pipeline scheduling
Recently Published Documents


TOTAL DOCUMENTS

53
(FIVE YEARS 9)

H-INDEX

8
(FIVE YEARS 2)

2021 ◽  
Vol 23 (11) ◽  
pp. 110-121
Author(s):  
H. E. Mohamed ◽  
◽  
M.E. Awad ◽  
S. A. Aly ◽  
◽  
...  

The optimal scheduling system of multi product pipelines is benefited to improve the economy and safety transportation. This paper addresses how to optimize detailed schedules of a multi-product pipeline. The study covers multi fluid pipeline by national pipeline company which is 130 Km. We concern with batching of (Gas oil, Jet fuel, Naphtha, Gasoline 80, Gasoline 95) and here comes the problem of contamination of one fluid with another which is leading fluid. This study estimates the volume of mixing zone for each interface by equation of Austin J.E and palfrey J.R, determines contaminated volume cost and storage volume needed for each cycle and assures that transportation is within flat zone and yield minimum value of interface volume providing the optimum multi-product pipeline scheduling.


2019 ◽  
Vol 16 (5) ◽  
pp. 1159-1175 ◽  
Author(s):  
S. Moradi ◽  
S. A. MirHassani ◽  
F. Hooshmand

2019 ◽  
Vol 144 ◽  
pp. 79-94 ◽  
Author(s):  
Qi Liao ◽  
Haoran Zhang ◽  
Tianqi Xia ◽  
Quanjun Chen ◽  
Zhengbing Li ◽  
...  

2019 ◽  
Vol 6 (1) ◽  
pp. 718-733 ◽  
Author(s):  
Hua Qin ◽  
Weihong Chen ◽  
Buwen Cao ◽  
Min Zeng ◽  
Jessica Li ◽  
...  

2019 ◽  
Vol 52 (13) ◽  
pp. 535-540
Author(s):  
M. Bamoumen ◽  
S. Belil ◽  
S. Elfirdoussi ◽  
L. Ren ◽  
N. Tchernev

Author(s):  
Qi Liao ◽  
Bohong Wang ◽  
Zhengbing Li ◽  
Haoran Zhang ◽  
Yongtu Liang ◽  
...  

Considering market’s diversified demand and transport economy, large volumes of various refined products commonly move down the pipeline in batches, which are pumped at pump stations and delivered to respective delivery stations. The integrate detailed scheduling optimization is a sophisticated problem due to the characteristics of multi-product pipelines, such as market-oriented, fluctuated demand, various processing technique and complicated hydraulic calculation during batch migration. The integrate detailed scheduling optimization has been widely studied during the last decade, however, most of them studied pipeline scheduling and pump scheduling separately. Besides, the proposed methods are mathematical models, whose computational efficiency greatly decreases in large-scale pipeline scheduling, let alone in the problems coupling with pump scheduling. Aiming at this problem, this paper presents a novel depth-first searching approach based on flowrate ratio to deal with the detailed scheduling of operations in a multi-product pipeline with multiple pump stations. As for each single time interval, the proposed method decides an ideal flowrate ratio according to current status, then solves out the optimal flowrate that mostly conforms to the ideal ratio and satisfies all operational constraints, and finally updates information for next time interval. However, during the computational procedure, backtracking method would be adopted to modify the previous flowrate ratios and recalculate new flowrate when the actual delivered products are insufficient. Finally, a case tested on a Chinese real-world pipeline with 6 delivery stations is given to demonstrate the veracity and practicability of the proposed method. From the results, computing time of the case is within 1 minute, and the solved detailed scheduling plans can fulfill demand with stable pump operations. Besides, the proposed approach is scarcely influenced by the scale of pipeline structure and time horizon, so it is also applicable to the long-term scheduling of a pipeline with many delivery stations.


Sign in / Sign up

Export Citation Format

Share Document