Study on Weak-Disturbance Construction Technology of Casing Bored Pile

2012 ◽  
Vol 170-173 ◽  
pp. 3169-3174 ◽  
Author(s):  
Deng Ke Liu ◽  
Yao Dong Huang ◽  
Quan Mei Gong

Aiming at reducing the influence caused by the pile foundation construction on the existing structures nearby, this paper introduces a new technology of spinning casing bored pile, which is the optimization and combination of different construction technologies. Through the corresponding calculation and analysis, the influence scope and extent of this technology is obtained in this paper. This technology has been successfully applied in the pile foundation engineering of a passenger dedicated line close to subway shield tunnels, it can provide the similar project that needs to consider the influence on the surroundings with reference, and it is worth wide promotion and application.

2014 ◽  
Vol 1065-1069 ◽  
pp. 687-690
Author(s):  
Mei Yan He

Currently, bored pile been widely applied in the current road and bridge construction, But its construction technology in complex geological case is still not perfect. In view of this, this paper carried out a high-speed Lakes viaduct extraordinary pile foundation construction project. For the analysis of the technical difficulties in the construction process, explore get the corresponding key construction technology, and it relates to the accident and its approach are summarized, study drew long pile construction technology Lakes geological conditions under soft silt and clay, solve the long holes bored pile into the lake silt soft clay under geological conditions, verticality control and other technical problems, can provide reference for similar projects.


2012 ◽  
Vol 446-449 ◽  
pp. 2449-2452
Author(s):  
Dong Guo Li ◽  
Gui Mei Shi

A viaduct of the Qinglai expressway fourth contract was artificial excavated piles. The construction technical work was regarded as an example. The technical comparison were done between the artificial excavated pile and the bored pile on the pile foundation bearing capacity and the retaining wall effect . The artificial excavated pile replacing the bored pile was feasible, and the construction technology and the key problems of the artificial excavated piles were confirmed. The references were provided to the similar projects.


2021 ◽  
Vol 5 (6) ◽  
pp. 38-41
Author(s):  
Hua Guo

In the field of construction engineering, foundation engineering plays a critical role. In actual construction, we must first effectively regulate the foundation construction to ensure the safety and stability of the entire building in order to improve the overall quality of the project. It's also important to look into the technologies that go into building foundations. The construction technology and reinforcing technology of building foundations are examined in this study as a reference.


2014 ◽  
Vol 580-583 ◽  
pp. 1301-1305
Author(s):  
Yang Wu

<span><span lang="EN-US">Pile Foundation Construction jobs are usually wet process has contaminated a large, long duration, the pile of inconsistent quality, cost out. And long bored piles to adapt to a variety of complex geological conditions, but not the impact of water table, is widely used in various projects of the foundation engineering, this according to subway construction in Kunming, the application of experience, a brief description length screw pile construction anti-interpolation technology.</span>


2012 ◽  
Vol 204-208 ◽  
pp. 308-311 ◽  
Author(s):  
Rui Li ◽  
Yi Qiao ◽  
Yong Jie Liu

As the population growth and land resources declining, high-rise building project is increasingly common in the construction work. Through in-depth thinking and active exploration, specific attention to matters of deep foundation pit and pile foundation construction technique, which is the key construction techniques in the high-rise building project, was summarized in this article. It suggests to make a careful and detailed geological survey, and then choose the right design program and develop a reliable construction plans. This scheme was proved to be a useful reference and guidance for the development of high-rise building construction technology.


2012 ◽  
Vol 446-449 ◽  
pp. 1514-1519
Author(s):  
Bin Tang ◽  
Ting Wang ◽  
Zi Ning Shan

Abstract: Cast-in situ bored pile is a common form of pile foundation and widely used in road and bridge engineering in China. Because of complex cast-in situ bored pile construction process, high technical content requirement, vulnerable to the impact of human and environmental factors, cast-in situ bored piles prone to various kinds of quality problems in the construction process, such as drilling deflection, drilling hole collapse and diameter reduction, wrong identification of pile-end’s bearing stratum, catheter tube blockage, reinforcement cage floating, pile breaking, pile silted, etc. These problems often make it difficult to meet the design requirements into a pile formation, and difficultly to remedy. In this paper, Zhoutian Zhenjiang bridge at Shaoguan City, Qujiang to Nanxiong highway A03 contract bid package cast-in situ bored pile foundation engineering encountered in the construction collapsed hole, inclined hole, catheter tube blockage and other issues for example to analyzes the cause of cast-in situ bored pile engineering accident, made appropriate preventive measures and processing method.


2014 ◽  
Vol 580-583 ◽  
pp. 52-55
Author(s):  
Cheng Bo Zheng ◽  
Jie Xu

With the example of pile foundation engineering in the limestone karst fissure reinforcement, discusses the principle of reinforcement of pile foundation in karst area, introduces some construction technology of pile foundation reinforcement, the reinforcement design principles and the reinforcement scheme is briefly discussed, and combined with the engineering practice and put forward a set of safety, economy and reasonable treatment plan, to reinforcement technology promote the karst pile foundation bottom cave, fracture.


2014 ◽  
Vol 711 ◽  
pp. 392-396
Author(s):  
Fa Ben Chen

Impact drill holes into the pile construction technology is widely used in pile foundation construction job, construction vibrating pile thus to bring the impact of the increasingly prominent on the surrounding environment, the impact of this article on the construction site of a pile of drilled hole pile construction vibration effects on the surrounding environment experiment monitored by the monitoring data analysis found that the peak acceleration increases with distance attenuation occurs quickly, on the basis of analysis of pile foundation construction vibration velocity, frequency, and duration of the impact on the surrounding buildings, it is found that the frequency of vibration velocity with less impact on the housing, the duration of the construction will have an impact. Finally, analysis of the impact acceleration caused by the building structure from the perspective of seismic intensity, vibration intensity was found equivalent vi degree seismic intensity of little effect on the surrounding structures. Furthermore, the greatest impact of vibration on the residential buildings, by the way of excavating vibration attenuation ditch to control effect of vibration is proposed.