Due to the high denitrification potential (BOD:TKN = 5:1) the effluent total nitrogen content can be kept below 10 mg l−1 N; furthermore by some enhanced biological phosphate removal about 80% phosphorus may be removed without any chemicals.


2010 ◽  
Vol 62 (8) ◽  
pp. 1965-1965
Author(s):  
S. Park ◽  
J. Lee ◽  
J. Park ◽  
I. Byun ◽  
T. Park ◽  
...  

Publisher‘s note. We regret that the published version of this article erroneously denoted the first author as corresponding author; in fact the formal corresponding author of this paper is Professor Taeho Lee, whose address is repeated below.


2000 ◽  
Vol 41 (1) ◽  
pp. 177-185 ◽  
Author(s):  
G. Andreottola ◽  
P. Foladori ◽  
M. Ragazzi

The aim of this study was to evaluate the performance of a full-scale upgrading of an existing RBC wastewater treatment plant with a MBBR (Moving Bed Biofilm Reactor) system, installed in a tank previously used for sludge aerobic digestion. The full-scale plant is located in a mountain resort in the North-East of Italy. Due to the fact that the people varied during the year's seasons (2000 resident people and 2000 tourists) the RBC system was insufficient to meet the effluent standards. The MBBR applied system consists of the FLOCOR-RMP®plastic media with a specific surface area of about 160 m2/m3 (internal surface only). Nitrogen and carbon removal from wastewater was investigated over a 1-year period, with two different plant lay-outs: one-stage (only MBBR) and two stage system (MBBR and rotating biological contactors in series). The systems have been operated at low temperature (5–15°C). 50% of the MBBR volume (V=79 m3) was filled. The organic and ammonium loads were in the average 7.9 gCOD m−2 d−1 and 0.9 g NH4−N m−2 d−1. Typical carbon and nitrogen removals in MBBR at temperature lower than 8°C were respectively 73% and 72%.


2010 ◽  
Vol 61 (9) ◽  
pp. 2259-2266 ◽  
Author(s):  
Styliani Kantartzi ◽  
Paraschos Melidis ◽  
Alexander Aivasidis

In the present study, a laboratory scale system, consisting of a primary settling tank, a continuous stirred tank reactor and a clarifier were constructed and operated, using wastewater from the municipal wastewater treatment plant in Xanthi, Greece. The system operated under intermittent aeration in aerobic/anoxic conditions and feeding of the wastewater once in every cycle. The unit was inoculated with sludge, which originated from the recirculation stream of the local wastewater treatment plant. The wastewater was processed with hydraulic retention time (HRT) of 12 h, in which various experimental states were studied regarding the combination of aerobic and anoxic intervals. The wastewater was fed in limited time once in every cycle of aerobic/anoxic conditions at the beginning of the anoxic period. The two states that exhibited highest performance in nitrification and total nitrogen removal were, then, repeated with HRT of 10 h. The results show that, regarding the nitrification stage and the organic load removal, the intermittent system achieved optimum efficiency, with an overall removal of biological oxygen demand (BOD5) and ammonium nitrogen in the range of 93–96% and 91–95% respectively. As far as the total nitrogen removal is concerned, and if the stage of the denitrification is taken into account, the performance of the intermittent system surpassed other methods, as it is shown by the total Kjeldahl nitrogen (TKN) removal efficiency of 85–87%. These operating conditions suppressed the growth of filamentous organisms, a fact reflected at the SVI values, which were lower than 150 ml/g.