Stakeholder Challenges in Information Systems Project Offshoring

Author(s):  
Peter Haried

This study of international information systems (IS) offshoring highlights the idea that project success or failure is often in the eye of the beholder and that proper attention needs to be provided to both client and vendor perspectives. This research contributes by identifying noteworthy IS offshoring challenges faced by client and vendor stakeholders. This research synthesizes key findings from eight dyadic case studies consisting of 56 interviews in total from both client and vendor firms detailing their offshore experiences. The case investigations lead to the discovery of nine unique challenges encountered by client and vendor stakeholders. The challenges include a wide assortment of economic, personal responsibilities/expectations, and organizational offshore project management issues. The reported challenges can suitably guide client and vendor project managers in managing international IS offshore projects as well guide academic researchers to better understand techniques for managing offshore IS projects.

Author(s):  
Peter Haried

This study of international information systems (IS) offshoring highlights the idea that project success or failure is often in the eye of the beholder and that proper attention needs to be provided to both client and vendor perspectives. This research contributes by identifying noteworthy IS offshoring challenges faced by client and vendor stakeholders. This research synthesizes key findings from eight dyadic case studies consisting of 56 interviews in total from both client and vendor firms detailing their offshore experiences. The case investigations lead to the discovery of nine unique challenges encountered by client and vendor stakeholders. The challenges include a wide assortment of economic, personal responsibilities/expectations, and organizational offshore project management issues. The reported challenges can suitably guide client and vendor project managers in managing international IS offshore projects as well guide academic researchers to better understand techniques for managing offshore IS projects.


Author(s):  
João “Eduardo” Varajão ◽  
Hélio Silva ◽  
Mirjana Pejic-Bach

Project managers have a main role in all kinds of projects, and information systems (IS) projects are not an exception. In order to perform their activities well, project managers need to develop several complementary competences, including technical, contextual and behavioral competences. In literature we find important references on the project managers' general competences as, for instance, the ICB from IPMA. However, very little attention has been paid to the eventually distinctive features of IS project managers. In order to identify the most important competences of these project managers, we carried out a questionnaire-based survey. The results show that the top 12 competences are: communication; engagement and motivation; project requirements and objectives; leadership; reliability; results orientation; conflict and crisis; project orientation; teamwork; interested parties; resilience (emerging as a new competence); and ethics. Furthermore, results indicated that the project management bodies of knowledge are suitable to characterize the IS project manager's competences.


2019 ◽  
Vol 20 (1) ◽  
pp. 530-556 ◽  
Author(s):  
N Joseph ◽  
C Marnewick

Although research has been done on sustainability in project management, little or no research has been conducted on sustainability within the domain of information system (IS) projects. This article reports on whether IS projects are executed sustainably and whether they contribute to organisational sustainability. A questionnaire, completed by 650 IS project managers, was used to determine the state of IS project sustainability. The results highlight that sustainability is not integrated into IS projects and IS project managers do not consider organisational sustainability. IS projects tend to focus on the economic dimension, i.e. increasing productivity and profits, with no thought being given to the social and environmental dimensions. This article recommends that sustainability should be incorporated into project management and IS best practices. Accordingly, the way IS projects are executed should be re-evaluated in terms of their sustainability.


2019 ◽  
Vol 9 (2) ◽  
pp. 56-65
Author(s):  
Michael Pace

Abstract This non-experimental correlational study extends previous research investigating the relationship between project management methodology and reported project success, as well as the moderating variables of industry and project manager experience. The sample included North American project managers with five years’ experience, 25 years of age or older, and experience with multiple project management methodologies. The survey instrument consisted of 58 questions, utilizing a 5-point Likert scale to record responses. The survey contained three sections, including demographic information, questions related to a successful project, and questions related to a less-than successful (failed / challenged) project. 367 usable responses were received. The examination of the constructs included Pearson’s correlation coefficient as well as linear regression to determine the impact of moderating variables. Results indicated that project management methodology has a weak correlation with reported project success, and this correlation is not moderated by industry nor project manager experience. The results did not align with previously conducted studies, illustrating a need to continue the study of methods impacting success including investigating additional moderating variables.


