scholarly journals The Integration of Hybrid Mini Thermal Power Plants into the Energy Complex of the Republic of Vietnam

Energies ◽  
2020 ◽  
Vol 13 (21) ◽  
pp. 5848
Author(s):  
Guzel Mingaleeva ◽  
Olga Afanaseva ◽  
Duc Toan Nguen ◽  
Dang Nayt Pham ◽  
Pietro Zunino

The article describes a method of integrating small distributed generation components in the power system of the Republic of Vietnam. The features of the energy system of Vietnam and the technologies used for mini thermal power plants are considered. The classification of small distributed generation components is presented with implantation of the most used resources of Vietnam—fossil and renewable. A generalized methodology for selection and calculation of technological schemes for mini thermal power plants is considered. The schemes of steam-turbine mini thermal power plants operating with coal and gas-turbine mini thermal power plants with solar air heaters are selected. Based on the calculation of the selected mini thermal power plant schemes, their distribution in the territory of the Republic of Vietnam has been obtained. The thermoeconomic efficiency has been chosen as the criterion for the best option for placing mini thermal power plants; its value for the proposed option is of 6.77%.

Author(s):  
Ye. G. Polenok ◽  
S. A. Mun ◽  
L. A. Gordeeva ◽  
A. A. Glushkov ◽  
M. V. Kostyanko ◽  
...  

Introduction.Coal dust and coal fi ring products contain large amounts of carcinogenic chemicals (specifically benz[a]pyrene) that are different in influence on workers of coal mines and thermal power plants. Specific immune reactions to benz[a]pyrene therefore in these categories of workers can have specific features.Objective.To reveal features of antibodies specifi c to benz[a]pyrene formation in workers of coal mines and thermal power plants.Materials and methods.The study covered A and G class antibodies against benz[a]pyrene (IgA-Bp and IgG-Bp) in serum of 705 males: 213 donors of Kemerovo blood transfusion center (group 1, reference); 293 miners(group 2) and 199 thermal power plant workers (group 3). Benz[a]pyrene conjugate with bovine serum albumin as an adsorbed antigen was subjected to immune-enzyme assay.Results.IgA-Bp levels in the miners (Me = 2.7) did not differ from those in the reference group (Me = 2.9), but in the thermal power plant workers (Me = 3.7) were reliably higher than those in healthy men and in the miners (p<0.0001). Levels of IgG-Bp in the miners (Me = 5.0) appeared to be lower than those in the reference group (Me = 6.4; (p = 0.05). IgG-Bb level in the thermal power plantworkers (Me = 7.4) exceeded the parameters in the healthy donors and the miners (p<0.0001). Non-industrial factors (age and smoking) appeared tohave no influence on specific immune reactions against benz[a]pyrene in the miners and the thermal power plant workers.Conclusions.Specific immune reactions against benz[a]pyrene in the miners and the thermal power plant workers are characterized by peculiarities: the miners demonstrate lower levels of class A serum antibodies to benz[a]pyrene; the thermal power plant workers present increased serum levels of class G antibodies to benz[a]pyrene. These peculiarities result from only the occupational features, but do not depend on such factors as age, smoking and length of service at hazardous production. It is expedient to study specific immune reactions to benz[a]pyrene in workers of coal mines and thermal power plants, to evaluate individual oncologic risk and if malignancies occur.


Akustika ◽  
2021 ◽  
pp. 133-137
Author(s):  
Vladimir Tupov ◽  
Vitaliy Skvortsov

The power equipment of thermal power plants is a source of noise to the surrounding area. One of the sources of noise for the surrounding area are gas distribution points (GDP) of thermal power plants (TPP) and district thermal power plants (RTS). Noise from gas distribution points may exceed sanitary standards at the border of the sanitary protection zone. The article shows that the radiated noise from gas distribution points depends on the power of the thermal power plant (natural gas consumption) and the type of valves. Three types of valves used in gas distribution points are considered. Formulas are obtained for calculating the width of the sanitary protection zone for gas distribution points for thermal stations, depending on the consumption of natural gas (electric power of the thermal power plant) and the type of valve. It is shown that, depending on the valve used, the noise level at the border of the sanitary protection zone can either meet sanitary standards or exceed them. This allows at the design stage to select the required type of valve or to determine mitigation measures from hydraulic fracturing.


Author(s):  
Suchismita Satapathy

All companies are dependent on their raw material providers. The same applies in the case of thermal power plants. The major raw material for a thermal power plant is the coal. There are a lot of companies which in turn provide this coal to the thermal power plant. Some of these companies are international; some are local, whereas the others are localized. The thermal power plants look into all the aspects of the coal providing company, before settling down for a deal. Some people are specifically assigned to the task of managing the supply chain. The main motive is to optimize the whole process and achieve higher efficiency. There are a lot of things which a thermal power plant looks into before finalizing a deal, such as the price, quality of goods, etc. Thus, it is very important for the raw material providers to understand each and every aspect of the demands of the thermal power plant. A combination of three methods—Delphi, SWARA, and modified SWARA—has been applied to a list of factors, which has later been ranked according to the weight and other relevant calculations.


