scholarly journals Spillage Forecast Models in Hydroelectric Power Plants Using Information from Telemetry Stations and Hydraulic Control

Energies ◽  
2021 ◽  
Vol 14 (1) ◽  
pp. 184
Author(s):  
Pedro H. M. Nascimento ◽  
Vinícius A. Cabral ◽  
Ivo C. Silva Junior ◽  
Frederico F. Panoeiro ◽  
Leonardo M. Honório ◽  
...  

Hydroelectric power plants’ operational decisions are associated with several factors, such as generation planning, water availability and dam safety. One major challenge is to control the water spillage from the reservoir. Although this action represents a loss of energy production, it is a powerful strategy to regulate the reservoir level, ensuring the dam’s safety. The decision to use this strategy must be made in advance based on level and demand predictions. The present work applies supervised machine learning techniques to predict the operating condition of spillage in a hydroelectric plant for 5 h ahead. The use of this method, in real time, aims to assist the operator so that he can make more assertive and safer decisions, avoiding waste of energy resources and increasing the safety of dams. The Random Forest and Multilayer Perceptron methods were used to define the architecture compared to the forecasting capacity. The proposed methodology was applied to a 902.5 MW Hydroelectric Power Plant located on the Tocantins River, Brazil. The results demonstrate effective assistance to operators in the decision-making, presenting accuracy of up to 99.15% for the spill decision.

2014 ◽  
Vol 136 (2) ◽  
Author(s):  
Kaufui Vincent Wong

There is a controversy brewing for about 10 years that hydroelectric power plants are not a clean, renewable source of electricity. The current review indicates that the source of methane is not in the mechanics or mechanical design of the equipment used. The source of the methane is from nature, and man's failure to do the right thing. This methane may be reduced or completely eliminated. If this cannot be accomplished or if it is too expensive to retrofit the hydroelectric plant, then the deep water may be preprocessed (and the methane collected) before being used in the water turbine. Several methods have been introduced and discussed. Details have been omitted so that practicing engineers and other professionals can obtain funds to research and develop or invent the practical solutions suited to conditions local to the problem.


2021 ◽  
Vol 2131 (3) ◽  
pp. 032071
Author(s):  
A A Devyatkin ◽  
S V Titov ◽  
V V Konovalov

Abstract Comparative analysis of methods of obtaining electricity from a renewable energy source is carried out. Various designs and op-tions for small hydroelectric power plants have been proposed. Positive and negative factors of structures under consideration and their impact on the environment are analyzed. The main characteristics of the flow (speed, head) for the choice of the optimal variant of hydroelectric power plant have been determined. Three variants of impellers for free-flow hydroelectric power plants are proposed with a comparison of the efficien-cy of each variant. An analysis was carried out and an impeller based on a Darrieus rotor was selected for further research. Simulation was performed in the Flow Simulation program. The initial data for the design of Darrieus rotor operating in a liquid were the diameter and width of the impeller. The calculations involved a rotor with straight and swirling blades. The swirling blades rotor is self-starting. In the course of the calcula-tion, the speed of the liquid flow approaching the rotor and the rotor speed were changed. As a result of cal-culation, the value of the positive moment for self-starting was determined, which occurs at an incident flow velocity of at least 1.3 m/s.


Author(s):  
M. I. Balzannikov ◽  
E. G. Vyshkin

The paper presents the analysis of different types of impact the hydroelectric power plants’ reservoirs could make on the environment. Hydroelectric power plants (HPP) produce ecologically safe energy and correspond to the modern striving for sustainability because they are operated on renewable energy sources. At the same time they can provoke various potential dangers for the environment. The objective of the investigation is to demonstrate the interrelation between the type and structure of a hydroelectric power plant and the way its reservoir may impact on the nature surrounding the plant. These effects may be direct and indirect, positive and negative and vary from insignificant that can be easily fixed to those that are irreversible and catastrophic. The latter should be taken into account during the design of HPP.


