scholarly journals Owner Project Safety Leadership and Explosives Management in a Construction Project in Kashmir

2019 ◽  
Vol 5 (1) ◽  
pp. 24
Author(s):  
Paul James

This is research is focused on the evaluation of Owner Engineer perceptions and its impacts on Explosives management practices and developments related to an Engineering, Procurement and Construction Contract (EPC) Tunnel Construction Project in Kashmir using an interpretive methodology.The scope for this research was the Owner engineer project team. The population of interest was made up of 13 senior engineers, encompassing a multi-site EPC Tunnel Construction Project. Eleven (11) senior engineers were carefully targeted as a designed sample size.The research outcomes consisted of three (3) Main Themes - Site Safety; Explosives Management and Security Issues and fourteen (14) sub-themes, with 387 dialogue targets.The paper addresses a variety of major issues resulting from the analysis of narrative data relating to Owner project safety leaderships and raises determinations of the implications for managing safety at the project sites and in the wider community.

2021 ◽  
Vol 13 (8) ◽  
pp. 4513
Author(s):  
Summaira Malik ◽  
Muhammad Taqi ◽  
José Moleiro Martins ◽  
Mário Nuno Mata ◽  
João Manuel Pereira ◽  
...  

The success of a construction project is a widely discussed topic, even today, and there exists a difference of opinion. The impact of communication and conflict on project success is an important, but least addressed, issue in literature, especially in the case of underdeveloped countries. Miscommunication and conflict not only hinder the success of a project but also may lead to conflicts. The focus of this paper was to examine the impact of communication on project success with the mediating role of conflict. By using SPSS, demographics, descriptive statistics and correlation were determined. Smart PLS version 3.0 was used for confirmatory factor analysis (CFA), internal accuracy and validity estimates, hypothesis checking and mediation testing. The results showed that formal communication has a negative impact on the success of a construction project, resulting in conflicts among project team members, whereas informal communication and communication willingness have a positive impact on project success because people tend to know each other, and trust is developed. Task, process and relationship conflicts were used as mediating variables. It was found that task conflict effects the relations positively because project team members suggest different ways to do a certain task, and, hence, project success is achieved. On the contrary, process conflict and relationship conflict have a negative impact on communication and project success. Both of these conflicts lead to miscommunication, and project success is compromised. Hence, it is the responsibility of the project manager to enhance communication among project team members and to reduce the detrimental effects of process and relationship conflict on project success.


1995 ◽  
Vol 3 ◽  
pp. 101-112
Author(s):  
Mamoru Haruna ◽  
Akira Kitazumi ◽  
Zenichi Igarashi ◽  
Susumu Namerikawa

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Amirali Shalwani ◽  
Brian Lines

PurposeThe Project Management Body of Knowledge recommends the use of issue logs as a best practice to minimize the potential project cost and schedule growth. Although the broader topic of project control has been widely studied in the construction literature, the specific application of issue logs has remained relatively understudied. This study aims to analyze the extent and consistency with which construction teams utilize issue logs and the corresponding project performance outcomes.Design/methodology/approachA dataset of 5,635 individual issues was gathered from the final issue logs of 881 small building projects delivered via the design–bid–build method. Differences between groups were determined using the Kruskal–Wallis H test with post hoc testing via the Mann–Whitney U test with pairwise comparison.FindingsThe results showed that, on average, project teams who used issue logs to a greater extent achieved a 3.1 to 4.3% reduction in cost growth and a 5.3 to 12.3% reduction in schedule growth. This result shows that issue logs can be used to improve construction project performance in the areas of cost and schedule.Originality/valueThis result provides a contribution to practitioners, wherein project teams should be encouraged to establish their issue management practices early in the project schedule to encourage greater issue log usage for the remainder of the project.


2020 ◽  
Vol 217 ◽  
pp. 11012
Author(s):  
M Oskolkova

The article is devoted to the analysis of the stages and tools for managing the construction project of SK Art-Sroy LLC and the development of the normal of the project planning process, the matrix of responsibility and the structure of the project team. The main activity of the organization is general contracting, management of all processes at the construction site, control of each stage of production, responsibility for implementation of the project, starting with preparation of the site and ending with the delivery of the finished object to the Customer. For clarity, the normal of one of the stages of project management is presented, with its help it is possible to trace the technologies for performing individual tasks and relationship of individual officials. The structure of the construction project team was developed and the matrix of responsibility of the project participants was determined. Also, in the course of the analysis, a number of issues were identified that the organization faces in the process of managing a construction project.


2021 ◽  
Vol 907 (1) ◽  
pp. 012022
Author(s):  
G Reinaldo ◽  
A Andi ◽  
V Ong

Abstract Intellectual and emotional intelligences are two important competences of project managers for the success or failure of a construction project. This study aims to investigate how often project managers utilize these two intelligences in running their project. It will also take a look the intelligence that construction personnel expect more from their project manager. The research was conducted by distributing questionnaires to construction personnel that were working on ongoing projects. The results show that the project managers use both intellectual and emotional intelligences, with mean values of 4.20 and 4.12 respectively. Meanwhile, results from analytical hierarchy process analyses portray that the project team members expect the project managers to exhibit emotional intelligence more than intellectual intelligence with weight of 66.40% and 33.60% respectively. The study also conducts several analyses by using respondents’ and project managers’ general information.


2020 ◽  
Vol 6 (4) ◽  
pp. 1365-1375
Author(s):  
Shahid Iqbal ◽  
Nabeel Ehtisham ◽  
Syed Farqaleet K. Bukhari ◽  
Shahid Mahmood

Project Risk management is known as an important workout for the achievement of desired objectives for the construction projects. Success in construction project is quantified by attaining its enactment in terms of project quality, project cost, project time, project safety. Construction projects in Pakistan, typically in the whole world have a high risk of being pointedly late and over budget. However, a bit of schedule and cost related risks are unavoidable in any construction project around the world. It was found out that the engineers were generally nominated earlier the design phase of any project. Due to this reason maximum projects did not get the advantage from SMEs at the planning stage of the project. This study also supports that project managers who are engineers be involved in construction projects site selection, in preliminary budget and schedule development by using good Engineering Management Practices.