scholarly journals Incorporating the dimensions of sustainability into information systems projects

2019 ◽  
Vol 20 (1) ◽  
pp. 530-556 ◽  
Author(s):  
N Joseph ◽  
C Marnewick

Although research has been done on sustainability in project management, little or no research has been conducted on sustainability within the domain of information system (IS) projects. This article reports on whether IS projects are executed sustainably and whether they contribute to organisational sustainability. A questionnaire, completed by 650 IS project managers, was used to determine the state of IS project sustainability. The results highlight that sustainability is not integrated into IS projects and IS project managers do not consider organisational sustainability. IS projects tend to focus on the economic dimension, i.e. increasing productivity and profits, with no thought being given to the social and environmental dimensions. This article recommends that sustainability should be incorporated into project management and IS best practices. Accordingly, the way IS projects are executed should be re-evaluated in terms of their sustainability.

2017 ◽  
Vol 29 (1) ◽  
Author(s):  
Grant Clinning ◽  
Carl Marnewick

The concept of sustainability is becoming more and more important in the face of dwindling resources and increasing demand. Despite this, there are still many industries and disciplines in which sustainability is not actively addressed. The requirement of meeting current and future needs is not an issue from which IT projects are exempt. Ensuring sustainability requires managing sustainability in all activities. The field of IT and sustainability is one in which literature is appearing, but at a slow pace and this leaves many unanswered questions regarding the state of sustainability in IT projects and the commitment of IT project managers to sustainability. In not knowing what the state of sustainability is, potential shortcomings remain unknown and corrective action cannot be taken. Quantitative research was conducted through the use of a survey in the form of a structured questionnaire. This research was cross-sectional as the focus was to assess the state of sustainability at a single point in time. IT project managers were randomly sampled to get an objective view of how committed they were to sustainability. This research made use of a project management sustainability maturity model to measure the extent to which sustainability is incorporated into IT projects. The findings are that IT project managers are not committed to sustainability. While the economic dimension yielded the best results, they were not ideal, and it is in fact the social and environmental dimensions that require the most attention. This lacking commitment to the social and environmental dimensions is not limited to select aspects within each dimension, as each dimension’s aspects are addressed to a similarly poor extent. This research suggests that sustainability needs to become a focus for IT project managers, but for this to happen, they require the relevant project management sustainability knowledge.


Author(s):  
Peter Haried

This study of international information systems (IS) offshoring highlights the idea that project success or failure is often in the eye of the beholder and that proper attention needs to be provided to both client and vendor perspectives. This research contributes by identifying noteworthy IS offshoring challenges faced by client and vendor stakeholders. This research synthesizes key findings from eight dyadic case studies consisting of 56 interviews in total from both client and vendor firms detailing their offshore experiences. The case investigations lead to the discovery of nine unique challenges encountered by client and vendor stakeholders. The challenges include a wide assortment of economic, personal responsibilities/expectations, and organizational offshore project management issues. The reported challenges can suitably guide client and vendor project managers in managing international IS offshore projects as well guide academic researchers to better understand techniques for managing offshore IS projects.


Author(s):  
Peter Haried

This study of international information systems (IS) offshoring highlights the idea that project success or failure is often in the eye of the beholder and that proper attention needs to be provided to both client and vendor perspectives. This research contributes by identifying noteworthy IS offshoring challenges faced by client and vendor stakeholders. This research synthesizes key findings from eight dyadic case studies consisting of 56 interviews in total from both client and vendor firms detailing their offshore experiences. The case investigations lead to the discovery of nine unique challenges encountered by client and vendor stakeholders. The challenges include a wide assortment of economic, personal responsibilities/expectations, and organizational offshore project management issues. The reported challenges can suitably guide client and vendor project managers in managing international IS offshore projects as well guide academic researchers to better understand techniques for managing offshore IS projects.


Author(s):  
João “Eduardo” Varajão ◽  
Hélio Silva ◽  
Mirjana Pejic-Bach

Project managers have a main role in all kinds of projects, and information systems (IS) projects are not an exception. In order to perform their activities well, project managers need to develop several complementary competences, including technical, contextual and behavioral competences. In literature we find important references on the project managers' general competences as, for instance, the ICB from IPMA. However, very little attention has been paid to the eventually distinctive features of IS project managers. In order to identify the most important competences of these project managers, we carried out a questionnaire-based survey. The results show that the top 12 competences are: communication; engagement and motivation; project requirements and objectives; leadership; reliability; results orientation; conflict and crisis; project orientation; teamwork; interested parties; resilience (emerging as a new competence); and ethics. Furthermore, results indicated that the project management bodies of knowledge are suitable to characterize the IS project manager's competences.


