The design and construction characteristics of cast-in-situ concrete hollow floor are introduced and the difficulties of the construction system are discussed in this paper. Based on the analysis of the engineering, the construction technology is introduced and its application is evaluated.

2011 ◽  
Vol 480-481 ◽  
pp. 1266-1270
Author(s):  
Liu Hui

During the pipe jacking construction, the bearing plates of jack need the support of great reactive force which is provided by the side-wall of the working shaft and the soil mass behind the wall. In the shallow pipe-jacking working shaft, the soil mass only can provide limited reactive force due to the small height of the soil mass behind the side-wall, which becomes the difficult point in the design and construction of the shallow pipe-jacking working shaft. This thesis takes the actual projects for the examples to introduce the construction technology of shallow pipe-jacking working shaft in details, including the construction key points like pre-grouting injection consolidation, ring beam construction method as well as reverse construction method.


2020 ◽  
Vol 2020 ◽  
pp. 1-20 ◽  
Author(s):  
Tong Liu ◽  
Yujian Zhong ◽  
Zhihua Feng ◽  
Wei Xu ◽  
Feiting Song ◽  
...  

As a typical granular bulk medium, problems are common in boulder-cobble mixed grounds, such as easy collapse and instability and difficult effective support for large-section tunnel excavation. Tunnels constructed in BCM grounds are rare still, and there is a big gap between the design and construction of tunnels. Based on the Nianggaicun highway tunnel crossing the BCM grounds, the construction technology of tunnel in BCM grounds is studied by means of literature investigation and field survey. Here are the main conclusions: the overall deformation of surrounding rock is quite small; the pressure distribution of surrounding rock is small and loose pressure is dominant, and the safety reserve of secondary lining is large. The deformation process of surrounding rock concentrates on the construction stage. During the construction process, there are many problems, such as serious overexcavation, difficulty of bolt penetration, and continuous rock fall. In this paper, a three-bench complementary cyclic excavation method is proposed, which replaces the original CD and CRD methods. Meanwhile, the supporting system is optimized. The results show that the disturbance of surrounding rock is reduced, while the safety of construction process and the reliability of structure are increased. The new excavation method and optimized supporting system are expected to fill the gap between design and construction of tunnel in BCM grounds and provide reference for construction of such tunnels in the future.


2011 ◽  
Vol 261-263 ◽  
pp. 1690-1693
Author(s):  
Feng Yi Tan ◽  
Rong Hua Zou ◽  
Han Bing Hu ◽  
Zu Kai Lin

The swelling rock slope reinforced by geogrid with wrapped face was one of reinforced methods in the swelling rock test region of main canal in South-to-North Water Division Project, the key step was the geogrid with wrapped face in layer by layer, which was not only the core step to make sure the reinforced swelling rock slope with geogrid as a integrality, but also the most complex, time consuming and cost in the whole process. From the in situ test, the construction technology and related construction parameters of geogrid of simplified face to reinforce the swelling rock slope was obtained, in which the construction of geogrid with wrapped face was optimized, the construction progress was improved and its cost was reduced, which contributed to the generalization and application of geogrid with simplified wrapped face to reinforce swelling rock slope in the middle-route of South-to-North Water Division Project, meanwhile, it was provided as a references for similar engineering.