2016 ◽  
Vol 6 (2) ◽  
pp. 26-35
Author(s):  
Vladimír Krajčík ◽  
Pavel Vlček

Abstract The article focuses on process management in public administration using the specific case study of the statutory city of Ostrava. Based on the selected part of the PAPRIS methodology, the process management is verified, and conclusions from the application of information system e-SMO ("Electronic Statutory City of Ostrava") are generalized. Ostrava is third the biggest city in Czech Republic with approximately 320 thousand citizen. Article describes experiences with SW implements, which are used for model of process in public administration. Particulary at local authority of Ostrava town. Model of process is a basis for reengineering of process in state administration and preparation for implementation of big information systems. Mapping of process is providing implement and confirmation methodology to identify existing processes. Problem with its using consist in that, senior manager don’t informs, what organization is determination by processes. If are not described in given to organization current processes, or how would have had look new optimum processes, will not endeavour about reengineering successful. Procedural analysis namely offer tool and check methodology to identification current suit („ at") and it is possible him use either as instruction („ how so about to be") for reengineering function handling administrative and self-rule activities. Purpose of the article: The PAPRIS methodology was used when defining the objectives for implementation of the information system for public administration (PAPRIS - Process Approach - Public and Regional Information System). This methodology has been elaborated by one of the authors and published in a very general scheme when solving many case studies (Krajčík, 2006), (Krajčík, 2007), (Krajčík, 2013) (Krajčík, 2014). We assume that the PAPRIS is primarily a methodology with incorporated elements of procedural approach for project management in public administration information systems (PAIS). The specific supporting process of communication between the client and the e-SMO ("Electronic Statutory City of Ostrava") system has been chosen for verification. The model of supporting communication process, created by ARIS tools, is crucial, and the structure of scripts (ICM and IVR) is subsequently made. The aim of this article is to verify that the methodology is sufficient and appropriate to manage such a large project such, undoubtedly, is the e-SMO (Vlček, 2009). Methodology/methods: Defined productive and non-productive processes with their defined process cuts represent a crucial category for the process structure of IS projects. This is fully accepted by the PAPRIS methodology. Process cuts are understood, in the logic modelling according to the PAPRIS methodology, as clearly defined logic directional cuts in three-dimensional space of all project processes. The process set is systemically categorized, in a given logic directional cut, into mutually disjoint process subsets, which are characterized by this particular directional operator. The directional operator always has a clear logical allocation that is based on the construction of a process view. Theoretically, an infinite number of process views can be used. One of the important issues in a methodology for the case studies includes the size of the research sample. It is usually assumed that there is no ideal number of cases and that the number between four and ten usually provides good results. Other authors defining against any quantitative standards for any determination of the sample size of the case studies, since such an approach denies the internal logic of this methodology and the richness of the information obtained from participants in the research. Research which is carried out using case studies does not aspire on compliance with the requirement the representativeness of the sample. (Štrach, 2007). Methodology of case studies is among the established guidelines of qualitative research (Štrach, 2007). Research on using case studies in the last 30 years has seen an extraordinary increase in social-scientific research, including research on business and management (Dul, Hak, 2008). Scientific aim: The essential aim of this study is to describe the way the process cut defines a productive process and non-productive process, in accordance with the PAPRIS methodology using the specific example. While the triggering mechanism of the project production process is an event causing its own production - i.e. the specific output with added value for the customer, the project of non-productive process is caused by the project management event. Therefore, it is caused by the need to control, monitor, track, inspect, evaluate outputs, decide and regulate the project implementation. Findings: Within the support of the communication process, two examples were used to verify the methodology. The global perspective on the process was created in ARIS tools and the communication between the call centre and the client was made in Visio tools. The PAPRIS methodology is based on the concept of process variability, which has been clearly formulated. The fundamental direction of the process development, anticipated changes and the opportunity to react to them in accordance with defined objectives of the PAIS project are guaranteed.


2015 ◽  
Vol 764-765 ◽  
pp. 895-899
Author(s):  
Shiow Luan Wang ◽  
Thi Hoa Vu

Construction projects are becoming ever more complex and time driven, especially as the amount of project data and active project participants’ increase. For achieving a project success, project management not only must to meet time, cost, quality objectives, but also satisfies the project stakeholders needs related to the project management process. Project managers were difficult to effectively seizing, collecting and handling information which are generated from different systems. The elements of information presentation in web-based was contributed an important role to project management success. The purpose of this study is to provide a background to denote the enhancing project management via information presentation based on effective information technology/information systems which are emphasized in web-based.


2016 ◽  
pp. 865-881
Author(s):  
Bilal Ahmed Chaudhry

Project management is the use of different techniques to deliver project with meeting required objectives within defined constraints. Corporate strategy is plan by which organizations aspire to achieve organizational business goals. In recent times, project management is also used to achieve organizational goals by aligning project management with business strategy of an organization. This research is carried to explore the effects of aligning project management with business strategy on projects and organizations. Case studies were carried out in three organizations; one from public sector; one from private and one from semi-government organization. Results of this research revealed that alignment of business strategy with project management is beneficial for both organization and projects especially in terms of organizational growth and project success.


Author(s):  
Jerry Cha-Jan Chang ◽  
Gholamreza Torkzadeh

This article reports on results of a study on Information Systems (IS) project management skill set based on a two-round data collection from IS project managers and professionals. The first phase involved interviews with 47 project managers that resulted in identification of 12 important project management skills. In phase two, a survey was developed, based on phase 1 study results, to collect data from 41 IS project managers and professionals. Results identify rankings of the 12 skills as the 12 skills are further grouped into four categories of Communication and relationship management, Resource management, Change leadership, and Administrative.


2016 ◽  
Vol 9 (1) ◽  
pp. 8 ◽  
Author(s):  
Tâmara Patrícia Filgueira de Melo Moura

The current economic climate is driving the work of companies in the execution of projects that need to be managed and monitored periodically. Historically term goals, cost and quality are thermometers to measure success or failure of companies. For better project management, systems are needed that give support from the structure to the budget of each project, as well as its monitoring throughout the execution. The result of the components mentioned above reflect the overall results of the institution. Therefore, this study investigated through case study methodology, critical success factors for information systems that support project management in Sebrae/RN, and sought, through the project managers, to raise factors that influence decisions in search of improving the performance of the organization studied. Thus, a quantitative and qualitative research was applied. The results showed the critical success factors that hinder optimal performance of information systems from the structuring to the execution and monitoring of projects.