transmission operator
Recently Published Documents


TOTAL DOCUMENTS

14
(FIVE YEARS 2)

H-INDEX

4
(FIVE YEARS 0)

2021 ◽  
Vol 41 (3) ◽  
pp. 693-712
Author(s):  
Tomislav Jakšić ◽  
Daša Vrzić

Independent transmission operator represents one of three possible approaches to unbundling of the transmission system operator from the other parts of the vertically integrated undertaking. Croatian independent transmission operator is separated from the vertically integrated undertaking based on the independent transmission operator unbundling model. Considering the impending wider need to amend the Croatian legislative framework concerning the electrical energy market this paper critically examines certain problematic aspects of such unbundling process, for example, the regulation of shared use of IT systems (software), computer, network and security infrastructure (hardware) as well as services provided by the same consultants and external contractors. After analysis of existing European legal rules and national rules of comparable member states the paper provides concrete de lege ferenda suggestions for possible future regulation of the considered unbundling aspects.


2009 ◽  
Vol 4 ◽  
pp. 8-10
Author(s):  
Sher Singh Bhat

Due to our lack of vision, planning and other mistakes, Nepal is in a very serious situation of load shedding. The nation is about 200 MW deficit of power supply. Hydropower development is an endeavor related with several sectors. It cannot be taken as only a commercial sector considering that businessmen will make all necessary things when there is a demand. In the past, the transmission sector has not been given due importance. Because of the complex nature of Transmission, there should only be one transmission operator in the country. Based on the periodic basin-wise generation plan of the nation, we should prepare an accelerated Development Plan. The Basin Plan should indicate how and where local level, regional level and national level hydro plants will be connected to the grid, and the sequence of developing the basin transmission network.Hydro Nepal: Journal of Water, Energy and Environment Issue No. 4, January, 2009 Page 8-10


Sign in / Sign up

Export Citation Format

Share Document