2016 ◽  
Vol 6 (2) ◽  
pp. 26-35
Author(s):  
Vladimír Krajčík ◽  
Pavel Vlček

Abstract The article focuses on process management in public administration using the specific case study of the statutory city of Ostrava. Based on the selected part of the PAPRIS methodology, the process management is verified, and conclusions from the application of information system e-SMO ("Electronic Statutory City of Ostrava") are generalized. Ostrava is third the biggest city in Czech Republic with approximately 320 thousand citizen. Article describes experiences with SW implements, which are used for model of process in public administration. Particulary at local authority of Ostrava town. Model of process is a basis for reengineering of process in state administration and preparation for implementation of big information systems. Mapping of process is providing implement and confirmation methodology to identify existing processes. Problem with its using consist in that, senior manager don’t informs, what organization is determination by processes. If are not described in given to organization current processes, or how would have had look new optimum processes, will not endeavour about reengineering successful. Procedural analysis namely offer tool and check methodology to identification current suit („ at") and it is possible him use either as instruction („ how so about to be") for reengineering function handling administrative and self-rule activities. Purpose of the article: The PAPRIS methodology was used when defining the objectives for implementation of the information system for public administration (PAPRIS - Process Approach - Public and Regional Information System). This methodology has been elaborated by one of the authors and published in a very general scheme when solving many case studies (Krajčík, 2006), (Krajčík, 2007), (Krajčík, 2013) (Krajčík, 2014). We assume that the PAPRIS is primarily a methodology with incorporated elements of procedural approach for project management in public administration information systems (PAIS). The specific supporting process of communication between the client and the e-SMO ("Electronic Statutory City of Ostrava") system has been chosen for verification. The model of supporting communication process, created by ARIS tools, is crucial, and the structure of scripts (ICM and IVR) is subsequently made. The aim of this article is to verify that the methodology is sufficient and appropriate to manage such a large project such, undoubtedly, is the e-SMO (Vlček, 2009). Methodology/methods: Defined productive and non-productive processes with their defined process cuts represent a crucial category for the process structure of IS projects. This is fully accepted by the PAPRIS methodology. Process cuts are understood, in the logic modelling according to the PAPRIS methodology, as clearly defined logic directional cuts in three-dimensional space of all project processes. The process set is systemically categorized, in a given logic directional cut, into mutually disjoint process subsets, which are characterized by this particular directional operator. The directional operator always has a clear logical allocation that is based on the construction of a process view. Theoretically, an infinite number of process views can be used. One of the important issues in a methodology for the case studies includes the size of the research sample. It is usually assumed that there is no ideal number of cases and that the number between four and ten usually provides good results. Other authors defining against any quantitative standards for any determination of the sample size of the case studies, since such an approach denies the internal logic of this methodology and the richness of the information obtained from participants in the research. Research which is carried out using case studies does not aspire on compliance with the requirement the representativeness of the sample. (Štrach, 2007). Methodology of case studies is among the established guidelines of qualitative research (Štrach, 2007). Research on using case studies in the last 30 years has seen an extraordinary increase in social-scientific research, including research on business and management (Dul, Hak, 2008). Scientific aim: The essential aim of this study is to describe the way the process cut defines a productive process and non-productive process, in accordance with the PAPRIS methodology using the specific example. While the triggering mechanism of the project production process is an event causing its own production - i.e. the specific output with added value for the customer, the project of non-productive process is caused by the project management event. Therefore, it is caused by the need to control, monitor, track, inspect, evaluate outputs, decide and regulate the project implementation. Findings: Within the support of the communication process, two examples were used to verify the methodology. The global perspective on the process was created in ARIS tools and the communication between the call centre and the client was made in Visio tools. The PAPRIS methodology is based on the concept of process variability, which has been clearly formulated. The fundamental direction of the process development, anticipated changes and the opportunity to react to them in accordance with defined objectives of the PAIS project are guaranteed.


