Auger Bored Piles Application Works in the Subway
2014 ◽
Vol 580-583
◽
pp. 1301-1305
Keyword(s):
<span><span lang="EN-US">Pile Foundation Construction jobs are usually wet process has contaminated a large, long duration, the pile of inconsistent quality, cost out. And long bored piles to adapt to a variety of complex geological conditions, but not the impact of water table, is widely used in various projects of the foundation engineering, this according to subway construction in Kunming, the application of experience, a brief description length screw pile construction anti-interpolation technology.</span>
2014 ◽
Vol 1065-1069
◽
pp. 687-690
2012 ◽
Vol 446-449
◽
pp. 1514-1519
Keyword(s):
2011 ◽
Vol 368-373
◽
pp. 3032-3035
Keyword(s):
2012 ◽
Vol 170-173
◽
pp. 3169-3174
◽
2014 ◽
Vol 711
◽
pp. 392-396
2011 ◽
Vol 368-373
◽
pp. 2839-2842
◽
Keyword(s):
2021 ◽
Vol 1134
(1)
◽
pp. 012003
2021 ◽
Vol 634
(1)
◽
pp. 012109