Analysis on Surrounding Rock Deformation of Shallowly-Buried Portal Part of Double-Line Tunnel

2011 ◽  
Vol 250-253 ◽  
pp. 1418-1421
Author(s):  
Le Min Ma ◽  
Lei Wang ◽  
Long Xian Xu

Through studying the ground surface settlement monitoring for Fang Dou Shan highway tunnel Shallowly-buried Portal Part, this paper mainly discusses the deformation of surrounding rock range from ground surface to the arch crown of double-line tunnel, and analyses the effect on stability of surrounding rock during construction, with the whole process of excavation of highway tunnel being simulated by FLAC_3D. It can make great significance for construction safety and some other related parts.

2012 ◽  
Vol 170-173 ◽  
pp. 502-505
Author(s):  
Li Guo ◽  
Bing Xie

The cut-and-fill mining is the main content of the technical system of green coal mining. And it is an effective way for solving the environmental problems and mining the coal under buildings, under railway, under water and over confined aquifer. No matter what kind of filling way, the gob stowing cannot achieve ideal filling effect, the filling effect is random in certain scope. Taking a coal mine as an example, with the aid of stochastic finite element method, the three situations of gob stowing were calculated and analyzed to explore the statistical rule of the ground surface settlement and the stability of surrounding rock because of random variation of gob stowing effect.


2012 ◽  
Vol 594-597 ◽  
pp. 1201-1205
Author(s):  
Dong Qiang Xu ◽  
Jia Liu ◽  
Yue Sun

Use FLAC 3D finite difference software for numerical simulation and static calculation of the different models. Study the deformation and forces condition of different model during the process of excavation. The results show that setting invert of highway tunnel in Ⅳ1-grade rock section can improve the stress state of the supporting structure and reduce the surrounding rock deformation effectively. At the same time, the flat bottom tunnel applying C25 concrete and grouting bolts could improve the integrity of surrounding rock below the tunnel sidewall. It is can be considered to cancel the setting of invert to achieve the purpose of simplifying the construction and design.


2020 ◽  
Vol 2020 ◽  
pp. 1-13
Author(s):  
Zhi Lin ◽  
Xiang Chen ◽  
Hongyun Yang ◽  
Chongguo Cheng ◽  
Huasong Wang ◽  
...  

The construction of urban underground cross-interchange transfer subway stations often encounters the difficulties of shallow-buried, different surrounding rock, large spans and heights, congested road traffic, and surrounding buildings sensitive to the construction sequence. Therefore, there is a need for an underground project that controls the stability of underground space and ground subsidence. Based on the construction difficulties of a certain station (the maximum excavation area over 760 m2), this paper conducts a comprehensive selection design of the structure, construction mechanics response, and control technology of this type of interchange station structure and construction excavation. First of all, based on the design experience of large-scale underground transfer transportation engineering and taking full consideration of the stratum conditions, an “arch-wall” cross transfer structure method is proposed. The refined numerical analysis shows that the structure can fully utilize the stratum conditions to reduce the ground surface settlement. Then, in view of the stability of surrounding rock during the construction of a large section, based on the traditional large section excavation method, a construction method of “cross rock beam + heading method” was proposed. In order to verify the effect of the construction method, the three-dimensional detailed numerical model was used to simulate the construction conditions, and the mechanical response characteristics and displacement changes of surrounding rock under each excavation step are explored. Simultaneous interpreting with the traditional large section excavation method, the results show that the new method has advantages in controlling the stability of the surrounding rock. Meanwhile, in order to ensure the safe construction of the project, the self-developed multifunctional engineering test system for traffic tunnels is used to carry out a large-scale physical model experiment to simulate the entire process of the “arch-wall” cross transfer structure construction response characteristics. By analyzing the data of measuring points, the results show that the structure form and the excavation method cause the ground surface settlement, stress, and structural forces meet the requirements for safe construction. Finally, the station can be safely constructed under the new structure form and construction method. Therefore, the structure form and method proposed in this paper can be adapted to the large-scale underground structure under construction in complex environments.


