Formulating the integrated forest harvest-scheduling model to reduce the cost of the road-networks

2018 ◽  
Vol 20 (4) ◽  
pp. 2283-2306 ◽  
Author(s):  
Nader Naderializadeh ◽  
Kevin A. Crowe
Author(s):  
Tianpei Tang ◽  
Senlai Zhu ◽  
Yuntao Guo ◽  
Xizhao Zhou ◽  
Yang Cao

Evaluating the safety risk of rural roadsides is critical for achieving reasonable allocation of a limited budget and avoiding excessive installation of safety facilities. To assess the safety risk of rural roadsides when the crash data are unavailable or missing, this study proposed a Bayesian Network (BN) method that uses the experts’ judgments on the conditional probability of different safety risk factors to evaluate the safety risk of rural roadsides. Eight factors were considered, including seven factors identified in the literature and a new factor named access point density. To validate the effectiveness of the proposed method, a case study was conducted using 19.42 km long road networks in the rural area of Nantong, China. By comparing the results of the proposed method and run-off-road (ROR) crash data from 2015–2016 in the study area, the road segments with higher safety risk levels identified by the proposed method were found to be statistically significantly correlated with higher crash severity based on the crash data. In addition, by comparing the respective results evaluated by eight factors and seven factors (a new factor removed), we also found that access point density significantly contributed to the safety risk of rural roadsides. These results show that the proposed method can be considered as a low-cost solution to evaluating the safety risk of rural roadsides with relatively high accuracy, especially for areas with large rural road networks and incomplete ROR crash data due to budget limitation, human errors, negligence, or inconsistent crash recordings.


Complexity ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-15 ◽  
Author(s):  
Tinggui Chen ◽  
Shiwen Wu ◽  
Jianjun Yang ◽  
Guodong Cong ◽  
Gongfa Li

It is common that many roads in disaster areas are damaged and obstructed after sudden-onset disasters. The phenomenon often comes with escalated traffic deterioration that raises the time and cost of emergency supply scheduling. Fortunately, repairing road network will shorten the time of in-transit distribution. In this paper, according to the characteristics of emergency supplies distribution, an emergency supply scheduling model based on multiple warehouses and stricken locations is constructed to deal with the failure of part of road networks in the early postdisaster phase. The detailed process is as follows. When part of the road networks fail, we firstly determine whether to repair the damaged road networks, and then a model of reliable emergency supply scheduling based on bi-level programming is proposed. Subsequently, an improved artificial bee colony algorithm is presented to solve the problem mentioned above. Finally, through a case study, the effectiveness and efficiency of the proposed model and algorithm are verified.


Author(s):  
Jens Alm ◽  
Alexander Paulsson ◽  
Robert Jonsson

There is a growing maintenance debt of ageing and critical infrastructures in many municipalities in European welfare states. In this article, we use the multidimensional concept of local capacity as a point of departure to analyse how and in what ways Swedish municipalities work with the routine maintenance of infrastructures, including municipal road networks as well as water and sewage systems. For the road networks, maintenance is generally outsourced to contractors and there is also a large degree of tolerance for various standards on different road segments within and between the municipalities. Less used road segments are not as prioritised as those with heavy traffic. For the water and sewage systems, in-house technical capacity is needed as differences in water quality are not tolerated. Economies of scale mean that in-house capacity is translated into the creation of inter-municipal bodies. As different forms of capacities tend to reinforce each other, municipal capacity builds up over time in circular movements. These results add knowledge to current research by pointing to the ways municipalities are overcoming a run-to-failure mentality by building capacity to pay off the infrastructural maintenance debt.


