MECHATRONIC DYNAMIC STAND FOR RESEARCH OF PLAIN BEARINGS POWER GENERATING UNITS

Author(s):  
R.N. POLYAKOV ◽  
N.V. TOKMAKOV ◽  
A.V. GORIN ◽  
M.A. TOKMAKOVA

The article considers and analyzes various types of experimental equipment for power generating machines and aggregates. Based on the results of the analysis, a dynamic stand for the study of plain bearings is presented. An information and measurement system for ensuring the operation of a dynamic stand based on the software and hardware complex of the company "National Instruments"is proposed. The results of experimental studies of plain bearings used in power generating equipment are presented.

Author(s):  
M.E. BONDARENKO ◽  
R.N. POLYAKOV ◽  
I.V. RODICHEVA ◽  
M.A. GRIADYNOVA

The article presents an analysis of various types of experimental equipment that simulates the operation of flexible shaft lines of power generating machines and units. Based on the analysis results, an experimental setup is presented for investigating the dynamic characteristics of multi-support rotor systems. An information-measuring system is proposed to ensure the operation of a dynamic stand based on a hardware-software complex of the "National Instruments" company. The results of experimental studies of multi-support rotor systems used in power generating equipment are presented.


Author(s):  
Mariya Buravleva ◽  
Davyd Klikno ◽  
Andrey Gladyshev

The paper presents the results of the development of a software and hardware complex for simulating a satellite communication channel. Shown is a block diagram, composition and results of experimental studies.


2021 ◽  
Vol 285 ◽  
pp. 07037
Author(s):  
Vladimir Malikov ◽  
Maxim Ananyev ◽  
Alexey Ishkov ◽  
Leonid Nikonov

This paper describes the development and experimental study of a software and hardware complex designed for studying the conductive tracks of printed circuit boards. In the course of this development, a subminiature eddy-current transducer and a measuring system capable of performing measurements using the newly developed transducer were created. The paper contains descriptions of the main parameters of the developed measuring system, and also presents the results of experiments conducted with various printed circuit boards, both with defect-free and those with artificial model defects. These experiments made it possible to confirm the possibility of using the developed measuring system and eddy-current transducer for controlling the conductive tracks on printed circuit boards and determining their quality.


2005 ◽  
Vol 36 (3) ◽  
pp. 181-190
Author(s):  
B. I. Basok ◽  
S. S. Ryzhkov, Jr.

2010 ◽  
Vol 69 (17) ◽  
pp. 1517-1527 ◽  
Author(s):  
Ye. N. Belov ◽  
O. A. Voytovich ◽  
T. A. Makulina ◽  
G. A. Rudnev ◽  
G. I. Khlopov ◽  
...  

Author(s):  
S. V. Grigorieva ◽  
A. V. Olshansky

The article is devoted to the problems of maintenance of overhead power lines in the Far North of Western Siberia. For improvement of quality and reliability of power supply of consumers in the conditions of the Far North of Western Siberia, decrease in operational costs and volumes of the carried-out emergency works the hardware-software complex for expeditious inspection, assessment and forecasting of change of technical condition of constructive part of air lines (VL) of 35-220 kV is developed, the structure of the hardware-software complex of registration of the condition of constructive part of VL of 35-220 kV and structure of the hardware-software complex of storage., processing and analysis of the obtained data on the States of the constructive part of the VL 35-220 kV. 


2012 ◽  
Vol 622-623 ◽  
pp. 1378-1383
Author(s):  
Peng Han ◽  
Yang Li

The ship electric field has become a new physical field which is widely concerned at home and abroad in recent years. For the research of ship electric field, one of the most effective methods is to measure it underwater. According to the analysis of ship electric field signal’s characteristics, the ship electric field measurement system based on MSP430F149 was designed and the key technologies of software and hardware were also presented in this paper. The results of experiment demonstrated that the system could effectively measure the ship electric field signal in a low SNR. Meanwhile, it has the advantages of low power consumption, high accuracy and credible.


2013 ◽  
Vol 561 ◽  
pp. 614-619 ◽  
Author(s):  
Qing Ling Li ◽  
Xiao Qing Xie ◽  
Jun Chao ◽  
Xuan Xin ◽  
Yan Zhou

A numerical study with FLUENT software has been carried out as to air performance in the slope solar energy power plant. The velocity field, temperature and pressure fields in the solar chimney, and the simulated result were compared with the simulated result of traditional solar chimney power generating equipment. The simulation results show that distribution of the temperature field and the velocity field in slope solar energy power plant and traditional solar chimney power generating equipment. In the case of the same height, the velocity of traditional is slightly larger than the slope style's, but there is little difference. In order to achieve the same power generation effect, the overall height of slope style is more than the traditional style, but the vertical chimney height of traditional style is greater than the slope style. The cost of construction of vertical chimney is expensive, and many problems have been considered, like radix saposhnikoviae and earthquake prevention, the heat collector also need to be cleaned on time. The slope style can take full advantage of land, the height of vertical chimney will be reduced, so the construction of the chimney will be relatively easy. Rainwater can clean the heat collector when it runs down from it. All things considered. The slope solar energy power plant has more development prospects.


2020 ◽  
Vol 15 (6) ◽  
pp. 795-801
Author(s):  
N. V. Aksenova ◽  
A. A. Nizov ◽  
O. N. Selyavina ◽  
E. I. Suchkova ◽  
E. V. Filippov

Aim. To study the effectiveness and benefits of blood pressure (BP) remote monitoring in outpatients with hypertension.Material and methods. The study included 100 patients with a verified diagnosis of hypertension, who didn’t achieve target BP pressure levels. The patients measured their BP twice a day over 6 months with facilities with automatic data transmission over GSM-channel to a remote monitoring center. BP parameters were being transmitted online to the remote monitoring center, where they were being processed and transferred to the personal account planner (created by the Web interface based on the software and hardware complex) of the attending physician and operator of the remote monitoring center. It is important that doctor received information only on clinically significant measurement results, based on which he determined the urgency of contact with the patient and the further tactics of his management.Results. No malfunctions in the work of communication facilities, technical failures in the software and hardware complex were registered over the entire period of the study. After 6 months of the monitoring it was possible to achieve target BP levels less than 135/85 mm Hg in 70% of patients. The proportion of patients with a high level of normal BP increased from 10% to 19%, while the proportion of patients with grade 1 and 2 of hypertension decreased significantly (from 33% to 7% and from 54% to 3%, respectively). At the beginning of telemedicine monitoring 3% of patients had stage 3 of hypertension, at the end of the study – 1%.Conclusion. The technology of telemedicine monitoring has shown itself as a simple, affordable and reliable way of management of outpatients with hypertension in conditions of real clinical practice. It was possible to achieve BP levels less than 135/85 mm Hg in 70% of patients by the method of remote outpatient monitoring. BP remote monitoring changed fundamentally the decision-making strategy of the patients management: it was not the patient who independently determined the need for consultation with a medical professional, but the attending physician made a decision on the method and urgency of contact with the patient on the basis of the data of objective monitoring indicators.


Sign in / Sign up

Export Citation Format

Share Document