Selection of the Optimal Technology of Re-Fracturing on Horizontal Wells with Multi-Stage Fracturing at the Field M

Author(s):  
M.V. Firsin ◽  
E.A. Demidova
2014 ◽  
Author(s):  
F.. Martocchia ◽  
S.. Baretti ◽  
L.. Farina ◽  
G.. Rizza ◽  
F.. Okassa ◽  
...  

Abstract When production facilities are not equipped with a solid control device, proppant flowback becomes an issue throughout the entire productive life of a screenless multi fractured well. The challenge of minimizing proppant flowback is even more critical when dealing with offshore horizontal wells with ESP systems installed. A wide selection of proppant flowback prevention additives is now available in the industry: most of them work either chemically or mechanically. At low formation temperature (150 F), the effectiveness of some additives such as resin coated proppant or fiber can be limited due to the temperature activation. This paper will describe a successful strategy of proppant flowback control which was implemented in a multi stage fracturing treatment on a horizontal well in M- field, offshore Congo. It is the combination of resin coated proppant, enhanced by a chemical activator and inert fibers that provides double mechanism to eliminate proppant flowback issues during well production and sustaining life of ESP. Success in this multi stage fracturing treatment has resulted in oil production from a pay zone that has never been produced due to poor petrophysical characteristics. This document will describe: proppant flowback control additives selection process, placement strategy, hydraulic fracturing design and well execution considerations for multi stage fracturing treatments.


Author(s):  
Cornelius Nellessen ◽  
Thomas Klein ◽  
Hans-Jürgen Rapp ◽  
Frank Rögener

The production of pharmaceutical ingredients, intermediates and final products strongly depends on the utilization of water. Water is also required for the purification and preparation of reagents. Each specific application determines the respective water quality. In the European Union, the European Pharmacopeia (Ph. Eur.) contains the official standards that assure quality control of pharmaceutical products during their life cycle. According to this, the production of water for pharmaceutical use is mainly based on multi-stage distillation and membrane processes, especially, reverse osmosis. Membrane distillation (MD) could be an alternative process to these classical methods. It offers advantages in terms of energy demand and a compact apparatus design. In the following study, the preparation of pharmaceutical-grade water from tap water in a one-step process using MD is presented. Special emphasis is placed on the performance of two different module designs and on the selection of optimum process parameters.


2000 ◽  
Author(s):  
Neville K. S. Lee ◽  
Grace H. Yu ◽  
Y. Zou ◽  
J. Y. Chen ◽  
Ajay Joneja

Abstract Mechanical means of positioning are frequently used in mechanical assembly processes. However, very little attention has been paid to the selection of mechanical alignment systems (MAS) for assembly processes. Our analysis shows that if the MAS are not properly selected, the form errors as well surface waviness and roughness of the workpieces to be assembled can badly limit the level of accuracy achievable. A simulation-based methodology is described to study the alignment accuracy for multi-stage processes. Such cases are common, where fabrication operations are done on parts before they are assembled. The study shows that if the workpieces are aligned in the same orientation, using similar or identical MAS for the fabrication processes and assembly processes, then the effect of the form errors as well as surface waviness and roughness of the workpieces can be greatly suppressed.


2021 ◽  
Author(s):  
Aleksander Valerievich Miroshnichenko ◽  
Valery Alekseevich Korotovskikh ◽  
Timur Ravilevich Musabirov ◽  
Aleksei Eduardovich Fedorov ◽  
Khakim Khalilovich Suleimanov

Abstract The deterioration of the reservoir properties of potential oil and gas bearing areas on mature and green fields, as well as the increase in the volume of hard-to-recover reserves on low-permeable reservoirs set us new challenges in searching and using effective development technologies to maintain and even increase the oil production levels. Based on successful international experience, Russian oil and gas companies use horizontal wells (HW) with multi-stage hydraulic fracturing (MSHF) for the cost-effective development of low-permeable reservoirs. Thus, since the first pilot works of drilling technologies and completion of HW with MSHF in 2011, at the beginning of 2020, over 1,200 HW with MSHF were drilled and came on stream at the fields of LLC RN-Yuganskneftegaz, about half of which are at the exploitation play AS10-12 of the northern license territory (NLT) of the Priobskoye field. In searching the best technologies and engineering solutions, the company tested different lengths of horizontal section of HW, the number of hydraulic fracturing (HF) stages and distances between hydraulic fracturing ports, as well as different specific mass of the proppant per frac port. Recently, there has been a tendency in design solutions to increase the length of the HWs and the number of hydraulic fractures with a decreasing distance between the frac ports and a decreasing specific mass of the proppant per frac port. This work studies the actual and theoretical efficiency of HW with MSHF of various designs (different lengths of horizontal section of HW and the number of HF stages) and to assess the viability of increasing the technological complexity, as well as to analyze the actual impact of loading the proppant mass per port on performing HW with MSHF. The study is based on the results of the analysis of the factual experience accumulated over the entire history of the development of the exploitation play AS10-12 of the NLT of the Priobskoye field of the Rosneft Company. In studying the viability of increasing the technological complexity, especially, increasing the length of horizontal section of HW, increasing the number of HF stages, and reducing the distance between the frac ports: we discovered the typical methodological errors made in analyzing the efficiency of wells of various designs; we developed the methodology for analysis of the actual multiplicity of indicators of wells of various designs, in particular, HW with MSHF relative to deviated wells (DW) with HF; we carried out the statistical analysis of the actual values of the multiplicity of performance indicators and completion parameters of HW with MSHF of various designs relative to the surrounding DW with HF of the exploitation play AS10-12 of the NLT of the Priobskoye field; we performed the theoretical calculation of the multiplicity of the productivity coefficient for the HW with MSHF of various designs relative to DW with HF for the standard development system of the exploitation play AS10-12 of the NLT of the Priobskoye field; we compared the actual and theoretical results. The paper also presents the results of studying the actual effect of changes of proppant's mass per port on performance indicators of HW with MSHF of the same design and with an increase in the number of fractures of the hydraulic fracturing without changing the length of horizontal section of HW. As for performance indicators, being the basis for estimating the efficiency of HW with MSHF of various designs, we used the productivity index per meter of the effective reservoir thickness and the cumulative fluid production per meter of the effective reservoir thickness per a certain period of operation. And as the completion parameters, we used the length of the horizontal section of HW, the number of HF stages, the distance between the frac ports, and the specific mass of the proppant per meter of the effective reservoir thickness per frac port. The results of this work are the determining vector of development for future design decisions in improving the efficiency of HW with MSHF.


Author(s):  
V.Yu. Nikulin ◽  
◽  
T.E. Nigmatullin ◽  
A.G. Mikhailov ◽  
R.R. Mukminov ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document