Author(s):  
Mikhail Balzannikov

The article describes run-of-the-river hydroelectric power plants. The authors specify the importance of performing technical and economic calculations in justifying the large-sized units of the water-supplying channel of a run-of-the-river hydroelectric power plant: turbine pits and suction (discharge) pipes. The study shows that the amount of construction work and the total cost of building a hydroelectric power plant depend on the size of these water supply units. The research objective is to analyze the validity of establishing the main dimensions of the suction pipes for modern technical and economic conditions. The researchers use the discounted income method. The calculations are performed for a hydroelectric power plant with an elbow suction pipe. The analysis of how the operating conditions of a hydroelectric power plant influence the savings of construction resources is carried out. The analysis shows that saving construction resources by reducing the length of the suction pipe is justified if the hydroelectric power plamt is designed to work only at peak power loads. For hydroelectric power plants operating at semi-peak or base power loads, the additional construction costs would be appropriate if leading to the decrease in pressure loss and to the increase in electricity generation.


Energies ◽  
2019 ◽  
Vol 12 (8) ◽  
pp. 1502 ◽  
Author(s):  
Evrencan Özcan ◽  
Rabia Yumuşak ◽  
Tamer Eren

In this study, maintenance planning problem is handled in one of the hydroelectric power plants which directly affect Turkey’s energy supply security with a fifth share in the total generation. In this study, a result is obtained by taking into consideration the multi-objective and multi-criteria structure of the maintenance planning in the hydroelectric power plants with thousands of complex equipment and the direct effect of this equipment on uninterrupted and low-cost electricity generation. In the first stage, the risk levels of the equipment in terms of the power plant are obtained with the combination of AHP (Analytical Hierarchy Process) and TOPSIS (technique for order preference by similarity to ideal solution) which are frequently used in the literature due to their advantages. Department-based maintenance plans of all equipment for periodic and revision maintenance strategies are formed by integrating these values into the time allocated for maintenance and the number of employees constraints. As a result of the application of this methodology which is designed for the first time in the literature with the integration of multi-criteria decision-making methods for the maintenance planning problem in a hydroelectric power plant, all elements that prevent the sustainable energy supply in the power plant are eliminated.


2011 ◽  
Vol 59 (4) ◽  
pp. 507-511 ◽  
Author(s):  
A. Sikorski ◽  
M. Korzeniewski

AC/DC/AC converter in a small hydroelectric power plant The article discusses application of AC/DC/AC converter cooperating with an induction generator in small hydroelectric power plants. The induction generator works with power grid or a separated group of receivers, enabling to generate power even at low speeds of the turbine. The article provides also results of the investigation concerning the functioning of the generator coupled with AC/DC/AC converter in steady and transient states during start-up and voltage decay.


2018 ◽  
Vol 7 (2.13) ◽  
pp. 173
Author(s):  
Alaybek D. Obozov ◽  
Ruslan A. Akparaliyev ◽  
Taalaybek T. Mederov ◽  
Victor G. Krasnov

This paper is dedicated to comparative analysis and description of a micro hydroelectric power plant with bi-rotor hydro generator. Based on the characteristics analysis, this paper describes a renewable energy source for a small watercourse; the feasibility of micro hydroelectric power plants with bi-rotor hydro generator is demonstrated. The features of their operation require in-depth research to substantiate parameters of such installations. This paper presents the analysis of the usage of micro hydroelectric solutions with bi-rotor hydro generator. The lattice theory problem was solved, which made it possible to determine the shape of the profile according to a given law of velocity distribution (pressure) on the contour. The experimental stand was developed, and the experiments were conducted to identify the dependence of the frequency of rotation from the flow and the dependence of the rotational frequencies of hydro turbines from various loads. Based on the results obtained, the optimum values of the rotational speed were identified. Presented results of experimental research are of significance and can be applied practically in design of micro hydroelectric power plants with bi-rotor hydro generator. Keywords: Bi-Rotor Hydro Generator; Differential Equation; Rotational Flows; Function; Hydraulic Models; Kinetic Energy; Renewable Energy Sources; Velocity Measurements.                                                                                                                     This paper is dedicated to comparative analysis and description of a micro hydroelectric power plant with bi-rotor hydro generator. Based on the characteristics analysis, this paper describes a renewable energy source for a small watercourse; the feasibility of micro hydroelectric power plants with bi-rotor hydro generator is demonstrated. The features of their operation require in-depth research to substantiate parameters of such installations. This paper presents the analysis of the usage of micro hydroelectric solutions with bi-rotor hydro generator. The lattice theory problem was solved, which made it possible to determine the shape of the profile according to a given law of velocity distribution (pressure) on the contour. The experimental stand was developed, and the experiments were conducted to identify the dependence of the frequency of rotation from the flow and the dependence of the rotational frequencies of hydro turbines from various loads. Based on the results obtained, the optimum values of the rotational speed were identified. Presented results of experimental research are of significance and can be applied practically in design of micro hydroelectric power plants with bi-rotor hydro generator.          