2013 ◽  
Vol 838-841 ◽  
pp. 1352-1358 ◽  
Author(s):  
Zhi Hao Yang ◽  
Ge Cui ◽  
Ya Peng Fu ◽  
Yong Fang ◽  
Bin Yang

Tianpingzhai Tunnel on Dazhou-Wanzhou Expressway passes through the mined-out area, the spatial position of the goaf changes constantly comparing to the tunnel during excavation, and broken rock mass of the caving zone is most likely to collapse, which affects construction safety in return. Two dimensional computation models were built by using finite differential software FLAC to simulate excavation process when the coal-mined area is right above or below the tunnel. In 2D models, goaf strata were regarded as horizontal, and buried depth and coal thickness were limited to 300 meters and 0.5 meter respectively. The displacement around the tunnel, forces of primary lining, axial force of bolts and plastic zone of surrounding rock have been analyzed under these circumstances that the distances between tunnel and goaf are 1m, 6m and 12m. According to the results, when the distance between goaf and tunnel is less than 12 meters,underlying goaf has greater impact on the displacement around the tunnel and average axial force of bolts than overlying goaf, as well as the size of plastic zone of surrounding rock. Its strongly suggested to avoid underlying goaf if the tunnel have to pass through the mined-out area.


2019 ◽  
Vol 136 ◽  
pp. 04018
Author(s):  
Lianghan Zhang ◽  
Xiaolong Li ◽  
Xinyun Ma ◽  
Hongyan Guo ◽  
Ke Li

According to the problem of deformation of surrounding rock when the double-wall method is adopted in the tunnel, the five tunnel monitoring points are set in the tunnel vault, arch waist and arch foot to simulate the tunnel excavation process. The surrounding rock is deformed, and the excavation of the middle guide hole makes the deformation of the surrounding rock reach 7.2mm. After the removal of the middle partition wall, the deformation reaches the maximum, which is 8.4mm. The horizontal displacement starts to increase rapidly, and the maximum is 5.3mm. According to the analysis results, the surrounding rock above the tunnel should be reinforced in time, and the deformation of the surrounding rock after the removal of the middle partition wall should be paid attention to ensure the construction safety and provide reference for future construction.


2014 ◽  
Vol 580-583 ◽  
pp. 1127-1133
Author(s):  
Long Jin Tan ◽  
Hong Qing Zhou ◽  
Kai Sheng Chen

Tunnel monthitoring reference value is an important indicator to determine the stability of surrounding rock. Existing tunnel specification vault settlement and surrounding convergence gives some guidance views, But in the actual project also found a number of problems, And no indication of surface displacement control reference value specification in. Based on the analysis of relevant norms, In practical engineering, for example, Monthitoring and Measurement standards for construction tunnel some meaningful discussion.


2012 ◽  
Vol 204-208 ◽  
pp. 1514-1517
Author(s):  
Zhi Jie Sun

The 3D finite element simulation are adopted to study the surrounding rock deformation regularity of main tunnel during the horizontal adit construction stage.The Zhongtiaoshan highway tunnel is taken as an example. The research results are shown as follows:Horizontal adit excavation destroys the original arching effect of the main tunnel, which leads to stress concentration at the intersection of primary supporting structure. The first excavation step plays an important play in the surrounding rock deformation of the intersection. The influence range of the main tunnel which due to the horizontal adit excavation is 1.2D.


2021 ◽  
Vol 2021 ◽  
pp. 1-17
Author(s):  
Yanling Jia ◽  
Aohui Ouyang ◽  
Siyu Wang ◽  
Xing Liang ◽  
Bin Wang ◽  
...  

In this study, we developed a tunnel excavation model test system to investigate the deformation and mechanical response of the surrounding rocks and tunnel structure during the reconstruction and expansion of an existing shallow single-hole tunnel into a twin-arch tunnel. A model test was conducted to study the variation in the ground surface settlement characteristics, surrounding rock pressure, and internal stresses of the supporting structure and midwall during the construction process. The influence of the excavation distance on displacements and structural stress between the faces of the left and right tunnels was analysed using numerical software. A comparison between the model test results and the monitoring and measurement construction results revealed a fairly consistent ground surface settlement, indicating that the system is stable and reliable and can be widely applied to laboratory model test research on tunnel excavation. Results show that the excavation of the first tunnel had a significant effect on the stability of the surrounding rock within the distance of a single-tunnel span behind the tunnel face. When the excavation distance between the two tunnels exceeded twice the length of the single-tunnel span, its effect on the stresses and deformation of the reconstructed twin-arch tunnel was negligible.


Sign in / Sign up

Export Citation Format

Share Document