Analysis on rock burst danger when fully-mechanized caving coal face passed fault with deep mining

2012 ◽  
Vol 50 (4) ◽  
pp. 645-648 ◽  
Author(s):  
Xuehua Chen ◽  
Weiqing Li ◽  
Xianyang Yan
Keyword(s):  
2013 ◽  
Vol 448-453 ◽  
pp. 3859-3862
Author(s):  
Yong Mei

To prevent threaten of impact disaster, high-pressure water is injected into coal face, which is most widely used in impact-type mine. In such cases, by analyzing the rock burst tendency of a particular type of deep mining pit and occurrence of the mining process, rock samples drilled from the coal mine were taken for the conventional mechanical properties test and rock burst tendency test respectively under dry and wet state. Cuttings volume indicator affected by injection has been optimized to improve the prediction sensitivity. "One shift anti-impact, two-shift production "patterns labor organization model, adjusted development system layout and cut drilling index optimizations, as well as the allocation of high-pressure water injection drilling means, greatly improving the water injection effect, which probably provide a reference for similar mines to safe and efficiently mining.


2016 ◽  
Vol 26 (6) ◽  
pp. 1125-1133 ◽  
Author(s):  
Xuehua Li ◽  
Fan Pan ◽  
Huaizhen Li ◽  
Min Zhao ◽  
Lingxiao Ding ◽  
...  
Keyword(s):  

2019 ◽  
Vol 2019 ◽  
pp. 1-16 ◽  
Author(s):  
Zhimin Xiao ◽  
Jun Liu ◽  
Shitan Gu ◽  
Mingqing Liu ◽  
Futian Zhao ◽  
...  

Roadway floor rock burst is an important manifestation of rock bursts in deeply buried mines. With the increase of mining depth and mining intensity, rock burst disasters in the roadway floor such as floor heaves are becoming more serious. The article investigated the roadway floor severe heave caused by floor rock burst during excavation of the No. 3401 working face, which was controlled by an anticlinal structure and deep mining in Shandong Mine, China. Firstly, by analyzing geological conditions of the working face, roadway support parameters, and characteristics of coal and rock, it was revealed that high tectonic stress and high crustal stress were main causes of the floor rock burst. Secondly, based on the Theory of Mechanics and Theory of Energy, the energy conversion process in the roadway floor was discussed, and the rock burst condition caused by elastic energy in the roadway floor was analyzed. The failure characteristics of roadway-surrounding rock were also inspected, using a borehole recorder. The roof and sidewalls of roadway mainly contained fissures and cracks, whereas cracks and broken areas are distributed in the roadway floor. Finally, based on the deformation and failure characteristics of roadway-surrounding rock, a method termed “overbreaking-bolting and grouting-backfill” was proposed to control roadway floor rock burst. The method was tested in the field, and the results showed that it could effectively control the deformation of roadway floor and rock burst, guaranteeing the stability of roadway floor. This impact control method for the roadway floor can provide a reference for the prevention and control of roadway rock burst in mines with similar geological conditions.


2014 ◽  
Vol 522-524 ◽  
pp. 1371-1376
Author(s):  
Zhu Peng Jin ◽  
Tao Qin ◽  
Zhen Wen Liu

For occurring frequent thin seam rock burst disasters in deep mining stage in Xinxing Mine, through summarizing the mineral basic geological and mining conditions, on this basis, analysing the occurrence characteristics of rock burst with statistical method in Xinxing Mine, analyzing the inducing factors of thin seam rock burst, and through FLAC3D roadways along on 41,051 workface exploitation right beside left stacks of rock burst was simulated, and made a rock burst prevention focus for the impact of land pressure control system provides an effective basis. On thin hard coal burst prevention of important guiding significance.


Sign in / Sign up

Export Citation Format

Share Document