Entropy ◽  
2021 ◽  
Vol 23 (3) ◽  
pp. 378
Author(s):  
Taeyong Kwon ◽  
Seongsim Yoon ◽  
Sanghoo Yoon

Uncertainty in the rainfall network can lead to mistakes in dam operation. Sudden increases in dam water levels due to rainfall uncertainty are a high disaster risk. In order to prevent these losses, it is necessary to configure an appropriate rainfall network that can effectively reflect the characteristics of the watershed. In this study, conditional entropy was used to calculate the uncertainty of the watershed using rainfall and radar data observed from 2018 to 2019 in the Goesan Dam and Hwacheon Dam watersheds. The results identified radar data suitable for the characteristics of the watershed and proposed a site for an additional rainfall gauge. It is also necessary to select the location of the additional rainfall gauged by limiting the points where smooth movement and installation, for example crossing national borders, are difficult. The proposed site emphasized accessibility and usability by leveraging road information and selecting a radar grid near the road. As a practice result, the uncertainty of precipitation in the Goesan and Hwacheon Dam watersheds could be decreased by 70.0% and 67.9%, respectively, when four and three additional gauge sites were installed without any restriction. When these were installed near to the road, with five and four additional gauge sites, the uncertainty in the Goesan Dam and Hwacheon Dam watersheds were reduced by up to 71.1%. Therefore, due to the high degree of uncertainty, it is necessary to measure precipitation. The operation of the rainfall gauge can provide a smooth site and configure an appropriate monitoring network.


2018 ◽  
Vol 7 (12) ◽  
pp. 472 ◽  
Author(s):  
Bo Wan ◽  
Lin Yang ◽  
Shunping Zhou ◽  
Run Wang ◽  
Dezhi Wang ◽  
...  

The road-network matching method is an effective tool for map integration, fusion, and update. Due to the complexity of road networks in the real world, matching methods often contain a series of complicated processes to identify homonymous roads and deal with their intricate relationship. However, traditional road-network matching algorithms, which are mainly central processing unit (CPU)-based approaches, may have performance bottleneck problems when facing big data. We developed a particle-swarm optimization (PSO)-based parallel road-network matching method on graphics-processing unit (GPU). Based on the characteristics of the two main stages (similarity computation and matching-relationship identification), data-partition and task-partition strategies were utilized, respectively, to fully use GPU threads. Experiments were conducted on datasets with 14 different scales. Results indicate that the parallel PSO-based matching algorithm (PSOM) could correctly identify most matching relationships with an average accuracy of 84.44%, which was at the same level as the accuracy of a benchmark—the probability-relaxation-matching (PRM) method. The PSOM approach significantly reduced the road-network matching time in dealing with large amounts of data in comparison with the PRM method. This paper provides a common parallel algorithm framework for road-network matching algorithms and contributes to integration and update of large-scale road-networks.


2011 ◽  
Vol 2011 ◽  
pp. 1-8 ◽  
Author(s):  
M. Marchetti ◽  
M. Moutton ◽  
S. Ludwig ◽  
L. Ibos ◽  
V. Feuillet ◽  
...  

Thermal mapping has been implemented since the late eighties to establish the susceptibility of road networks to ice occurrence with measurements from a radiometer and some atmospheric parameters. They are usually done before dawn during wintertime when the road energy is dissipated. The objective of this study was to establish if an infrared camera could improve the determination of ice road susceptibility, to build a new winter risk index, to improve the measurements rate, and to analyze its consistency with seasons and infrastructures environment. Data analysis obtained from the conventional approved radiometer sensing technique and the infrared camera has shown great similarities. A comparison was made with promising perspectives. The measurement rate to analyse a given road network could be increased by a factor two.


2013 ◽  
Vol 357-360 ◽  
pp. 2720-2725
Author(s):  
Hsi Sung Wang ◽  
Shu Shun Liu

The research objective is to support the maintenance unit with route planning prior to performing road inspection, the model is based on VRP problem settings, and with the addition of compulsory road sections and allowing shortcuts through small pathways during the inspection to reduce time consumption. By employing Constraint Programming (CP) technology and optimization solution mechanism to construct inspection scheduling model, and the objective is to minimize time consumption of the road inspection. The province and county roads in Douliou city are chosen as examples for analysis, plans out best routes for inspection process, and also displays all the road sections passed by inspection vehicle. Thus this model can be used as reference to support the authorities to efficiently allocate resources for the inspection process, and achieve the objective as shorten the inspection time consumption.


