Usace Experience In Performing Construction Risk Analyses For Wolf Creek Dam

Author(s):  
Dave Paul ◽  
Mike Zoccola ◽  
Vanessa Bateman ◽  
Josh Bomar
Keyword(s):  
2011 ◽  
Vol 415-417 ◽  
pp. 1431-1434
Author(s):  
Wei Wei Yu ◽  
Xuan Guo

Characterization of geotechnical digging and control the dynamical settlement is very necessary to mitigate construction risk. The metro tunnels of being constructed access to each other or near to the ground is high risk and physically difficult and costly. The control method becomes imperative. Some cases of digging prediction of ground movements and assessment of risk of damage to above or adjacent constructions have become an important issue especially in urban projec. Ground adaptability characterization is the key of control the tunneling in complex geotechnical conditions both in rock and soft stratum. High and changed water-soil pressure also is risk factors to effect tunneling process. Beside discussion of risk mitigation associate to tunnel construction, the developing settlement control and simulations are given to describe the methods of control risk.


2015 ◽  
Vol 13 (1) ◽  
pp. 165-194 ◽  
Author(s):  
Abdulaziz M. Jarkas ◽  
Theodore C. Haupt

Purpose – The purpose of this paper is to identify, explore, rank the relative importance and determine the prevalent allocation response trends of the major construction risk factors considered by general contractors operating in the State of Qatar. Design/methodology/approach – A structured questionnaire survey comprising 37 potential risk factors was distributed to a statistically representative sample of contractors. The influence ranks of the factors explored were determined using the “Relative Importance Index (RII)” technique, whereas the prevalent trend of contractors’ attitudes toward risk allocation of each factor investigated was quantified and expressed as a percentage, based on the number of respondents who selected a specific option, in relation to the total number of respondents. Findings – The results obtained indicate that risks related to the “client” group are perceived as most critical, followed by the “consultant”, “contractor” and “exogenous” group-related factors, respectively. The outcomes further show that the “transfer” option is the contractors’ prevalent response to “client” and “consultant”-related risks, while the “retention” decision is the principal pattern linked to “contractor” and “exogenous” group-related risk factors. Research limitations/implications – The dominant respondents’ perception that the crucial construction risks are related to clients and consultants suggests that these two parties have an essential role in controlling the negative ramifications of the associated factors. Practical implications – The findings suggest that increasing designers’ awareness of the significant effect of applying the constructability concept can considerably help reducing the risks concomitant of the construction operation. Policy makers may contribute, moreover, in alleviating the risk of incompetent technical staff and operatives’ employment by controlling the migration of inexperienced and unskilled construction workforce into the State. Originality/value – Given the knowledge gap for the major construction risk factors considered by general contractors in Qatar, the results reported in this study can provide clients, industry practitioners and policy makers with guidance to effectively manage the significant risks determined, which can further assist in achieving a reasonable level of competitiveness and cost-effective operation.


2022 ◽  
Vol 12 (2) ◽  
pp. 844
Author(s):  
Hubert Anysz ◽  
Jerzy Rosłon ◽  
Andrzej Foremny

There are several factors influencing the time of construction project execution. The properties of the planned structure, the details of an order, and macroeconomic factors affect the project completion time. Every construction project is unique, but the data collected from previously completed projects help to plan the new one. The association analysis is a suitable tool for uncovering the rules—showing the influence of some factors appearing simultaneously. The input data to the association analysis must be preprocessed—every feature influencing the duration of the project must be divided into ranges. The number of features and the number of ranges (for each feature) create a very complicated combinatorial problem. The authors applied a metaheuristic tabu search algorithm to find the acceptable thresholds in the association analysis, increasing the strength of the rules found. The increase in the strength of the rules can help clients to avoid unfavorable sets of features, which in the past—with high confidence—significantly delayed projects. The new 7-score method can be used in various industries. This article shows its application to reduce the risk of a road construction contract delay. Importantly, the method is not based on expert opinions, but on historical data.


2021 ◽  
Vol 634 (1) ◽  
pp. 012116
Author(s):  
Heng Kong ◽  
Fei Guo ◽  
Mi Zhang ◽  
Shenglei Gao ◽  
Kaili Wang

2020 ◽  
Vol 198 ◽  
pp. 02023
Author(s):  
Lixiang Cao

From the perspective of China’s construction enterprises, taking the nature of risk and engineering’s characteristics into account. The paper apply the Delphi Method to establish primeval list of international project construction risk, use Analytic Hierarchy Process to conduct a comprehensive evaluation to risk factors in the primeval list of international project construction risk, identify risk factors and put forward coping strategies, The ultimate goal is to provide reference and a basis for risk management of construction companies involved in international project construction.


2011 ◽  
Vol 4 (5) ◽  
pp. 388-391
Author(s):  
Sowmya Rao G.S Sowmya Rao G.S ◽  
◽  
Prof. V. SrinivasaRaghavan Prof. V. SrinivasaRaghavan

Sign in / Sign up

Export Citation Format

Share Document