Transport ◽  
2016 ◽  
Vol 33 (2) ◽  
pp. 389-398 ◽  
Author(s):  
Mirjana Vukićević ◽  
Zdenka Popović ◽  
Jovan Despotović ◽  
Luka Lazarević

Approximately 7 million tons of fly ash and slag are produced in thermal power plants in Serbia every year, only 3% of which is used in the cement industry. About 300 million tons of the ash-slag mixture are disposed in landfills, occupying an area of approximately 1600 hectares and generating environmental issues. Fly ash from Serbian power plants has pozzolanic properties and due to low concentration of calcium compounds (less than 10% CaO), they do not have self-cementing properties. According to the ASTM C618-15, this ash is from class F. According to the European Standard EN 197-1:2011, this ash is siliceous (type V) ash. From April 2014 to May 2015, an investigation of engineering properties of fly ash and mixtures of fly ash and slag from landfill (without or with binders of cement/lime) was conducted at the Laboratory of Soil Mechanics at the Faculty of Civil Engineering of the University of Belgrade (Serbia) and at the Institute for Testing of Materials – IMS Institute in Belgrade. The laboratory test results were showed in the study ‘Utilization of fly ash and slag produced in the TPP JP EPS thermal power plants for construction of railways’. Four kinds of waste materials from Serbian power plants were laboratory tested: (a) an ash-slag mixture from landfills at the ‘Nikola Tesla A’ thermal power plant; (b) fly ash from silos in the ‘Nikola Tesla B’ thermal power plant; (c) an ash-slag mixture from landfills at the ‘Kostolac A’ and ‘Kostolac B’ thermal power plants and ‘Srednje kostolačko ostrvo’ landfill; (d) fly ash from the ‘Kostolac’ thermal power plant. The following physical and mechanical properties of ash and mixtures were investigated: grain size distribution, Atterberg limits, specific gravity, moisture-density relationship, shear strength parameters in terms of effective stresses, California Bearing Ratio (CBR), and deformation parameters. The paper presents the results of laboratory tests of the materials with and without binders, and based on the laboratory results and previous research, the paper presents possibilities of using fly ash and slag for the construction of railway substructure in the planned construction and reconstruction of railway network in Serbia. The obtained results indicate that tested fly ash and ash-slag mixture have met the technical requirements and that they have the potential to be used in railway substructure.


Author(s):  
Washington Orlando Irrazabal Bohorquez ◽  
Joa˜o Roberto Barbosa ◽  
Luiz Augusto Horta Nogueira ◽  
Electo E. Silva Lora

The operational rules for the electricity markets in Latin America are changing at the same time that the electricity power plants are being subjected to stronger environmental restrictions, fierce competition and free market rules. This is forcing the conventional power plants owners to evaluate the operation of their power plants. Those thermal power plants were built between the 1960’s and the 1990’s. They are old and inefficient, therefore generating expensive electricity and polluting the environment. This study presents the repowering of thermal power plants based on the analysis of three basic concepts: the thermal configuration of the different technological solutions, the costs of the generated electricity and the environmental impact produced by the decrease of the pollutants generated during the electricity production. The case study for the present paper is an Ecuadorian 73 MWe power output steam power plant erected at the end of the 1970’s and has been operating continuously for over 30 years. Six repowering options are studied, focusing the increase of the installed capacity and thermal efficiency on the baseline case. Numerical simulations the seven thermal power plants are evaluated as follows: A. Modified Rankine cycle (73 MWe) with superheating and regeneration, one conventional boiler burning fuel oil and one old steam turbine. B. Fully-fired combined cycle (240 MWe) with two gas turbines burning natural gas, one recuperative boiler and one old steam turbine. C. Fully-fired combined cycle (235 MWe) with one gas turbine burning natural gas, one recuperative boiler and one old steam turbine. D. Fully-fired combined cycle (242 MWe) with one gas turbine burning natural gas, one recuperative boiler and one old steam turbine. The gas turbine has water injection in the combustion chamber. E. Fully-fired combined cycle (242 MWe) with one gas turbine burning natural gas, one recuperative boiler with supplementary burners and one old steam turbine. The gas turbine has steam injection in the combustion chamber. F. Hybrid combined cycle (235 MWe) with one gas turbine burning natural gas, one recuperative boiler with supplementary burners, one old steam boiler burning natural gas and one old steam turbine. G. Hybrid combined cycle (235 MWe) with one gas turbine burning diesel fuel, one recuperative boiler with supplementary burners, one old steam boiler burning fuel oil and one old steam turbine. All the repowering models show higher efficiency when compared with the Rankine cycle [2, 5]. The thermal cycle efficiency is improved from 28% to 50%. The generated electricity costs are reduced to about 50% when the old power plant is converted to a combined cycle one. When a Rankine cycle power plant burning fuel oil is modified to combined cycle burning natural gas, the CO2 specific emissions by kWh are reduced by about 40%. It is concluded that upgrading older thermal power plants is often a cost-effective method for increasing the power output, improving efficiency and reducing emissions [2, 7].


