Plug Power supports increase in MEA-production demand with facility expansion in Rochester, NY

2019 ◽  
Vol 2019 (11) ◽  
pp. 3-4
2017 ◽  
Vol 1 (2) ◽  
pp. 131-136 ◽  
Author(s):  
Deni Apriadi ◽  
Arie Yandi Saputra

The agricultural sector has an important role in supporting the Indonesian economy. But on the other hand, sometimes many community groups do not benefit due to problems that arise because the distribution chain of agricultural products are long enough, especially for farmers and consumers (end users). Of course the situation must be improved, so that the agricultural products of Indonesia can be enjoyed by consumers or farmers with proper. One of its efforts is by establishing an e-commerce based e-commerce system in agriculture. E-commerce based ecommerce system can be used as an alternative for farmers, used as a media campaign, communication and information and can cut the distribution chain of agricultural products marketing. The benefits felt by farmers and consumers directly and indirectly give a positive influence, especially from the broader marketing channels of agricultural products can increase production demand and spur the procurement of production among farmers and also the price offered to consumers will be cheaper so that sales in agricultural products can be more increased and profitable for farmers


1974 ◽  
Vol 14 (01) ◽  
pp. 44-54 ◽  
Author(s):  
Gary W. Rosenwald ◽  
Don W. Green

Abstract This paper presents a mathematical modeling procedure for determining the optimum locations of procedure for determining the optimum locations of wells in an underground reservoir. It is assumed that there is a specified production-demand vs time relationship for the reservoir under study. Several possible sites for new wells are also designated. possible sites for new wells are also designated. The well optimization technique will then select, from among those wellsites available, the locations of a specified number of wells and determine the proper sequencing of flow rates from Those wells so proper sequencing of flow rates from Those wells so that the difference between the production-demand curve and the flow curve actually attained is minimized. The method uses a branch-and-bound mixed-integer program (BBMIP) in conjunction with a mathematical reservoir model. The calculation with the BBMIP is dependent upon the application of superposition to the results from the mathematical reservoir model.This technique is applied to two different types of reservoirs. In the first, it is used for locating wells in a hypothetical groundwater system, which is described by a linear mathematical model. The second application of the method is to a nonlinear problem, a gas storage reservoir. A single-phase problem, a gas storage reservoir. A single-phase gas reservoir mathematical model is used for this purpose. Because of the nonlinearity of gas flow, purpose. Because of the nonlinearity of gas flow, superposition is not strictly applicable and the technique is only approximate. Introduction For many years, members of the petroleum industry and those concerned with groundwater hydrology have been developing mathematical reservoir modeling techniques. Through multiple runs of a reservoir simulator, various production schemes or development possibilities may be evaluated and their relative merits may be considered; i.e., reservoir simulators can be used to "optimize" reservoir development and production. Formal optimization techniques offer potential savings in the time and costs of making reservoir calculations compared with the generally used trial-and-error approach and, under proper conditions, can assure that the calculations will lead to a true optimum.This work is an extension of the application of models to the optimization of reservoir development. Given a reservoir, a designated production demand for the reservoir, and a number of possible sites for wells, the problem is to determine which of those sites would be the best locations for a specified number of new wells so that the production-demand curve is met as closely as possible. Normally, fewer wells are to be drilled than there are sites available. Thus, the question is, given n possible locations, at which of those locations should n wells be drilled, where n is less than n? A second problem, that of determining the optimum relative problem, that of determining the optimum relative flow rates of present and future wells is also considered. The problem is attacked through the simultaneous use of a reservoir simulator and a mixed-integer programming technique.There have been several reported studies concerned with be use of mathematical models to select new wells in gas storage or producing fields. Generally, the approach has been to use a trial-and-error method in which different well locations are assumed. A mathematical model is applied to simulate reservoir behavior under the different postulated conditions, and then the alternatives are postulated conditions, and then the alternatives are compared. Methods that evaluate every potential site have also been considered.Henderson et al. used a trial-and-error procedure with a mathematical model to locate new wells in an existing gas storage reservoir. At the same time they searched for the operational stratagem that would yield the desired withdrawal rates. In the reservoir that they studied, they found that the best results were obtained by locating new wells in the low-deliverability parts of the reservoir, attempting to maximize the distance between wells, and turning the wells on in groups, with the low-delivery wells turned on first.Coats suggested a multiple trial method for determining well locations for a producing field. SPEJ P. 44


