Effect of Age of Pipes on Performance of Natural Gas Transmission Pipeline Network System

2011 ◽  
Vol 11 (9) ◽  
pp. 1612-1617 ◽  
Author(s):  
A.D. Woldeyohan ◽  
M.A.A. Majid
2018 ◽  
Vol 13 (3) ◽  
Author(s):  
Dr. Adarsh Kumar Arya ◽  
Dr. Shrihari Honwad

Abstract Transportation of natural gas from gathering station to consumption centers is done through complex gas pipeline network system. The huge cost involved in transporting natural gas has made pipeline optimization of increased interest in natural gas pipeline industries. In the present work a lesser known application of Ant Colony in pipeline optimization, has been implemented in a real gas pipeline network. The objective chosen is to minimize the fuel consumption in a gas pipeline network consisting of seven compressors. Pressures at forty-five nodes are chosen as the decision variables. Results of Ant Colony Optimization (ACO) have been compared with those of GAMS that utilizes ‘Generalized gradient principles’ for optimization. Our results utilizing ACO show significant improvement in fuel consumption reductions. Similar procedures can be adopted by researchers and pipeline managers to help pipeline operators in fixing up the pressures at different nodes so as the fuel consumption in compressors gets minimized.


2011 ◽  
Vol 361-363 ◽  
pp. 966-973
Author(s):  
Debebe Woldeyohannes Abraham ◽  
Mohd Amin bin Abd Majid

The increase in demand for natural gas in different sectors attracted different scholars in optimizing the operation and configurations of natural gas pipeline network (NGPN) systems. Even though there have been reports regarding the attempts of solutions for optimizing NGPN problems, the issues of NGPN regarding energy minimizations are not fully address yet. This paper proposed robust solution for NGPN system energy consumption minimization at compressor stations based on analogical approach. The analogies between NGPN system and inventory model were observed and applied in the analysis of steady state NGPN system. The proposed technique is based on the inventory model to find optimal operations for natural gas pipeline network system. The method for the determination of the optimal pressures was efficient and handled the non-linearity that occurs on both objective and the constraint equations. Results on a gunbarrel NGPN showed the proposed method assisted in determining the discharge and suction pressures to minimized energy consumption at compressor stations.


Author(s):  
David Cheng

Abstract Data from the DCS systems provides important information about the performance and transportation efficiency of a gas pipeline with compressor stations. The pipeline performance data provides correction factors for compressors as part of the operation optimization of natural gas transmission pipelines. This paper presents methods, procedure, and a real life example of model validation based performance analysis of gas pipeline. Statistic methods are demonstrated with real gas pipeline measurement data. The methods offer practical ways to validate the pipeline hydraulics model using the DCS data. The validated models are then used as performance analysis tools in evaluating the fundamental physical parameters and assessing the pipeline hydraulics conditions for potential issues influencing pressure drops in the pipeline such as corrosion (ID change), roughness changes, or BSW deposition.


Author(s):  
David Cheng

Abstract Data from the distributed control system (DCS) or supervisory control and data acquisition (SCADA) system provide useful information critical to the evaluation of the performance and transportation efficiency of a gas pipeline system with compressor stations. The pipeline performance data provide correction factors for compressors as part of the operation optimization of natural gas transmission pipelines. This paper presents methods, procedures, and an example of model validation-based performance analysis of a gas pipeline based on actual system operational data. An analysis approach based on statistical methods is demonstrated with actual DCS gas pipeline measurement data. These methods offer practical ways to validate the pipeline hydraulics model using the DCS data. The validated models are then used as performance analysis tools in assessing the pipeline hydraulics parameters that influence the pressure drop in the pipeline such as corrosion (inside diameter change), roughness changes, or basic sediment and water deposition.


