scholarly journals Exploration of Building Information Modelling (BIM) Application: An Understanding Among Quantity Surveyor in Malaysia

2020 ◽  
Vol 5 (2) ◽  
pp. 1-11
Author(s):  
Nadzirah Zainordin ◽  
◽  
Zamzarina Md Judyar ◽  
Nur Syahirah Zafarull ◽  
Nor Azizah Zalin ◽  
...  

This study begins with a broad literature review to understand the Building Information Modelling (BIM) concept. Quantity Surveyors star as an influential role as qualified, trained, and proficient in dealing with glitches relating to construction expenditure, supervision, and consultation in the construction industry. When the task is getting crucial, an assistant from technology may help faster and smoother the process and task. This study aims to investigate an understanding of the application of BIM among Quantity Surveyor in Malaysia. According to the Board of Quantity Surveyors, Malaysia's official website, 101 registered Quantity Surveying Consultant firms were in 2018. This study targeted 1000 persons from different firms and expected to respond from at least 278 persons due to time constraints. The other criteria of the respondents include years of experience in the industry. Quantity Surveying Consultant firms would be the most suitable people to answer a questionnaire survey for this study. The registered Quantity Surveying Consultant firms are very well proficient in the quantity surveying practice and services. Therefore, by choosing Quantity Surveying Consultant firms to be the respondent may help in getting the most consistent answer and higher accuracy of the exploration of Quantity Surveyors productivity by adopting the Building Information Modelling (BIM) concept in Quantity Surveyor, which will further enhance the awareness of benefits of BIM to the Quantity Surveyor profession itself.

2021 ◽  
Vol 13 (3) ◽  
pp. 142-150
Author(s):  
Berco Venter ◽  
Sams Pfukani Ngobeni ◽  
Hendri du Plessis

Abstract The construction industry has often been described as stagnant and out-of-date due to the lack of innovation and innovative work methods to improve the industry (WEF, 2016; Ostravik, 2015). The adoption of Building Information Modelling (BIM) within the construction industry has been relatively slow (Cao et al., 2017), particularly in the South African Construction and Built Environment (CBE) (Allen, Smallwood & Emuze, 2012). The purpose of this study was to determine the critical factors influencing the adoption of BIM in the South African CBE, specifically from a quantity surveyor’s perspective, including the practical implications. The study used a qualitative research approach grounded in a theoretical framework. A survey questionnaire was applied to correlate the interpretation of the theory with the data collected (Naoum, 2007). The study was limited to professionals within the South African CBE. The study highlighted that the slow adoption of BIM within the South African CBE was mainly due to a lack of incentives and subsequent lack of investment towards the BIM adoption. The study concluded that the South African CBE operated mainly in silos without centralised coordination. The BIM adoption was only organic. Project teams were mostly project orientated, seeking immediate solutions, and adopted the most appropriate technologies for the team’s composition. The study implies that the South African CBE, particularly the Quantity Surveying profession, still depends heavily on other role-players in producing information-rich 3D models. Without a centralised effort, the South African Quantity Surveying professionals will continue to adopt BIM technology linearly to the demand-risk ratio as BIM maturity is realised in the South African CBE.


2020 ◽  
Vol 26 (6) ◽  
pp. 551-563
Author(s):  
Theophilus Olowa ◽  
Emlyn Witt ◽  
Irene Lill

Digitalisation of the construction industry is both driving changes in construction education to meet emerging industry needs and providing opportunities for new delivery approaches. Universities are responding to these challenges in diverse ways including in their use of Building Information Modelling for construction education (BfCE). This research is aimed at understanding the existing approaches to BfCE. A systematic literature review of BfCE in universities was carried out which identified 305 relevant articles including 44 specific cases of BfCE. These were qualitatively analysed and a Straussian Theory Model (STM) was adopted to understand the different BfCE approaches reported in the literature, the contextual and intervening conditions which give rise to them and their consequences in order to develop a conceptual framework which sets out the relationships between these and the digitalisation of the construction industry. This study provides construction educators with a descriptive typology that depicts all possible BfCE approaches and which could assist them in determining suitable approaches and to conceptualise new approaches for teaching students to use Building Information Modelling (BIM) and also for leveraging BIM to enhance their teaching of other topics.


2020 ◽  
Vol 5 (1) ◽  
pp. 8-21
Author(s):  
Mashanim Mahazir ◽  
◽  
Puah Kar Ros ◽  

The construction industry believes that Building Information Modelling (BIM) are able to reduce the problem faced by the infrastructure world. Nowadays, the construction industry faced many problems due to dependency on the traditional practice. Therefore, the application of BIM in the construction industry will help the construction projects become more successful. Fourteen (14) papers were referred through extensive literature review and the study aims to discuss the benefits and barriers of using BIM in the construction industry. Furthermore, the strategic planning being implemented the BIM within the next 5 years in Malaysia also been discussed.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Fatma Othman Alamoudy