Water ◽  
2021 ◽  
Vol 13 (4) ◽  
pp. 500
Author(s):  
Maria Alejandra Aparicio Ardila ◽  
Ricardo D. dos Santos Junior ◽  
Marcelo Kobelnik ◽  
Clever Aparecido Valentin ◽  
Marlon Silva Schliewe ◽  
...  

In Brazil, hydroelectricity represents close to 70% of the energy consumed in the country. However, hydroelectric plant operations may be affected by the deposit of sediments for erosive processes on reservoir margins. This study presents the results of implementing two semi-rigid erosion control techniques installed on reservoir margins of two Brazilian Hydroelectric Power Plants (HPPs). These techniques were the gabion and gabion mattress used as a mixed technique and geogrid mattress technique. This paper highlights the importance of implementing geotextiles in the construction process of these erosion control techniques, taking advantage of their separation properties. The performance of the techniques was evaluated using qualitative performance variables and by differential bathymetry studies performed in 2016 and 2020 in the experimental units installed in each HPP. Moreover, the degradation of the geotextiles in each installation was evaluated through thermal analysis. The erosion control techniques that showed the best results were gabion and gabion mattress. Regarding the exhumed geotextiles, thermal analyses have shown that the commercial geotextiles that were used can withstand temperatures of up to 200 °C leading to no changes to their structure.


Energies ◽  
2021 ◽  
Vol 14 (24) ◽  
pp. 8398
Author(s):  
Marcos Tadeu Barros de Oliveira ◽  
Patrícia de Sousa Oliveira Silva ◽  
Elisa Oliveira ◽  
André Luís Marques Marcato ◽  
Giovani Santiago Junqueira

The present work proposes a Monte Carlo Simulation (MCS) to obtain availability projections for Hydroelectric Power Plants (HPP), based mainly on regulatory aspects involving the Availability Factor (AFA). The main purpose of the simulation is to generate scenarios to obtain statistics for risk analysis and decision-making in relation to the HPP. The proposed methodology consists of two steps, firstly, the optimization of the maintenance schedule of the hydroelectric plant is carried out, in order to allocate the mandatory maintenance in the simulation horizon. Then, for the MCS, scenarios of forced shutdowns of the Generating Units (GU) will be generated, which directly influence the operation and, consequently, the availability of the HPP. The scenarios will be inserted into an operation optimization model, which considers the impact of forced shutdown samples on the MCS. The proposed modeling was applied using real data from the Santo Antônio HPP, which is one of the largest hydroelectric plants in Brazil.


Author(s):  
Gustavo Alberto Villamarin ◽  
Flor Nancy Díaz-Piraquive

Although Colombia has more than 50 years of experience developing hydropower projects, the recent Hidroituango project crisis has opened the debate regarding risk management (RM) in generation power projects, especially for non-conventional renewable energy sources (NCRES) where there are no academic studies for Colombian case. This chapter develops a methodological proposal based on PMBOK, ISO standard, and Colombian technical standards, that will allow identification, assessment, and management of the risks inherent in small hydroelectric power plant (SHPP) projects. All this in the context of the opportunities generated by Law 1715 of 2014 and the mega global trend of transition from fossil sources of energy to NCRES. The methodology was built based on: a state of the art review, an expert's knowledge consultation, and a Delphi expert's assessment analysis. The result is a project risk management methodology that includes: holistic identification of risk variables in SHPP projects, assessment of experts and response to inherent and residual risks.


Sign in / Sign up

Export Citation Format

Share Document