scholarly journals The Measurement of Key Performance Indicators (KPI) at Final Assembly Line and Delivery Center Division Using Sink’s Seven Performance Criteria Method in Indonesian Aerospace Industry

2016 ◽  
Vol 15 (2) ◽  
Author(s):  
Indah Kurniyati ◽  
Risya Zeline ◽  
Sri Yohana Simanjuntak ◽  
Yuniaristanto

<em><span>Global business competition greatly increased sharply in Indonesia, including in the food market. To succeed and grow in the competition, an organization should use measurement and management systems derived from the strategies and capabilities of the company. CV. Eka Sari is a company engaged in the field of catering, where business activity in CV. Eka Sari is more focused on providing the bread and cakes. The continued development of the catering business, demanding CV. Eka Sari to improve in every aspects of company performance, so that the company can remain competitive with other companies. Therefore, CV. Eka Sari is in need of performance measurement that aims to evaluate and plan its performance in order to achieve organizational goals. Performance measurement methods used by the company is Integrated Performance Measurement System (IPMS), which is a method that measures the performance of an integrated and based on the wishes of stakeholders. Objectives are determined to meet the wishes of stakeholders, so that will be determined key performance indicators. From the results of the identification, obtained 22 key performance indicators. To determine the performance criteria that need more attention then be weighted. Weighting is done using Hierachy Analytical Process (AHP). Weighting results generated from that aspect that must be considered are aspects of the process, then the performance criteria that must be considered, namely improving the efficiency and effectiveness of production, and Key Performance Indicators to be very aware of is the number of defective products.</span></em>


2012 ◽  
Vol 446-449 ◽  
pp. 340-344
Author(s):  
Mehdi Nourbakhsh ◽  
Shaik Hussein Mydin ◽  
Rosli Mohamad Zin ◽  
Samaneh Zolfagharian ◽  
Javier Irizarry ◽  
...  

Buildability seeks to improve efficiency of the overall building process by developing construction sensitive designs. The objective of this study is to investigate the relative importance of the key performance indicators of construction projects with respect to buildability at the design stage in the Malaysian construction industry. To achieve this objective, a questionnaire survey was distributed among key construction personnel to identify the most common buildability attributes in Malaysia. Then, an interview with eight construction professionals was conducted to compare the common buildability attributes with project performance criteria such as time, cost, quality, safety, and environment. The results reveal the equal importance of time and cost for buildability of the building, followed by quality, safety, and the environment.


CCIT Journal ◽  
2012 ◽  
Vol 6 (1) ◽  
pp. 17-34
Author(s):  
Untung Rahardja ◽  
Muhamad Yusup Eva ◽  
Rosyifa Rosyifa

SQL Server Reporting Services is a way to analyze data, create reports using the indicators and gauges. Indicators are minimal gauges that convey the state of a single data value at a glance, and most are used to represent the state of Key Performance Indicators. Manage and harmonize the performance of an institution's educational institutions, especially universities with the performance of individuals or resources, no doubt is one of the essential elements for the success of an entity of the institution. Integrate the performance of an educational institution with individual performance is not an easy process, and therefore required a systematic approach to manage it. Implementation of a strategic management system based Balanced Scorecard can be used as a performance measurement system that will continuously monitor the successful implementation of the strategy of any public educational institution and measure the performance of its resources in a comprehensive and balanced, not the quantity but the emphasis is more concerned with the quality, so the performance of educational institutions at any time can be known clearly. Contribution of Key Performance Indicators to manage and harmonize the performance of any public institution is a solution in providing information to realize the extent of work that has set targets, identify and monitor measures of success, of course, with performance indicators show a clear, specific and measurable.


Author(s):  
W.J. Parker ◽  
N.M. Shadbolt ◽  
D.I. Gray

Three levels of planning can be distinguished in grassland farming: strategic, tactical and operational. The purpose of strategic planning is to achieve a sustainable long-term fit of the farm business with its physical, social and financial environment. In pastoral farming, this essentially means developing plans that maximise and best match pasture growth with animal demand, while generating sufficient income to maintain or enhance farm resources and improvements, and attain personal and financial goals. Strategic plans relate to the whole farm business and are focused on the means to achieve future needs. They should be routinely (at least annually) reviewed and monitored for effectiveness through key performance indicators (e.g., Economic Farm Surplus) that enable progress toward goals to be measured in a timely and cost-effective manner. Failure to link strategy with control is likely to result in unfulfilled plans. Keywords: management, performance


Sign in / Sign up

Export Citation Format

Share Document