Research on Recycling Mining System and Its Risk Analysis in Eastern China

Author(s):  
Lili Bian ◽  
Min Zhou ◽  
Aibin Li ◽  
Shitong Ge



2010 ◽  
Vol 58 (S 01) ◽  
Author(s):  
J Schönebeck ◽  
B Reiter ◽  
O Haye ◽  
D Böhm ◽  
M Ismail ◽  
...  




Geo-Risk 2017 ◽  
2017 ◽  
Author(s):  
Jeanne Major ◽  
Mark Vandeberg


2019 ◽  
Vol 16 (6) ◽  
pp. 60-77
Author(s):  
E. V. Vasilieva ◽  
T. V. Gaibova

This paper describes the method of project risk analysis based on design thinking and explores the possibility of its application for industrial investment projects. Traditional and suggested approaches to project risk management have been compared. Several risk analysis artifacts have been added to the standard list of artifacts. An iterative procedure for the formation of risk analysis artifacts has been developed, with the purpose of integrating the risk management process into strategic and prompt decision-making during project management. A list of tools at each stage of design thinking for risk management within the framework of real investment projects has been proposed. The suggested technology helps to determine project objectives and content and adapt them in regards to possible; as well as to implement measures aimed at reducing these risks, to increase productivity of the existing risk assessment and risk management tools, to organize effective cooperation between project team members, and to promote accumulation of knowledge about the project during its development and implementation.The authors declare no conflict of interest.



2019 ◽  
Vol 79 (2) ◽  
pp. 109-126
Author(s):  
D Tian ◽  
J Su ◽  
F Zhou ◽  
B Mayer ◽  
D Sein ◽  
...  


KURVATEK ◽  
2018 ◽  
Vol 3 (1) ◽  
pp. 21-34
Author(s):  
Untung Wahyudi ◽  
Excelsior T P ◽  
Luthfi Wahyudi

PT. Putera Bara Mitra used open mining system for mining operation, Yet the completion of study on the end wall slope stability that  undertaken by geotechnical PT. Putera Bara Mitra in Northwest Pit and the occured a failure in the low wall on the 1st June 2012 led to the need for analysis and design the overall slope at the mine site. To analyze and design the overall slope, used value of the recommended minimum safety. The value was based on company for single slope SF ≥ 1.2 and SF ≥ 1.3 for overall slope. The calculation used Bichop method with the help of software slide v 5.0. Geometry improvements was done at the low slopes that originally single wall with a 30 m bench height and a slope 70° with SF = 0.781, into 4 levels with SF = 1.305. The analysis explained the factors that affect the stability of the low wall included the mining slope geometry, unfavorable drainase system, material stockpiles and seismicity factors. It was necessary to do prevention efforts to maintain the stability of the slope included the redesign to slope geometry, handling surface and subsurface water in a way to control slopes draining groundwater, vegetation stabilization using and monitoring slope using Total Station with Prism and Crackmeter to determine the movement of cracks visible on the surface. 



Sign in / Sign up

Export Citation Format

Share Document