2000 ◽  
Vol 1712 (1) ◽  
pp. 196-201 ◽  
Author(s):  
Jin-Fang Shr ◽  
Benjamin P. Thompson ◽  
Jeffrey S. Russell ◽  
Bin Ran ◽  
H. Ping Tserng

An increasing number of state highway agencies (SHAs) are using A (cost) + B (time cost) bidding ( A + B bidding) for highway construction. The A + B bidding concept is designed to shorten the total contract time by allowing each contractor to bid the number of days in which the work can be accomplished, in addition to the traditional cost bid. The SHA is then presented with the problem of determining a reasonable range of contract time submitted by the bidders. Most SHAs do not currently restrict the range of B. However, several problems may arise from an unrestricted range of B. First, if no minimum is set for B, a bidder may inflate the cost bid and submit an unreasonably low B, using the excess cost bid to cover the disincentives charged for exceeding the time bid. Second, if no maximum is set for B, then a bidder with a high B and a low-cost bid may be awarded the job and make an unreasonable amount of money from incentive payments. This study develops a quantified model of the price-time bidding contract. A construction cost-versus-time curve is developed from Florida Department of Transportation (DOT) data. The contractor’s price-versus-time curve is then combined with the road-user cost to determine the optimum lower limit to be set on B. Finally, several projects completed by the Florida DOT will be used to illustrate this model.


2021 ◽  
Vol 2021 (23) ◽  
pp. 20-30
Author(s):  
Taras Pechonchyk ◽  
◽  
Vitaliy Ivanchenko ◽  

AbstractIntroduction. Effective management of road indstry is particularly important in conditions of limited funding, as it is not possible to provide adequate funding of the economic entity that has the functions of a customer service. The cost of the customer service maintenance depends directly on the compliance with applicable regulations for these works cost determination. One of the aspects that form a considerable part of the costs of customer service is the maintenance of service vehicles.Problem Statement. Road services in the regions (hereinafter RSR) are the recipients and managers of the funds from the State Budget of Ukraine that are directed for the development and maintenance of public roads of state importance, being as well the asset holders of these roads. To perform their functions, the RSR have vehicles on their balance, the use of which involves a number of costs, including fuel and lubricants, repair, maintenance, replacement of tires, etc. The most important of the steps involved in setting the costs of vehicle maintenance is the process of cost planning. Planning has to be based on the structure of the vehicle fleet (own or leased), functional responsibilities and scope of road works.Planning is carried out for vehicles on the balance of the RSR, as well as for leased vehicles. In the case of leasing, the costs mentioned above are added by the vehicles leasing costs. These costs must be forecasted, justified and performed within the approved cost estimates of the customer service expenses.Purpose. The purpose of the article is to highlight the theoretical and methodological approaches to the calculation of planned costs for the maintenance of service vehicles of the road works customer.Materials and methods. Dialectical methods of knowledge, such as analysis and synthesis of fleet composition characteristics and approaches to cost planning methods, as well as induction, were used in writing the article to explore some aspects of the process of calculating the planned cost of maintenance of the road works customer's service vehicles.Results. The study highlights and describes the main approaches to the calculation of planned costs for the maintenance of service vehicles of the road works customer. The methodology of calculation of planned costs for the maintenance of service vehicles is explored.Conclusions. The introduction of a clear methodology and analytical toolkit for calculating all necessary expenditure items for the maintenance of the road works customer's vehicles in the cost planning process will establish the implementation of a clear mechanism for calculating the planned costs of maintenance of the road works customer's vehicles. It will also provide an automated information-analytical complex for planning of cost estimates, with information entry and reporting in standard forms and possibility of prompt response to changes in fleet composition, needs for spare parts, repairs or other expenses for the maintenance of service vehicles and making changes in cost estimates.Keywords: motor vehicles, costs, cost planning, customer service, maintenance of service vehicles