scholarly journals Stakeholder Analysis for Sharing Agro-environment Issues Towards Concerted Action: A Case Study on Diffuse Nitrate Pollution

2006 ◽  
Vol 1 (4) ◽  
pp. 727 ◽  
Author(s):  
Pier Paolo Roggero ◽  
Giovanna Seddaiu ◽  
Marco Toderi

2013 ◽  
Vol 2013 (50) ◽  
pp. 91-105 ◽  
Author(s):  
Laura M.F. Kuipers ◽  
Agnes M. Meershoek


2021 ◽  
Vol 13 (8) ◽  
pp. 4434
Author(s):  
Frazen Tolentino-Zondervan ◽  
Enide Bogers ◽  
Luc van de Sande

Stakeholders play vital roles in the implementation of sustainable last mile logistics solutions. Therefore, the first step in setting up successful sustainable last mile logistics is to conduct stakeholder analysis. This paper analyzes the goals of the stakeholders in the Heijendaal living lab, a city logistics project that uses two hubs for bundling goods to be delivered to the Heijendaal campus in The Netherlands. We use the Theory of Planned Behavior and Policy Deployment to present a qualitative case study, which examines the goals of stakeholders in relation to their roles in the supply chain and in the organization, and if these goals lead to their expected participation behavior. Results show that stakeholders have economic, social, and environmental goals and that some of these goals are prominent within certain groups of stakeholders along the supply chain and within the organization. In addition, the set goals do not always lead to participation behavior of stakeholders due to identified disruptions and habits. This study identifies the importance of information sharing and collaboration within the supply chain, the leading role of middle-level managers in translating strategic to operational goals, and the stimulation of behavioral factors to increase participation of stakeholders in the living lab.





2021 ◽  
Author(s):  
Miha Curk ◽  
Matjaž Glavan ◽  
Marina Pintar ◽  
Vesna Zupanc

<p>Groundwater is the main source of drinking water in Slovenia, but nitrate pollution originating from agricultural activities as well as urban sources such as faulty sewage systems is threatening its quality in several areas of the country. One of such is the Krško-brežiško polje alluvial plain in the southeast. The main aim of this study was to assess the water and nitrogen balance for three common land-use types, as well as the whole area. Three field trial sites were set up to monitor water and nitrogen balance. Gaps in data were further evaluated by SWAT model simulations. Results will contribute to the existing knowledge of nitrate pollution pathways in the area, and strengthen understanding of land use and soil type’s influence on the process.</p><p>This work was funded by the Slovenian Research Agency project L4-8221 and IAEA TCP-SLO5004.</p>



2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Anna Wojewnik-Filipkowska ◽  
Anna Dziadkiewicz ◽  
Wioleta Dryl ◽  
Tomasz Dryl ◽  
Robert Bęben

Purpose Public involvement is essential in the creation of effective local strategies for the development of a sustainable built environment, yet there has been little research on stakeholder motivation and engagement in the creation of infrastructure-project value, in the entire life cycle of a given project, while different markets show that overlooking stakeholders can negatively affect the success of an infrastructure project. The purpose of this paper is to fill the theory-practice gap that has been discerned, and thus study how early public involvement determines the success of an infrastructure project, which is identified with its value creation (effectiveness, sustainability and utility). Design/methodology/approach This research entails a combination of methods. A case study analysis allowed observation of the role the stakeholders play and of how the relationships, perspectives, expectations and risks, along with other soft issues, continue to affect projects. The case study required comprehensive examination of project documentation and conduction of interviews. To collect data, focused group interviews and semi-structured interviews were used, supported with direct questionnaire surveys. Findings The study provides evidence that early public engagement can contribute to infrastructure-project value (effectiveness, sustainability and utility). Practically speaking, the stakeholder analysis performed allowed proposal of a general stakeholder analysis framework for infrastructure projects. It can be implemented at each investment phase of the project life cycle, since stakeholders and their motivation may develop and/or change over time, which necessitates development of proper managerial strategies. The findings highlight the opportunities and the challenges faced by stakeholder management. Research limitations/implications The limitation of this study derives from the fact that the sample size was small, which was necessary for an in-depth qualitative research and application of the case study method. The observations were made on a selected case study, within a limited period of time, thus the context of the analysis as well as the stakeholder perception was subject to possible change. The research limitations concern the provisional nature of the information obtained, the cross-sectional nature of the analysis itself, and, finally, the inability to predict all future events. Ultimately, stakeholder mapping was performed for the operational phase of the investment exclusively, while the analysis was limited to identification and classification of the stakeholders, including their relationship with the project. Practical implications The research conclusions provide useful input for future research on development of effective strategies for management of the shareholders that are related to a given infrastructure project, in order to achieve project success. Simultaneously, from a property perspective, the research has contributed to a better understanding of the importance of infrastructure, on the part of real estate stakeholders. Social implications Application of the approach proposed in the study may contribute to early development and implementation of appropriate trust-building processes. The building of relationships between stakeholders enables checks and balances, promotes short- and long-term project benefits, and increases the value of a project. Originality/value The novelty of the research consists in the connection, as part of infrastructure projects, of the theory of consumption values and the concept of an investment cycle with the framework of stakeholder analysis.





Sign in / Sign up

Export Citation Format

Share Document