Design of Time-Domain Airborne Electromagnetic Full Bridge Boost Switching Power Supply
2013 ◽
Vol 433-435
◽
pp. 1237-1240
Keyword(s):
According to the specific requirements of time domain airborne electromagnetic method detection system, a whole bridge high-power switching power supply is designed based on limited double pole control. Combined with the designed whole bridge topologies, its working process is discussed and the realization process of soft switch is analyzed. Through the specific experimental analysis, it can verify that the limited double pole control method can well realize zero voltage switch and zero current switch of the switch tubes, it can improve the work efficiency of the switching power supply. The power supply has been successfully applied to the scientific research project at present.
Keyword(s):
2014 ◽
Vol 7
(10)
◽
pp. 2572-2581
◽
Keyword(s):
Keyword(s):
2012 ◽
Vol 132
(1)
◽
pp. 13-16
Keyword(s):
2013 ◽
Vol 347-350
◽
pp. 1358-1362
Keyword(s):