Author(s):  
Guodong Zhang ◽  
Xuejun Bai ◽  
Douglas Stalheim ◽  
Shaopo Li ◽  
Wenhua Ding

Along with the increasing demand of oil and natural gas by various world economies, the operating pressure of the pipeline is also increasing. Large diameter heavy wall X80 pipeline steel is widely used in the long distance high pressure oil and gas transportation in China today. In addition, development of X90/X100 has begun in earnest to support the growing energy needs of China. With the wide use of X80 steels, the production technology of this grade has become technically mature in the industry. Shougang Group Qinhuangdao Shouqin Metal Materials Co., Ltd. (SQS) since 2008 has been steadily developing heavier thicknesses and wider plate widths over the years. This development has resulted in stable mass production of X80 pipeline steel plate in heavy wall thicknesses for larger pipe OD applications. The technical specifications of X80 heavy wall thickness and X90/X100 14.8–19.6 mm wall thicknesses, large OD (48″) requiring wide steel plates for the 3rd West-to-East Natural Gas Transmission Pipeline Project and the third line of Kazakhstan-China Main Gas Pipeline (The Middle Asia C Line) and the demonstration X90/X100 line (part of the 3rd West-East Project) in China required changes to the SQS plate mill process design. Considering the technology capability of steelmaking and the plate mill in SQS, a TMCP+OCP (Optimized Cooling Process) was developed to achieve stable X80 and X90/X100 mechanical properties in the steel plates while reducing alloy content. This paper will describe the chemistry, rolling process, microstructure and mechanical properties of X80 pipeline steel plates produced by SQS for 52,000 mT of for the 3rd West-to-East Natural Gas Transmission Pipeline Project and 5,000 mT for the Middle Asia C Line Project along with 1000 tons of 16.3 mm X90/X100 for the 3rd West-East demonstration pipeline. The importance of the slab reheating process and rolling schedule will be discussed in the paper. In addition, the per pass reductions logic used during recrystallized rough rolling, and special emphasis on the reduction of the final roughing pass prior to the intermediate holding (transfer bar) resulting in a fine uniform prior austenite microstructure will be discussed. The optimized cooling (two phase cooling) application after finish rolling guarantees the steady control of the final bainitic microstructure with optimum MA phase for both grades. The plates produced by this process achieved good surface quality, had excellent flatness and mechanical properties. The pipes were produced via the JCOE pipe production process and had favorable forming properties and good weldability. Plate mechanical properties successfully transferred into the required final pipe mechanical properties. The paper will show that the TMCP+OCP produced X80 heavy wall and 16.3 mm X90 wide plates completely meet the technical requirements of the three pipeline projects.


Author(s):  
Mildo Hasoloan Nainggolan ◽  
I Putu Suarsana ◽  
Suryo Prakoso

<p>The East Java Gas Pipeline (EJGP) pipeline network system is an open access for transporting almost ± 310 MMSCFD of Natural Gas from fields in East Java offshore to the onshore Power Plant consumers. The deviation between the calculated and mass balance of gas stock is called the Discrepancy in which BPHMIGAS set up a maximum value of ± 0.85%. The objective of the study is to develop a verification methodology to support hydrocarbon accounting in the EJGP Pipeline Network System. The methodology will be assisted by Flow Quantity Assurance software. After obtaining sufficient data, a new baseline can be taken empirically which can be used as a reference for the maximum allowable discrepancy in the EJGP Pipeline Network System. The data used in this simulation are taken from September - October 2013 such as pipes dimension of the entire network piping system, flowrate, pressure, temperature, and the composition of natural gas. The results of verification are compared with the calculations carried out by Pertamina Gas as operators. The calculation of Discrepancy from the Operators with different tools is around 0.12%, meaning that operator calculations are acceptable. The maximum <br />allowable discrepancy ± 0.85%, can be reviewed to be reduced according to the history of the average system discrepancy in 2017-2018 (around 0.54%). The New Shipper from Sirasun Batur Field is still more economics by using the existing pipeline network even though it bears Discrepancy / Losses up to 1% compared to building new pipes to consumers. It is found that the discrepancy is getting smaller (reducing the error) if there is a gas balance, meaning that the end consumers will take the gas according to the agreed nomination.</p>