Risk Assessment Model Of Fuzzy CIM Based On Contract Energy Management Project

Author(s):  
Yanmei Li ◽  
Jingmin Wang
2016 ◽  
Vol 11 (2) ◽  
pp. 694-721 ◽  
Author(s):  
Charalampos Apostolopoulos ◽  
George Halikias ◽  
Krikor Maroukian ◽  
Georgios Tsaramirsis

Purpose This paper aims to take the challenge to propose a novel modelling approach named Change Risk Assessment Model (CRAM), which will contribute significantly to the missing formality of business models especially in the change risk assessment area and decision-making. Organisational change risks are assessed with the aid of analytic hierarchy process (AHP) in an attempt to define the internal dynamics of organisational change management within project management eliciting also risk cause-and-effect relationships. Design/methodology/approach The study discusses interviews/survey/AHP. Findings The study presents the following findings. Change risk factors assessment (identification and prioritisation) recommendations (see Case Study) integration of change management; project management; risk management top four risk factors, namely, leadership, communication, project management team and culture. Research limitations/implications As projects can be different in a variety of factors (quality, scope), an exhaustive list of risk factors cannot be identified. There is a continuous risk identification process throughout the projects’ life cycle. For example, many risks can be classified initially as unknown and can be refined after the initiation phase of the project. AHP factors limitation (eight per level) possible bias (survey analysis). Practical implications With the aid of modelling and especially CRAM, business change risks can be assessed numerically and prioritised. Several risk factors and related attributes were identified and categorised. This empowers project managers or other stakeholders to make proper decisions about whether to take on or abandon respective organisational or project changes. Social implications One of the values of CRAM is that it can be regarded as a global change risk assessment method that can be applied regardless of project type, size or organisation. Moreover, it has the advantage that it can be used by any kind of project, as the method is designed to be tailored to specific needs, taking significant environmental change risk factors into account. AHP has numerous uses in operational research, in project management and in general in areas where decisions (evaluation and selection) have to be made. The analysis of the case study presented, indicated that it is vital to assess the degree (impact) that each risk attribute poses to address complex organisational decisions. Originality/value CRAM aims to bridge the gap between theoretical and applied work in the integrated research field of change management, project management and risk management. Furthermore, the approach attempts to develop a novel systematic methodology (model) for assigning probabilities in attributes (criteria) pair-wise comparison and more specifically, modelling and assessing change management risks, adding a different perspective and technique to the research area.


2010 ◽  
Vol 151 (34) ◽  
pp. 1365-1374 ◽  
Author(s):  
Marianna Dávid ◽  
Hajna Losonczy ◽  
Miklós Udvardy ◽  
Zoltán Boda ◽  
György Blaskó ◽  
...  

A kórházban kezelt sebészeti és belgyógyászati betegekben jelentős a vénásthromboembolia-rizikó. Profilaxis nélkül, a műtét típusától függően, a sebészeti beavatkozások kapcsán a betegek 15–60%-ában alakul ki mélyvénás trombózis vagy tüdőembólia, és az utóbbi ma is vezető kórházi halálok. Bár a vénás thromboemboliát leggyakrabban a közelmúltban végzett műtéttel vagy traumával hozzák kapcsolatba, a szimptómás thromboemboliás események 50–70%-a és a fatális tüdőembóliák 70–80%-a nem a sebészeti betegekben alakul ki. Nemzetközi és hazai felmérések alapján a nagy kockázattal rendelkező sebészeti betegek többsége megkapja a szükséges trombózisprofilaxist. Azonban profilaxis nélkül marad a rizikóval rendelkező belgyógyászati betegek jelentős része, a konszenzuson alapuló nemzetközi és hazai irányelvi ajánlások ellenére. A belgyógyászati betegek körében növelni kell a profilaxisban részesülők arányát és el kell érni, hogy trombózisrizikó esetén a betegek megkapják a hatásos megelőzést. A beteg trombóziskockázatának felmérése fontos eszköze a vénás thromboembolia által veszélyeztetett betegek felderítésének, megkönnyíti a döntést a profilaxis elrendeléséről és javítja az irányelvi ajánlások betartását. A trombózisveszély megállapításakor, ha nem ellenjavallt, profilaxist kell alkalmazni. „A thromboemboliák kockázatának csökkentése és kezelése” című, 4. magyar antithromboticus irányelv felhívja a figyelmet a vénástrombózis-rizikó felmérésének szükségességére, és elsőként tartalmazza a kórházban fekvő belgyógyászati és sebészeti betegek kockázati kérdőívét. Ismertetjük a kockázatbecslő kérdőíveket és áttekintjük a kérdőívekben szereplő rizikófaktorokra vonatkozó bizonyítékokon alapuló adatokat.


