Analysis and Application of BIM Technology in the Project Goal Control

2013 ◽  
Vol 671-674 ◽  
pp. 2978-2981 ◽  
Author(s):  
Ding Tang Wang

BIM is a method which is based on the integration of digitalization technology and visualization technology to manage information related project construction. This paper states the build process of imitating reality by using BIM’s visualization technology with multi-dimension and large data, and unique features for finding the potential problems and risks under virtual construction environment by BIM’s technology, so as to find problems in advance and evaluate them preliminarily, put forward corresponding countermeasures and prevent measures, work out optimized scheme to guide the real construction, and control effectively the project’s quality, progress and cost. BIM solves fundamentally the management defects from traditional project, and will certainly bring about a series of great changes in the circles of project management.

2018 ◽  
Vol 51 (15) ◽  
pp. 1062-1067 ◽  
Author(s):  
Mojtaba Sharifzadeh ◽  
Mario Pisaturo ◽  
Arash Farnam ◽  
Adolfo Senatore

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sanderson César Macêdo Barbalho ◽  
Gladston Luiz Silva

PurposeThis paper aims to explore how new product development (NPD)-based project management offices (PMOs) work, their drivers to deliver performance and their project success impact.Design/methodology/approachThe study used a survey of 35 Brazilian and multi-national companies that identified the effort to perform a list of PMO functions, some PMO drivers in the company and five project performance perception indicators. The authors apply a specific set of statistics to uncover the relations between these dimensions of interest.FindingsThe factorial analysis allows us to find the main functions influencing each other. The project teams’ perception of project management (PM) performance is suggested as a success factor that drives PMOs when working on portfolio management issues, managing project files and promoting PM over the company.Practical implicationsThis paper contributes to a contingency approach for designing a project machine involving PMOs to support NPD projects. Managers can set the most suitable PMO functions avoiding mimicry when structuring their NPD efforts.Originality/valuePMOs have impacted team satisfaction and control of project data but not indicators related to triple constraints.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tarek Salama ◽  
Ahmad Salah ◽  
Osama Moselhi

Purpose The purpose of this paper is to present a new method for project tracking and control of integrated offsite and onsite activities in modular construction considering practical characteristics associated with this type of construction. Design/methodology/approach The design embraces building information modelling and integrates last planner system (LPS), linear scheduling method (LSM) and critical chain project management (CCPM) to develop tracking and control procedures for modular construction projects. The developed method accounts for constraints of resources continuity and uncertainties associated with activity duration. Features of proposed method are illustrated in a case example for tracking and control of modular projects. Findings Comparison between developed schedule and Monte Carlo simulation showed that baseline duration generated from simulation exceeds that produced by developed method by 12% and 10% for schedules with 50% and 90% confidence level, respectively. These percentages decrease based on interventions of members of project team in the LPS sessions. The case example results indicate that project is delayed 5% and experienced cost overrun of 2.5%. Originality/value Developed method integrated LPS, LSM and CCPM while using metrics for reliability assessment of linear schedules, namely, critical percent plan complete (PPCcr) and buffer index (BI). PPCcr and BI measure percentage of plan completion for critical activities and buffer consumption, respectively. The developed method provides a systematic procedure for forecasting look-ahead schedules using forecasting correction factor Δt and a newly developed tracking and control procedure that uses PPCcr and BI. Quantitative cost analysis is also provided to forecast and monitor project costs to prove the robustness of proposed framework.


2015 ◽  
Vol 719-720 ◽  
pp. 181-186
Author(s):  
Ya Ting Li

As the external environment of the international construction project has become increasingly complex, risk management is emphasized in the project management. BIM(Building Information Model) has bring change to the Construction Industry in China. It has contributed to the schedule and cost management. However, BIM is not widely used to solve the problem of risk management. This thesis cites the possibility about BIM application to risk management and evaluates the progress it may bring to the process of risk management. Furthermore, a BIM-Risk System is proposed for Chinese international contractors to solve some major risks the international contractors may face. By using this system, the level of the project risk management will significantly improve. Then the barriers and the potential problems of applying BIM to risk management in China are analyzed. The BIM application to risk management has great value to be further researched.


2018 ◽  
Vol 13 (1) ◽  
pp. 35-45
Author(s):  
Cut Zukhrina Oktaviani

This paper aims to reviewed construction projects complexity in construction complex procurement. Construction complexity is influenced with many internal and external factors. Complexity covers entire construction project cycles. At construction work procurement stage, organization and processes complexity is a major concern, especially in government procurement. Complexity requires regulation and control are such that it does not happen obstacles at every project construction cycle stage. 


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Eryk Głodziński

Purpose The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a literature review with solutions recommended for utilization by managers from general contractors operating in Poland. There are few studies related to the mentioned topic, much fewer describing the geographical area of Eastern Europe. Design/methodology/approach Triangulation of research methods was selected. First literature review, next desk research and finally descriptive statistical analysis and interview were conducted. The research methods were applied in three steps whose beginnings overlapped and the mid-term findings from one study complemented others. Findings PMe should be focused on management and governance issues. Its evaluation is related to various organizational levels (permanent organization, portfolio, program, project, construction site and supply chain), most of them are under valuated by practitioners. The conducted study pointed out that there are numerous supporting tools and measures applicable in organizational project management (OPM). The managers recommend combining various tools in one comprehensive OPM system, to limit multiple manual incorporations of the same data to the various databases. The managers call to increase the practical usefulness of researchers’ proposals, to educate the construction managers in the application of complex performance systems and to promote portfolio thinking. Originality/value The comparison of performance measurement solutions proposed by academia with experience collected from Polish construction managers could support the better application of theoretical ideas in practice.


2020 ◽  
Author(s):  
Timothy F. Brady ◽  
Viola S. Störmer ◽  
Anna Shafer-Skelton ◽  
Jamal Rodgers Williams ◽  
Angus F. Chapman ◽  
...  

Both visual attention and visual working memory tend to be studied with very simple stimuli and low-level paradigms, designed to allow us to understand the representations and processes in detail, or with fully realistic stimuli that make such precise understanding difficult but are more representative of the real world. In this chapter we argue for an intermediate approach in which visual attention and visual working memory are studied by scaling up from the simplest settings to more complex settings that capture some aspects of the complexity of the real-world, while still remaining in the realm of well-controlled stimuli and well-understood tasks. We believe this approach, which we have been taking in our labs, will allow a more generalizable set of knowledge about visual attention and visual working memory while maintaining the rigor and control that is typical of vision science and psychophysics studies.


Author(s):  
Markus Ilg ◽  
Alexander Baumeister

Performance measurement in software engineering has to meet a multiplicity of challenges. Oftentimes, traditional metrics focus on sequential development instead of using incremental and iterative development. Output is measured on a pure quantitative (e.g., SLOC), quality-disregarding basis. A project’s input is hard to assign properly using enterprise-unspecific forecasting tools which have to be calibrated at first and which do not account for time preferences. Requirements necessary for behaviourally adjusted project management and control are rarely discussed. Focusing on these shortcomings, this paper proposes an enterprise-specific approach which combines lifecycle and activity based costing techniques for software development following the incremental and iterative Unified Process model. Key advantages are calibration effort can be avoided, project management decisions are supported by a clear managerial accounting emphasis, precise milestone-depending cost objectives can be determined as the basis for personnel management and control of development teams, and cost and time variance analysis can be supported in a sophisticated way.