A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction

Author(s):  
Yun-ok Kim ◽  
Dong-hyuk Lee ◽  
Du-hee Park
2021 ◽  
Vol 11 (8) ◽  
pp. 3438
Author(s):  
Jorge Fernandes ◽  
João Reis ◽  
Nuno Melão ◽  
Leonor Teixeira ◽  
Marlene Amorim

This article addresses the evolution of Industry 4.0 (I4.0) in the automotive industry, exploring its contribution to a shift in the maintenance paradigm. To this end, we firstly present the concepts of predictive maintenance (PdM), condition-based maintenance (CBM), and their applications to increase awareness of why and how these concepts are revolutionizing the automotive industry. Then, we introduce the business process management (BPM) and business process model and notation (BPMN) methodologies, as well as their relationship with maintenance. Finally, we present the case study of the Renault Cacia, which is developing and implementing the concepts mentioned above.


IFLA Journal ◽  
2021 ◽  
pp. 034003522110230
Author(s):  
Genevieve Pierce

In 2018, the Harry Ransom Center at the University of Texas at Austin rehoused over 300 illustrated movie storyboards from the popular and frequently used David O Selznick Collection. Preservation technicians tracked this project from its inception to the survey and design conception, and through to its execution. By creating a new housing model and refining it over the course of a year, the Preservation Unit was able to consider how housing affects an object, which led to new systems and structures to facilitate process management and workflow, and how an object is impacted by its housing.


2021 ◽  
pp. 1-14
Author(s):  
Seyed Taha Hossein Mortaji ◽  
Siamak Noori ◽  
Morteza Bagherpour

Earned value management is well-known as the most efficient method of project monitoring and control providing relatively reliable information about the project performance. However, this method requires accurate estimates of the progress of project activities, which are always associated with uncertainties that, if ignored or not addressed well, lead to incorrect results. To address this issue, the application of multi-valued logic, in particular fuzzy logic, in earned value management has recently attracted a lot of attention both in practice and research. This paper introduces directed earned value management (DEVM) in which ordered fuzzy numbers are used to express the so-called uncertainties as well as to capture more information about the trend of the project progress. To evaluate the performance of the proposed method, several numerical examples and a case study are presented. The results reveal that compared to the existing methods, DEVM has a lower computational complexity. Also, it doesn’t suffer from the overestimation effect and as a result, it has a higher ability to express project-specific dynamics. In sum, the proposed method allows project managers to make informed decisions that lead to taking preventive and corrective actions promptly and at a lower cost.


2021 ◽  
Vol 13 (4) ◽  
pp. 2177
Author(s):  
Edson Kogachi ◽  
Adonias Ferreira ◽  
Carlos Cavalcante ◽  
Marcelo Embiruçu

In order to improve the process management of table grape packaging, its performance should be evaluated. However, the literature on performance evaluation indicators is scarce. To address this research gap, we propose a method for the development of performance evaluation indicators for table grape packaging units, which are characterized by labor-intensive and highly seasonal production processes in the agro-economic sector. The stages include the following: contextualizing table grape packaging units, selecting the performance objectives, selecting techniques to be used in the development of the indicators, and applying the method to the packaging units of table grapes. The techniques adopted in the development of the indicators aimed at the cost, quality, flexibility, reliability, and speed performance objectives were data envelopment analysis, principal component analysis, quantification of the batch, compliance with the program within the established deadline, and measurement of the execution time of the batch, respectively. The results obtained in the case study demonstrate that the correlations between the performance indicators do not indicate the need to disregard any of them. Furthermore, the standard deviation values for each indicator are similar. Thus, both results of correlations and standard deviation confirm the importance of the indicators chosen for the performance evaluation of table grape packaging.


2021 ◽  
Vol 1 ◽  
pp. 531-540
Author(s):  
Albert Albers ◽  
Miriam Wilmsen ◽  
Kilian Gericke

AbstractThe implementation of agile frameworks, such as SAFe, in large companies causes conflicts between the overall product development process with a rigid linkage to the calendar cycles and the continuous agile project planning. To resolve these conflicts, adaptive processes can be used to support the creation of realistic target-processes, i.e. project plans, while stabilizing process quality and simplifying process management. This enables the usage of standardisation methods and module sets for design processes.The objective of this contribution is to support project managers to create realistic target-processes through the usage of target-process module sets. These target-process module sets also aim to stabilize process quality and to simplify process management. This contribution provides an approach for the development and application of target-process module sets, in accordance to previously gathered requirements and evaluates the approach within a case study with project managers at AUDI AG (N=21) and an interview study with process authors (N=4) from three different companies.


Sign in / Sign up

Export Citation Format

Share Document