scholarly journals Modeling and simulation of heat balance and internal heat recovery targets through a combination of stream specific minimum temperature difference and polynomial temperature coefficients of specific heat capacities using pinch analysis

AIMS Energy ◽  
2020 ◽  
Vol 8 (4) ◽  
pp. 652-668
Author(s):  
Fenwicks S. Musonye ◽  
◽  
Hiram Ndiritu ◽  
Robert Kinyua ◽  
2012 ◽  
Author(s):  
Sharifah Rafidah Wan Alwi ◽  
Muhammad Azan Tamar Jaya ◽  
Zainuddin Abdul Manan

Kilang penapisan minyak sawit lazimnya melibatkan proses penggunaan tenaga yang tinggi. Peningkatan kecekapan tenaga adalah amat penting bagi memastikan keuntungan tercapai. Kertas kerja ini menggunakan teknik analisis jepit bagi memaksimumkan penggunaan semula haba dan meningkatkan kecekapan sistem rangkaian haba sedia ada di kilang penghasilan minyak sawit, tertakluk kepada kekangan–kekangan proses. Langkah–langkah yang terlibat ialah penetapan sasaran guna semula haba maksimum diikuti dengan reka bentuk rangkaian haba yang ekonomik. Aplikasi teknik berkenaan kepada kilang penghasilan minyak sawit telah menghasilkan pengurangan penggunaan haba panas dan sejuk sebanyak 700 kW (21%), atau penjimatan kos utiliti sebanyak RM370,787, dengan pelaburan kapital sebanyak RM656,293 dan jangka pulangan balik selama 1.77 tahun. Kata kunci: Analisis jepit; minyak kelapa sawit; sedia ada; rangkaian pemindahan haba; kitar semula haba maksimum A palm oil refinery involves energy–intensive processes. Maximizing thermal efficiency of palm oil refinery is crucial for the plant profitability. This work implements a pinch analysis retrofit technique to maximize heat recovery and thermal efficiency of a palm oil refinery, subject to the existing process constraints. The procedures involve setting the maximum heat recovery targets and cost–effective retrofit of the heat exchanger network (HEN). Application of the technique on a palm oil refinery results in reduction of 700 kW (21%) heating and cooling loads or a saving of RM370,787, incurring a capital investment of about RM656,293 and a payback period of 1.77 years. Key words: Pinch analysis; palm oil; retrofit; heat exchanger network; maximum heat recovery


2013 ◽  
Vol 115 (3) ◽  
pp. 2071-2077 ◽  
Author(s):  
S. Wang ◽  
X. M. Jiang ◽  
Q. Wang ◽  
H. S. Ji ◽  
L. F. Wu ◽  
...  

1994 ◽  
Vol 35 (5) ◽  
pp. 715-732 ◽  
Author(s):  
Igor I. Taubkin ◽  
Michael A. Trishenkov ◽  
Nikolai V. Vasilchenko

Processes ◽  
2021 ◽  
Vol 9 (11) ◽  
pp. 1981
Author(s):  
Florian Kretschmer ◽  
Bernd Hrdy ◽  
Georg Neugebauer ◽  
Gernot Stoeglehner

To counteract climate change, the application of renewable energy sources and their efficient use are of crucial importance. In this context, wastewater has also gained increased attention in recent years. For decades, wastewater treatment plants have applied the heat from digester gas combustion to supply internal demands. However, in the context of efficient energy use the question arises: can using high temperature heat for supplying low temperature demand still be considered the best option? This article presents an innovative approach to covering wastewater treatment plant (WWTP) internal demand with low temperature wastewater heat recovery, making thermal energy from digester gas combustion available for feed-in to a local high temperature district heating network. The presented feasibility study was carried out in an Austrian municipality and investigates the heat balance, the economic risk, climatic benefits and the social aspects of the suggested approach. The practical implementation of the novel approach was planned in two steps. First, the WWTP should be connected to the district heating network to enable the feed-in of excess heat. Second, the WWTP internal heat supply should be modified and based on wastewater heat recovery from the effluent. Due to the promising results of the feasibility study, the first step was realized in summer 2020. The second and final step was initiated in 2021.


Sign in / Sign up

Export Citation Format

Share Document