Abstract
The air conditioning system of ice storage and water storage has been applied in many practical projects. This paper introduces the air conditioning system form of Fuyang Electric Power Dispatching Building. The design condition of cold and heat sources and its transmission and distribution system is also introduced. In addition, this paper also collects and analyses the data of the chillers in actual operation. The results show that the system runs steadily and accords with the design conditions.