2018 ◽  
pp. 66-93
Author(s):  
Rezvan Rafiei ◽  
Mustapha Nourelfath ◽  
Jonathan Gaudreault ◽  
Luis Antonio De Santa-Eulalia ◽  
Mathieu Bouchard

2021 ◽  
Vol 1 (3) ◽  
pp. 1-9
Author(s):  
O. Ariunaa ◽  
T. Erdenenzorig ◽  
B. Dondov

Our country has provided about 52% of vegetables from domestic production, the rest part imported others from outside. Thus, imports of potatoes and vegetables have been reduced last year, for this reason, main vegetable seeds, were produced domestically and provided over 80 percent of the country’s demand. In the future domestic production demand of vegetable goal set working to provide by 100 percent from government our country in this connection issues urgent need to solve sowing seeds, variety supply, seed production, and plant protection. According to our research, during the growing season, 150-350 weeds growing per 1m2 of rounded onions shows that the amount of crop damage is relatively high. For the purpose of control against weeds in the onion field with 3 repetitions of 7 variants of 2 types of herbicides are conducted experimental research. These include; pre-emergent Estamp (Stomp) herbicide applied in doses 2.5; 3.5 l/ha that controls all types of weeds, but showed results of 65.2-72.4%. The growing season during a selective post-emergent of Gaur herbicide in doses 0.7; 0.9l/ ha used against broadleaf and grassy weeds that became clear of weed species density reduced by 92.7-93.4%. It was tested in this study Pendimethalin, 33% + Oxyfluorfen 24 % mixture herbicides have reduced the number of weeds by 92.4-94.1%.


Ports 2016 ◽  
2016 ◽  
Author(s):  
Kelly M. Jacobson ◽  
Jonathan E. Thomas ◽  
William J. Bohlen ◽  
Jason Hull ◽  
Joshua L. Martinez
Keyword(s):  

1931 ◽  
Vol 13 (4) ◽  
pp. 639
Author(s):  
Geoffrey S. Shepherd
Keyword(s):  

Author(s):  
Matt Clark

Olmsted County is currently expanding their existing waste-to-energy facility in Rochester, Minnesota to add a third mass burn waste combustor. The new unit will have a capacity of 200 TPD, effectively doubling the size of the existing capacity. This paper will discuss some of the unique aspects of this project and review the current status. Some of the interesting and unique features to be discussed include: 1. Environmental Permitting – The county decided to do a voluntary EIS. 2. Project approach – The county is using a Construction Manager at Risk approach for construction of the facility. 3. Engineering – The engineering scope includes several separate procurements of major equipment packages, balance of plant design and several auxiliary projects related to the ‘utility’ system. 4. Operator Collaboration – Olmsted County is one of a few public owners that operate their facility. Their knowledge of the existing facility and of operating a mass burn facility has been used extensively in the planning and design of the new unit.


Author(s):  
Thomas M. Henderson ◽  
Leah K. Richter

Palm Beach County (Florida) Solid Waste Authority built an integrated solid waste management system in the 1980s and 1990s around an 1,800 tpd Refuse Derived Fuel (RDF) Waste-to-Energy (WTE) facility. The system included a network of five regional transfer stations, Subtitle D sanitary landfill, recovered materials processing facility, composting facility, metals processing facility and household hazardous waste collection program. The WTE, which became operational in 1989, was built with two 900 tpd RDF combustion units. Space was provided for the addition of a third combustion unit, a second turbine-generator and an extra flue was installed in the facility’s stack. By 2004, the WTE was fifteen years old. It had been running at over 125% availability and well above its nominal capacity for almost a decade. Landfill capacity was being consumed at a rate which would see it filled in less than 20 years. The County had been hit with repeated hurricanes in recent years and the County’s population was continuing to grow making landfill capacity projections far from certain. The Authority began an assessment of its long term capacity options which included renovation of its existing WTE facility, expansion of that facility, development of a new WTE facility, development of a new Subtitle D Landfill and several out-of-county options. This paper will focus on the results of this assessment with emphasis on the current efforts to develop a new Mass Burn WTE facility with a capacity of 3,000 tpd and a commercial operations date of 2015. It will be the largest new WTE built in North America in more than 20 years. The choice of Mass Burn technology, facility and combustion module sizing, air pollution control technology, facility site selection, environmental permitting, public outreach program, project financing and procurement and contracting approach will be discussed.


Sign in / Sign up

Export Citation Format

Share Document