The influence of a quay crane sea transportation on its further exploitation
Keyword(s):
The Real
◽
For the last decades, fully erected container cranes have been delivered to a customer site by ships. On one hand, using this method of transportation is very attractive due to its cost and time savings. However, on the other hand, being exposed to cycling loads from the ship motions during the sea voyage, the crane structure accumulates fatigue damage. Using the accumulated fatigue damage parameter, the crane transportation could be associated with the amount of the working cycles the crane could have worked out during its normal operating at the customer site. In the presenting paper the research for the real case of a new crane voyage from China to Ukraine has been done.
2015 ◽
Vol 60
(1)
◽
pp. 101-105
◽
2014 ◽
Vol 62
◽
pp. 34-41
◽
2016 ◽
Vol 10
(38)
◽
pp. 224-230
◽
Keyword(s):
2011 ◽
Vol 25
(5)
◽
pp. 1159-1165
◽
Keyword(s):
2008 ◽
Vol 496
(1-2)
◽
pp. 471-477
◽
Keyword(s):
1999 ◽
Vol 21
(8)
◽
pp. 849-856
◽
2007 ◽
Vol 29
(12)
◽
pp. 2200-2207
◽