hongze lake
Recently Published Documents


TOTAL DOCUMENTS

64
(FIVE YEARS 18)

H-INDEX

10
(FIVE YEARS 2)

2021 ◽  
Vol 597 ◽  
pp. 126188
Author(s):  
Yun Luo ◽  
Zengchuan Dong ◽  
Yuhuan Liu ◽  
Dunyu Zhong ◽  
Feiqing Jiang ◽  
...  

2021 ◽  
Vol 13 (9) ◽  
pp. 4857
Author(s):  
Zitong Yang ◽  
Xianfeng Huang ◽  
Jiao Liu ◽  
Guohua Fang

In order to meet the demand of emergency water supply in the northern region without affecting normal water transfer, considering the use of the existing South-to-North Water Transfer eastern route project to explore the potential of floodwater resource utilization in the flood season of Hongze Lake and Luoma Lake in Jiangsu Province, this paper carried out relevant optimal operating research. First, the hydraulic linkages between the lakes were generalized, then the water resources allocation mode and the scale of existing projects were clarified. After that, the actual available amount of flood resources in the lakes was evaluated. The average annual available floodwater resources in 2003–2017 was 1.49 billion m3, and the maximum available capacity was 30.84 billion m3. Then, using the floodwater resource utilization method of multi period flood limited water levels, the research period was divided into the main flood season (15 July to 15 August) and the later flood season (16 August to 10 September, 11 September to 30 September) by the Systematic Clustering Analysis method. After the flood control calculation, the limited water level of Hongze Lake in the later flood season can be raised from 12.5 m to 13.0 m, and the capacity of reservoir storage can increase to 696 million m3. The limited water level of Luoma Lake can be raised from 22.5 m to 23.0 m (16 August to 10 September), 23.5 m (11 September to 30 September), and the capacity of reservoir storage can increase from 150 to 300 million m3. Finally, establishing the floodwater resource optimization model of the lake group with the goals of maximizing the floodwater transfer amount and minimizing the flood control risk rate, the optimal water allocation scheme is obtained through the optimization algorithm.


2020 ◽  
Vol 46 (6) ◽  
pp. 1511-1520
Author(s):  
Yu Cai ◽  
Chang-Qing Ke ◽  
Xiaoyi Shen

Sign in / Sign up

Export Citation Format

Share Document