scholarly journals Exploring Project Complexity Relations to Scope Changes in Construction Projects: A Case Study of NEC Projects in South Africa

2021 ◽  
Vol 21 (2) ◽  
Author(s):  
Themba Lukhele ◽  
Brink Botha ◽  
Sijekula Mbanga

Construction projects are of very complex nature, and subject to circumstances of high uncertainties and risks due to the interdependences of activities and processes in the project performance.  As a result of the dynamic complexities inherited in construction projects, changes in the scope of work are inevitable. Of particular concern is that, when scope changes are introduced in a project, contractors follow a systematic procedure in managing the changes, but with poor planning and implementation thereof because the project complexities that underpin the scope changes are not fully understood. Therefore, despite that complexity is an inherent and defining feature of construction projects, studies in the literature have failed to grasp and present the dynamics of project complexity which underlie the scope changes in the delivery of construction project. The TOE (Technical Organizational Environmental) framework was adopted and applied on a multiple-case study research design in order to explore and denote project complexity relations to scope changes in construction projects. Through a content analysis procedure, six key elements of project complexities that relate to scope changes in the construction projects has emerged. Understanding these complexity elements could enable the project management team to apply a front-end planning approach in the initiation phase of the projects in order to better manage scope changes in the execution phase of the project, and eventually to improve the project performance.

2018 ◽  
Vol 18 (2) ◽  
pp. 1-14 ◽  
Author(s):  
Jesper Kranker Larsen ◽  
Søren Munch Lindhard ◽  
Thomas Ditlev Brunoe ◽  
Kim Noergaard Jensen

Pre-planning of construction projects is important for the performance of cost, time, and quality. However, recent research finds that quality related to final testing, adjustment, and balancing of HVAC systems are often overlooked due to deadline pressure. Consequently, this results in poor energy performance and dissatisfied end-users. The purpose of this study is to investigate the relationship between pre-planning, commissioning, and project performance. A publicly funded project with a compressed construction period was followed as a case study. During the case study, passive observation, semi-constructed interviews, and questionnaires were applied. This study showed that by implementing commissioning, project pre-planning and organizational support is increased. Moreover, the commissioning process creates awareness and fosters proactivity between the project participants, thus complications are discovered and handled earlier. By improved pre-planning and organizational support, and increasing proactivity, the project’s cost, time and quality performance is improved. This underlines the importance of prioritizing pre-planning. Moreover, increased energy and technical demands increase project complexity which makes project success even more dependent on the quality of the plans.


2013 ◽  
Vol 19 (5) ◽  
pp. 759-711 ◽  
Author(s):  
Andrew Ross ◽  
Katie Dalton ◽  
Begum Sertyesilisik

This study aims to determine the accuracy of the cash flow models and to investigate if these models could be more accurate if they accounted for the potentially influential variables specific to individual construction projects. An analytical case study research strategy has been implemented in collecting data for the construction projects. The data collected has been tested against recognised models. Statistical analyses have been carried out on the data for the specified variables, culminating in the potential proposal of an improved model with respect to these identified variables. The results revealed that the independent variables (type of construction, procurement route and type of work) affect the cash flow forecast. The findings suggested that a model could be more accurate with the input of more job-specific variables and that Hudson's DHSS model is best suited to a construction project procured traditionally. Adopting the ‘trial and error’ approach, Hudson's DHSS model has been recognised as an accurate model that could be adapted slightly, through changing the parameter values. The clients and the contractors are the main beneficiaries approached for this study.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mechiel van Manen ◽  
Léon olde Scholtenhuis ◽  
Hans Voordijk

PurposeThis study aims to empirically validate five propositions about the benefits of three-dimensional (3D) visualizations for the management of subsurface utility projects. Specifically, the authors validate whether benefits from 3D in the literature of building construction project management also apply to subsurface utility projects and map them using a taxonomy of project complexity levels.Design/methodology/approachA multiple case study of three utility construction projects was carried out during which the first author was involved in the daily work practices at a utility contractor. 3D visualizations of existing project models were developed, and design and construction meetings were conducted. Practitioners' interactions with and reflections on these 3D visualizations were noted. Observational data from the three project types were matched with the five propositions to determine where benefits of 3D visualizations manifested themselves.FindingsPractitioners found that 3D visualizations had most merit in crowded urban environments when constructing rigid pipelines. All propositions were validated and evaluated as beneficial in subsurface utility projects of complexity level C3. It is shown that in urban projects with rigid pipelines (project with the highest complexity level), 3D visualization prevents misunderstanding or misinterpretations and increases efficiency of coordination. It is recommended to implement 3D visualization approaches in such complex projectsOriginality/valueThere is only limited evidence on the value 3D visualizations in managing utility projects. This study contributes rich empirical evidence on this value based on a six-month observation period at a subsurface contractor. Their merit was assessed by associating 3D approaches with project complexity levels, which may help utility contractors in strategically implementing 3D applications.


2017 ◽  
Vol 27 (14) ◽  
pp. 2201-2210 ◽  
Author(s):  
Elsie Breet ◽  
Jason Bantjes

Few qualitative studies have explored the relationship between substance use and self-harm. We employed a multiple-case study research design to analyze data from 80 patients who were admitted to a hospital in South Africa following self-harm. Our analysis revealed, from the perspective of patients, a number of distinct ways in which substance use is implicated in self-harm. Some patients reported that substance intoxication resulted in poor decision making and impulsivity, which led to self-harm. Others said substance use facilitated their self-harm. Some participants detailed how in the past their chronic substance use had served an adaptive function helping them to cope with distress, but more recently, this coping mechanism had failed which precipitated their self-harm. Some participants reported that substance use by someone else triggered their self-harm. Findings suggest that there are multiple pathways and a host of variables which mediate the relationship between substance use and self-harm.


Author(s):  
Tefo Sekgweleo

Many organizations resort to software deployment with the intention to simplify their daily activities, and for competitive advantage. The deployment consists of two main phases, development and implementation. Unfortunately, software doesn't always fulfil the organization's intentions. This is attributed to numerous factors, some of complex nature, which happen among humans, non-humans, and between humans and non-humans actors during development and implementation of software. Case study research was conducted to understand the roles of actors, and how their actions and interactions impact the development and implementation of software in the organization. Actor Network Theory (ANT) was employed in the analysis of the data. The theory focused on activities including the negotiation among actors which happened within heterogeneous network.