2014 ◽  
Vol 9 (2) ◽  
pp. 101
Author(s):  
Alusyanti Primawati ◽  
Dewi Mustari

The software is an intermediary between system hardware computer with user as human. Based on the emerging software projects because of the importance of the functions already affects many functions in various aspects. Software projects that have become this need ultimately require management actions to manage the process in the project. Project management is necessary for the success of the project. Bereau Information System PT. X is one part of a company that provides software for functional PT. X. Analysis results from the concept of software project management information systems Bureau at PT. X when the process of designing application systems information accounting PT. X aims to answer how concept of project management Information Systems Bureau in designing the Accounting Information System applications. The methods used in this research is the study of the library with a general empirical approach based on experience and theories related to project management especially in software projects. The conclusions obtained that the activity of the management software on System Information Bureau is in compliance with the application of existing theory, but science is constantly evolving so as to do the development management activities after conducting evaluation regularly for the maintenance of long-term software project.


2020 ◽  
pp. 95-106
Author(s):  
Halyna KULYNA ◽  
Nataliya NALUKOVA

Introduction. In the conditions of digital society formation, the informatization of the social security sphere is a necessary component and guarantee of successful implementation of social policy aimed at quality and timely satisfaction of citizens' needs. Therefore, a prerequisite for the effective functioning of social protection and public service authorities is the development and technical innovation of social services and channels for their implementation through automated information systems, should be consistent with the innovation strategy of development of the social sphere as a composite digital economy of the state. Purpose is to substantiate the expediency of application of the newest digital technologies in the sphere of social security and novelization of social services on this basis, as well as to reveal features and advantages of social protection of the population through automated information systems and channels of their implementation. Results. The necessity and role of informatization in the modern digital society and the main challenges that lead to its implementation in the field of social security have been substantiated. The key automated information systems, which contribute to the construction of a common information space of the social sphere and allow to increase social protection of the population in domestic conditions, as well as the emergence of a new service-oriented social service with a wide range of information and communication services, have been analyzed. The necessity of training and retraining of highly qualified creative specialists of new specialties was noted and generalized principles of systems of skills development in the conditions of informatization, which are important in the selection of social workers, were defined. Conclusions. Social protection and social welfare institutions, when formulating their own strategies, should consider the information and communications technology vector of development as an essential means of improving their functioning, since this will determine the effectiveness of social policy implementation in the State and the level of satisfaction of citizens with social services. The results of informatization of social processes are manifested in the implementation of automated information systems and the construction of a single unified information space of social security, the development of new service products, electronic filing of documentation and simplification of procedures for obtaining social security, transparency of social security and, as a result, successful social policy.


Author(s):  
Simon Cleveland ◽  
Cristelia Hinojosa

Universities' core project management courses address the key principles and best practices of project management methodologies, while elective courses are utilized to introduce alternative project frameworks. The concept of project complexity can be taught to strengthen competency in project managers and enhance the success of the projects they manage. Previous instruction methods were evaluated to determine the key concepts that pertain to project complexity. This article proposes a preliminary framework for the development of an elective course on project complexity.


2016 ◽  
pp. 229-259
Author(s):  
Kijpokin Kasemsap

This chapter reveals the roles of Information Technology (IT) and Knowledge Management (KM) in Project Management (PM) metrics, thus explaining the theoretical and practical concepts of IT, IT capability, Information System (IS) effectiveness, KM, and PM; the measures of IT, KM, and PM metrics; and the significance of IT and KM in PM metrics. The fulfillment of IT and KM is essential for modern organizations that seek to serve suppliers and customers, increase business performance, strengthen competitiveness, and achieve constant success in global business. Therefore, it is crucial for modern organizations to explore their IT and KM applications, establish a strategic plan to routinely inspect their functional advancements, and promptly respond to the IT and KM needs of customers. The chapter argues that applying IT and KM in PM metrics has the potential to enhance organizational performance and achieve strategic goals in the social media age.


Author(s):  
Evon M.O. Abu-Taieh ◽  
Jeihan M. Abu-Tayeh ◽  
Alia Abu-Tayeh

Information Technology project management lingers between science and art. Many will not dwell on such a thought, and define the information technology project manager as the one person that gets the information technology project done. This paper introduces 74 best practices and traits for the novice information systems project manager. The 74 personal traits and best practices were collected from 35 project managers and are based on personal experiences on a number of IT projects. This article provides an interactive platform for the information system technology project manager by catering to their needs for practical insights toward efficient and individually tailored project management.


Sign in / Sign up

Export Citation Format

Share Document