Purpose This paper aims to develop a framework for optimising building performance through the integration between risk management (RM) and building information modelling (BIM) during the design process. Design/methodology/approach To achieve this aim, a research strategy consisting of literature review, case studies and survey questionnaire is designed to accomplish four objectives. First, to examine the concepts of design process, building performance, RM and BIM; second, to present three case studies to explain the role of using RM and BIM capabilities towards optimising building performance; third, to investigate the perception and application of architectural design firms in Egypt towards the role of RM and BIM for enhancing building performance during the design process; and finally, to develop a framework integrating RM and BIM during the design process as an approach for optimising building performance. Findings Through literature review, the research identified 18 risks that hamper optimising building performance during the design process. In addition, 11 building performance values and 20 BIM technologies were defined. Results of data analysis showed that “Design budget overrun”, “Lack of considering life cycle cost” and “Inefficient use of the design time” were ranked the highest risks that affect the optimisation of building performance. Respondents ranked “Risk avoid” or “Risk transfer” as the most risk responses adopted in the Egyptian context. In addition, “BIM As Built” was ranked the highest BIM technology used for overcoming risks during the design process. These findings necessitated taking action towards developing a framework to optimising building performance. Originality/value The research identified the risks that affect optimising building performance during the design process. It focuses on improving the design process through using the capabilities of BIM technologies towards overcoming these risks during the design process. The proposed framework which integrates RM and BIM represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Apeesada Sompolgrunk ◽  
Saeed Banihashemi ◽  
Saeed Reza Mohandes

Purpose The purpose of this study is to identify and analyse the key measurable returning factors, value drivers and strategic benefits associated with building information modelling (BIM) return on investment (ROI). The findings of this study provide researchers and practitioners with up-to-date information in formulating appropriate strategies to quantify the monetary value of BIM. The suggested research agenda provided would also advance what is presently a limited body of knowledge relating to the evaluation of BIM ROI. Design/methodology/approach To fill the identified gap, this study develops a comprehensive systematic review of mainstream studies on factors affecting BIM ROI published from 2000 to 2020. A total of 23 academic records from different sources such as journals, conference proceedings, dissertation and PhD theses were identified and thoroughly reviewed. Findings The reported BIM ROI ranged greatly from −83.3% to 39,900%. A total of 5 returning factors, namely, schedule reduction and compliance, productivity improvement, request for information reduction, rework reduction and change orders reduction were identified as the most commonly reported factors that influence BIM ROI. Four quantification techniques including general assumptions-based theoretical model, perceived BIM ROI based on survey, factors affecting BIM ROI with no reported ROI and quantified BIM ROI based on a case study were observed and pointed out in the review, together with their limitations. Finally, three major gaps were raised as the lack of consideration on the likelihood of BIM assisting in a construction project, intangible returning factors influencing BIM-based projects and industry standards in benchmarking BIM ROI. Practical implications The outcomes of this study would assist practitioners by providing the current evaluation techniques that address the limitations with BIM investment and present issues relating to the economic evaluation of BIM in the construction industry. It is also expected that presenting a deeper and wider perspective of the research work performed until now will direct a more focussed approach on productivity improvement efforts in the construction industry. Originality/value This study identifies and analyses the key measurable returning factors, value drivers and strategic benefits associated with BIM ROI on an industry scale rather than a particular organisation or a project scale.


2020 ◽  
Vol 10 (13) ◽  
pp. 4444 ◽  
Author(s):  
José Pedro Carvalho ◽  
Luís Bragança ◽  
Ricardo Mateus

Building Information Modelling (BIM) is creating new opportunities for the Architecture, Engineering and Construction industry. One of them is the integration of the Building Sustainability Assessment (BSA) during the design process. Currently, an approach for using BIM to foster and optimise the application of BSA methods has not been clearly established yet, creating a knowledge gap on the application of BIM for sustainability assessment purposes. Thus, this paper analyses the current role of BIM to evaluate three BSA methods—LEED, BREEAM and SBTool. The current BIM applicability is assessed by performing a systematic review, where the criteria being assessed and the applied BIM software are identified. A comparison is made to determine which BSA method can currently take more advantage from BIM and to identify the number of assessed criteria from each one. Furthermore, the attractiveness of a BIM-based assessment for SBTool is analysed, facing the actual BIM scenario for LEED and BREEAM. Despite the restrictions, BIM use is increasing for sustainability purposes. Most of the analysed studies and identified software are still focused on the use of LEED for assessing sustainability during the design phase. However, BIM software capabilities can also support the assessment of the other BSA methods so that process replicability can happen. Among the most addressed criteria, the energy and material-related categories are the most eminent. Autodesk Revit is the most-used software. A BIM-based assessment for SBTool will have enough attractiveness. It can assess, at least, the same percentage of criteria as the other schemes, creating new opportunities to enhance building sustainability.


2019 ◽  
Vol 136 ◽  
pp. 01038
Author(s):  
Cheng Liu ◽  
Qinghan Bu ◽  
Shutao Lin ◽  
Faxiong Li

Building Information Modelling (BIM) technology has become a central topic in infrastructure construction industry recently in China. This paper describes the applications of BIM technology, including 3D digital design, intelligent manufacturing, smart site and BIM-based collaborative management platform, in a mega infrastructure project, the Shenzhong Link. Through BIM technology, Shenzhong Link strives to achieve the goal of “improving quality, increasing efficiency, reducing costs and achieve traceability”