Vestnik MEI ◽  
2021 ◽  
pp. 66-76
Author(s):  
Pavel V. Roslyakov ◽  
◽  
Saina A. Sivtseva ◽  

According to the Russian environmental legislation, all sources of atmospheric pollution at Category I industrial enterprises must necessarily be equipped with automatic systems for monitoring and accounting of marker pollutants emissions. Such industrial facilities include more than 100 thermal power plants. The list of marker pollutants has been established in the relevant industry information and technical reference books on the best available technologies (ITR BAT). The list of marker pollutants monitored at thermal power plants by automatic systems includes nitrogen oxides NOX, sulfur dioxide SO2, carbon monoxide CO, and solid fuel ash. The use of domestically produced measuring equipment for these purposes is set forth as a priority task. However, there is currently no systematic information about gas analysis systems available in the market. The measuring instruments are analyzed, and a database of domestic sampling and non-sampling gas analytical systems is set up, which includes the main methods and means of measuring pollutants emissions, the technical characteristics of which meet the requirements of regulatory documents, and which allows specialists to optimally choose measuring instruments for organizing a continuous emission monitoring system (CEMS) at thermal power plants, taking into account specific conditions and requirements. The Microsoft Access Relational Database Management System (DBMS), which is a flexible database management system, is used to create the database. The developed database of measuring instruments for emission monitoring includes equipment from 33 Russian companies. The DBMS enables the user to organize data in tabular form and produce requests for selecting certain specified parameters. Both basic and additional criteria for selecting measuring instruments can be included in the request form. The developed DBMS takes into account the measured parameters of medium, the measurement method and means, compliance with BAT, measurement ranges and errors, estimated and warranty service life, mass and dimensional characteristics, and cost and complexity of maintenance, all serving for the convenience of selecting and implementing CEMS at thermal power plants. An example of the choice of measuring instruments from the proposed database for monitoring the marker pollutants emissions for the MPEI thermal power plant using the optimal choice algorithm is given.


Author(s):  
Muhammad A. Raza ◽  
Krishan L. Khatri ◽  
Sunila Akbar ◽  
Muhammad I. U. Haque

In this paper, performance evaluation and technical audit of a 747 MW thermal power plant consisting of three generating units is conducted. The factors influencing the performance of the plant have been identified and improvements in processes and mechanical, electrical, instrumentation, and safety engineering are suggested. These improvements would result in better profitability, productivity, and performance. The paper further discusses technical issues and challenges and identifies key areas where improvements are possible. Future recommendation for the operation of the plant that would result in better throughput are also presented. The methodology of performance analysis presented in the paper will help improving operational efficiency of thermal power plants in developing countries.


2020 ◽  
Vol 5 ◽  
pp. 42-54
Author(s):  
Evgueny Boiko ◽  
Igor Polikarpov ◽  
Aleksey Bobrov ◽  
Sergey Sizintsov ◽  
Valeriy Volnev ◽  
...  

According to digital engineering, an intelligent digital infrastructure is intended to optimize performance of thermal power plants. This paper presents an intelligent digital approach to power facility management. As an example, Siberian Generating Company thermal power plants were considered. The authors have developed specialized software able to control and predict thermal power plant process equipment conditions comparing monitoring data and failure probabilities with appropriate mathematical models. Based on a life-cycle monitoring model, a management methodology was created to be applied to technical and business processes of a power facility to improve its maintenance strategy.


Author(s):  
T. Mita ◽  
N. Ando ◽  
A. Kawauchi ◽  
K. Morikawa

A fully-fired combined cycle power plant (FFCCPP) combines a steam thermal power plant with a gas turbine. Hot exhaust gases fed from the gas turbine are used as combustion air for the boiler, thus increasing total plant output and efficiency. An unusually hot spell in Japan in the summer of 1990 brought about such a rapid surge in power demand for air conditioning so that all electric power companies registered record highs in consumption. This promoted Chubu Electric Power Co. to decide to add a 154-MW gas turbine to each of its six existing steam thermal power plants (four 700-MW and two 375-MW units), thus repowering their system into an FFCCPP. Construction work began in 1992. In September, 1994, two 700-MW steam thermal power plants (Chita Thermal Power Plant’s No. 6 unit and Chita Second Thermal Power Plant’s No. 1 unit) were modified into FFCCPPs, which then began operating in a trouble-free manner. This paper reports the characteristics and test-run results of the above two plants, which have been operating in good condition as the largest-capacity FFCCPPs in the world.


Sign in / Sign up

Export Citation Format

Share Document