Author(s):  
C.K. Lakshminarayan ◽  
S. Pabbisetty ◽  
O. Adams ◽  
F. Pires ◽  
M. Thomas ◽  
...  

Abstract This paper deals with the basic concepts of Signature Analysis and the application of statistical models for its implementation. It develops a scheme for computing sample sizes when the failures are random. It also introduces statistical models that comprehend correlations among failures that fail due to the same failure mechanism. The idea of correlation is important because semiconductor chips are processed in batches. Also any risk assessment model should comprehend correlations over time. The statistical models developed will provide the required sample sizes for the Failure Analysis lab to state "We are A% confident that B% of future parts will fail due to the same signature." The paper provides tables and graphs for the evaluation of such a risk assessment. The implementation of Signature Analysis will achieve the dual objective of improved customer satisfaction and reduced cycle time. This paper will also highlight it's applicability as well as the essential elements that need to be in place for it to be effective. Different examples have been illustrated of how the concept is being used by Failure Analysis Operations (FA) and Customer Quality and Reliability Engineering groups.


2013 ◽  
Vol 19 (3) ◽  
pp. 521-527 ◽  
Author(s):  
Song YANG ◽  
Shuqin WU ◽  
Ningqiu LI ◽  
Cunbin SHI ◽  
Guocheng DENG ◽  
...  

2021 ◽  
Vol 13 (2) ◽  
pp. 826
Author(s):  
Meiling Zhou ◽  
Xiuli Feng ◽  
Kaikai Liu ◽  
Chi Zhang ◽  
Lijian Xie ◽  
...  

Influenced by climate change, extreme weather events occur frequently, and bring huge impacts to urban areas, including urban waterlogging. Conducting risk assessments of urban waterlogging is a critical step to diagnose problems, improve infrastructure and achieve sustainable development facing extreme weathers. This study takes Ningbo, a typical coastal city in the Yangtze River Delta, as an example to conduct a risk assessment of urban waterlogging with high-resolution remote sensing images and high-precision digital elevation models to further analyze the spatial distribution characteristics of waterlogging risk. Results indicate that waterlogging risk in the city proper of Ningbo is mainly low risk, accounting for 36.9%. The higher-risk and medium-risk areas have the same proportions, accounting for 18.7%. They are followed by the lower-risk and high-risk areas, accounting for 15.5% and 9.6%, respectively. In terms of space, waterlogging risk in the city proper of Ningbo is high in the south and low in the north. The high-risk area is mainly located to the west of Jiangdong district and the middle of Haishu district. The low-risk area is mainly distributed in the north of Jiangbei district. These results are consistent with the historical situation of waterlogging in Ningbo, which prove the effectiveness of the risk assessment model and provide an important reference for the government to prevent and mitigate waterlogging. The optimized risk assessment model is also of importance for waterlogging risk assessments in coastal cities. Based on this model, the waterlogging risk of coastal cities can be quickly assessed, combining with local characteristics, which will help improve the city’s capability of responding to waterlogging disasters and reduce socio-economic loss.


Atmosphere ◽  
2019 ◽  
Vol 10 (3) ◽  
pp. 104 ◽  
Author(s):  
Qiang Liu ◽  
Hongmao Yang ◽  
Min Liu ◽  
Rui Sun ◽  
Junhai Zhang

Cities located in the transitional zone between Taihang Mountains and North China plain run high flood risk in recent years, especially urban waterlogging risk. In this paper, we take Shijiazhuang, which is located in this transitional zone, as the study area and proposed a new flood risk assessment model for this specific geographical environment. Flood risk assessment indicator factors are established by using the digital elevation model (DEM), along with land cover, economic, population, and precipitation data. A min-max normalization method is used to normalize the indices. An analytic hierarchy process (AHP) method is used to determine the weight of each normalized index and the geographic information system (GIS) spatial analysis tool is adopted for calculating the risk map of flood disaster in Shijiazhuang. This risk map is consistent with the reports released by Hebei Provincial Water Conservancy Bureau and can provide reference for flood risk management.


Sign in / Sign up

Export Citation Format

Share Document