steel work
Recently Published Documents


TOTAL DOCUMENTS

55
(FIVE YEARS 9)

H-INDEX

6
(FIVE YEARS 0)

2021 ◽  
Vol 2 (1) ◽  
Author(s):  
Ravika Nur Melinda ◽  
Laisita Meitya Ningrum ◽  
Ida Bagus Suryabrata ◽  
Gede Swarna Bayu Artha Dwipa ◽  
Tyas Pratama Sukoco

ABSTRACT Making a budget plan in a project is often done manually which of course takes a long time to complete. In determining the budget plan, there are many types of work such as preparatory work, reinforced concrete work, and steel work, so it is quite difficult to work on. The budget plan can only be done by experts in the field, so it requires quite expensive processing costs. From the problems described above, we need a program that can simplify the calculation of the budget plan, especially in steel works (WF Beam). In this case, we created a program using the python language that needed to input some data such as rod length, number of bars, type of steel, steel prices, and work wages so that it would immediately produce a value or amount of the volume and price of a steel work that could help contractors especially steel subcontractors in calculating steel work (WF Beam). Keywords: python, RAB, WF beam, work volume, job price. ABSTRAK Pembuatan rencana anggaran dan biaya dalam sebuah proyek sering dilakukan secara manual yang tentunya membutuhkan waktu yang cukup lama untuk menyelesaikannya. Dalam menentukan rencana anggaran dan biaya, ada banyak jenis pekerjaan seperti pekerjaan persiapan, pekerjaan beton bertulang, dan pekerjaan baja, sehingga cukup sulit untuk dikerjakan. Rencana anggaran dan biaya juga hanya bisa dikerjakan oleh tenaga ahli pada bidang tersebut sehingga membutuhkan biaya pengerjaan yang cukup mahal. Dari permasalahan yang sudah dijabarkan diatas maka dibutuhkan sebuah program yang dapat mempermudah perhitungan rencana anggaran dan biaya khususnya di pekerjaan baja (WF Beam). Dalam hal ini, kami membuat sebuah program menggunakan bahasa python yang perlu menginputkan beberapa data seperti panjang batang, jumlah batang, jenis baja, harga baja, dan upah pekerjaan sehingga  akan langsung menghasilkan nilai atau besaran dari volume dan harga suatu pekerjaan baja yang dapat membantu kontraktor khususnya sub kontraktor baja dalam melakukan perhitungan pekerjaan baja (WF Beam). Kata kunci: python, RAB , WF beam, volume pekerjaan, harga pekerjaan.


Heliyon ◽  
2021 ◽  
pp. e07658
Author(s):  
Paul Chukwulozie Okolie ◽  
Echezona Nnaemeka Obika ◽  
Benjamin Segun Oluwadare ◽  
Azaka Onyemazuwa Andrew ◽  
Uchenna Onyebuchi Okolie

Heliyon ◽  
2020 ◽  
Vol 6 (9) ◽  
pp. e04783
Author(s):  
Paul Chukwulozie Okolie ◽  
Echezona Nnaemeka Obika ◽  
Benjamin Segun Oluwadare ◽  
Obiora Nnaemeka Ezenwa ◽  
Chinedu Stanley Udensi

2019 ◽  
Vol 8 (2) ◽  
pp. 3328-3330

The importance of health and environment has forced Machining Industries to reduce the application of Petroleum-based cutting fluid. But to ease the machining process and to increase the tool life, cutting fluids must be used. Research has been done on vegetable oils as cutting fluids which is easy for disposal and does not affect the environment and the operator’s health [1] . This paper discusses the machinability and tool life during drilling of a mild steel work piece using Neem, Karanja, blends of 50%Neem-50%Karanja, 33.3%Neem-66.6%Karanja, 66.6%Neem-33.3%Karanja as cutting fluid. Results obtained using petroleum-based oil are compared with the results obtained by using above mentioned combination of oils and also with dry cutting conditions.


2019 ◽  
Vol 136 ◽  
pp. 03023
Author(s):  
Chen Dong ◽  
Ding Shaopeng ◽  
Chen Ming ◽  
Shao Chenyue

BIM can achieve analogue simulate the real information of buildings through digital information, aiming to find engineering problems in advance, correct errors timely and reduce waste. At present, BIM has been widely used in the design and construction stage of the construction industry. As a plug-in of AutodeskRevit, Fuzor software can find the problems in the design and construction more intuitive and real, and synchronize the changes. In this massage, the author will take the construction simulation application of 11#experimental building in Fuzor as an example to study the application of Fuzor in constructional engineering.


2018 ◽  
Vol 24 (3) ◽  
Author(s):  
Rasa KANDROTAITĖ JANUTIENĖ ◽  
Darius MAŽEIKA

Sign in / Sign up

Export Citation Format

Share Document