Overview of Feasibility Study Procedures for Public Construction Projects in Arab Countries

2007 ◽  
Vol 18 (1) ◽  
pp. 19-34 ◽  
Author(s):  
Azza Abou-Zeid ◽  
Ashraf Bushraa ◽  
Maged Ezzat
2013 ◽  
Vol 19 (1) ◽  
pp. 121-135 ◽  
Author(s):  
Ercan Erdis

The current public procurement law (Law No. 4734) was established in Turkey in 2003. The current law has fundamental differences from the previous one, Law No. 2886, in that the current law's main objective is to increase the effective use of public resources. Although the current law was enacted nine years ago, no in-depth research has been undertaken related to the extent of public savings. Thus, the aim of this research is to analyze the performance of public investments for construction with respect to their success in achieving on time and within budget completion. Additionally, a comparison between the completion duration and budget of construction projects undertaken under the current and the previous law is presented. To achieve these goals, historical contract documents addressing 878 and 575 public construction projects undertaken under two laws, respectively, were analyzed. In this context, the data mining method, including decision trees, artificial neural network, and support vector machines, was applied to predict the duration and cost deviations of the construction projects during the tender process, and the results were compared. It was demonstrated that the current law has contributed substantially towards the completion of the projects within estimated or envisaged durations and costs. The findings of this research can be generalized to countries with similar economical and organizational structures with Turkey.


Author(s):  
Chris Myers Asch ◽  
George Derek Musgrove

This chapter describes the founding of Washington, D.C., as the capital of the United States. The area that became Washington was a fully functioning slave society, and the city that grew atop those fields incorporated slavery into every aspect of life. From its inception Washington embodied the contradiction endemic to America itself, the paradoxical juxtaposition of freedom and slavery that bedeviled the nation and ultimately led to the Civil War. Enslaved people worked on public construction projects, they were bought and sold within sight of the Capitol, they drove the hacks that crisscrossed the city, and they waited on the men who ran the nation. Early Washington was a Southern city that was immersed in slavery and benefited immensely from it. Another contradiction embedded into the fabric of the city was that its citizens lacked democracy’s basic unit of currency: the right to vote. The city became a political colony, a district whose fate rested not with the local people who called it home but with the national political leaders who resided there temporarily.


Author(s):  
Andreas Økland ◽  
Nils O. E. Olsson

Scope management in the form of reduction lists was integrated in the quality assurance scheme for Norwegian public projects in 2001. This article presents findings on the actual use of reduction lists for major public construction projects Project representatives were contacted to obtain information about the actual use of pre-defined potential scope reductions. Eight of the 14 studied projects did not implement any of the predefined reductions. Six projects implemented some of the reductions. The scope reductions on the reduction lists are very specific and detailed, unlike general theory on scope management and cost control. However, the findings from the study are in line with the general theory; it was the most general scope and cost reductions that where used in practice. The study subsequently looked into the relationship between scope reductions and sustainability. Although the most frequently observed reduction was of the category “reduced quality or functionality”, sustainability was rarely affected with the notable exception of the railway infrastructure projects.


2019 ◽  
Vol 10 (1) ◽  
pp. 16-27
Author(s):  
Ahmed M.Z. Sayed ◽  
Sadi Assaf ◽  
Adel S. Aldosary ◽  
Mohammad A. Hassanain ◽  
Abdullatif Abdallah

Purpose The purpose of this paper is to identify the key drivers for adopting electronic bidding (e-bidding) systems in public construction projects located in Saudi Arabia. Design/methodology/approach Literature review was undertaken to identify the drivers of e-bidding practices. Nine drivers, classified under four categories, were identified. A questionnaire survey was developed to assess the significance of the identified drivers. Responses were obtained from 20 large contractors, classified as Grade I and II contractors in Saudi Arabia, and 12 governmental authorities, representing owners of construction projects. The drivers were ranked according to their respective significance index (SI) values. Finally, a Spearman’s rank correlation coefficient was employed to ascertain the extent to which the two parties agreed on the significance level of the drivers. Findings Analysis of the identified drivers revealed that the most significant driver was “reduction in the physical storage requirements of bidding paperwork.” Further, a consensus was observed with regards to the significance of the drivers. The findings of the present study highlight the strong potential of widespread e-bidding adoption in Saudi Arabia. It demonstrates the key drivers for the implementation of e-bidding through the perspective of professionals within the context of Saudi Arabia. Originality/value Prior to this study, no previous research has endeavored to assess the drivers of e-bidding adoption in Saudi Arabia. The adoption of e-bidding will benefit organizations through improved efficiencies, which could potentially lower construction costs, thereby contributing to economic growth and benefitting the society at large.


Sign in / Sign up

Export Citation Format

Share Document