Much of the material dredged from the port of Rotterdam is contaminated to such a degree that it must be placed in specially constructed sites. The aim of Rotterdam is to ensure that the dredged material will once again be clean. This will entail the thorough cleansing of the sources of the contamination of the sediment in the harbours and in the River Rhine. The Rotterdam Rhine Research Project (RRP) is one of the means to achieve this based on: technical research, legal research, public relations and dialogues with dischargers.
The programme for five selected heavy metals is almost complete. For many heavy metal discharge points between Rotterdam and Rheinfelden, a specially devised independent load assessment has been carried out four times. Balance studies were used to determine the relative contributions of the point discharges to the total. Currently the results are being used in an attempt to negotiate agreements with a selected number of the major dischargers. At present, more detailed balance studies are being set up and exploratory measurements carried out for organic micropollutants.
It may be concluded that the research is progressing successfully and methods and techniques developed seem satisfactory and broadly applicable. The Rhine Action Programme encompasses an international effort to improve the quality of the Rhine water. Although the RRP plays a modest complementary role to the Rhine Action Plan, there is no doubt of the value of this Rotterdam initiative. The mode of work followed in the RRP contains elements that can be of use in combatting the contamination of the North Sea by rivers other than the Rhine.