A thematic review on Prevention through design (PtD) concept application in the construction industry of developing countries

2022 ◽  
Vol 148 ◽  
pp. 105640
Author(s):  
Nor Syamimi Samsudin ◽  
Mazlina Zaira Mohammad ◽  
Natasha Khalil ◽  
Nur Dalila Nadzri ◽  
Che Khairil Izam Che Ibrahim
Author(s):  
B. C. Roy ◽  
Sumit Wagh

<p>Globalization is shrinking the world in many senses, but at the rates at which it is happening in various countries is different depending on where any country is situated on the scale of development; however, in construction industry, the level of globalization is much lower than in other segments of the economy, across most of the countries. True and the desired level of globalization can be achieved only when the design and construction practices are globally harmonized but adopting context-specific customization to accommodate the genius of each country. This paper aims to promote such diversity in unity. The global construction industry will be the biggest beneficiary of such a globalizing movement. World has faced several crises in different countries due to many reasons like war, terrorism, bad governance, which is leading to unemployment even among highly capable engineers. A globalized environment in construction would leverage global talent despite such adverse socio-political and environmental differences. Cost-optimization is likely to take on a different meaning, gaining a wider level of acceptability across the globe.</p>


2018 ◽  
pp. 1706-1735

We have argued in Chapters 1-3 that the construction industry in developing countries is dominated by the strong presence of SMEs and “jobbers”. The informal sector workers constitute the essential provider of human resources construction industry. So far, the weaknesses of the construction industry in developing countries have been identified. As a result, various decision models were proposed for largely improving labor cost management and scheduling (time) with the aim of improving productivity. In a single volume like this, it is unrealistic to cover all aspects to improve performance. This chapter will now provide ideas on how quality of projects can also be improved so as to maintain a balance between cost, time and quality. Furthermore, the management of onsite workshops that can lead to construction productivity will be examined.


2021 ◽  
pp. 15-50
Author(s):  
Douglas Aghimien ◽  
Clinton Aigbavboa ◽  
Ayodeji Oke ◽  
Wellington Thwala

2020 ◽  
Vol 25 (2) ◽  
pp. 201-223
Author(s):  
Abdulmalik Sa'eed ◽  
Nuru Gambo ◽  
Ibrahim Ibrahim Inuwa ◽  
Innocent Musonda

Purpose The purpose of this study is to assess the effects of financial management practices of small-scale building contractors on the technical performance of the contractors in the northern part of Nigeria with international best practices. Previous studies argued that the technical performance of small-scale building contractors in developing countries is poor because of insufficient cash to acquire strategic resources at the outset of a project. This continues to pose a challenge to the sustainable development of the construction industry, particularly in developing countries like Nigeria. There is, therefore, a need to identify, assess and compare the effects of financial practices of the contractors with technical performance best practices. Design/methodology/approach The technical performance of each contractor was evaluated using a five-point Likert scale. This is used to obtain the mean technical performance levels of the contractors. A questionnaire survey was administered to the professionals in the industry who were selected by using a proportionate stratified random sampling technique. The contractors’ performance was compared using ANOVA with post hoc, and the effects of contractors’ financial management practices were determined using multiple regression analysis. Findings The results of this study indicated that the contractors in Nigeria were average technical performers and there were large effects of financial management practices on the technical performance of contractors in building projects. Research limitations/implications This study is limited to small-scale building contractors in northeast Nigeria. One of the implications of this study is that it provides the criteria for an evaluation of small-scale building contractors’ technical performance in Nigeria and other developing countries that faced similar problems. Practical implications The practical implications of this study are that it establishes the current level of contractors' technical performance and serves as an awareness of contractors' current financial practices. Social implications This study created bases for self-evaluation of contractors’ technical performance and competition among small-scale contractors in Nigeria for the enhancement of productivity particularly in rural areas for national development. Originality/value This study emanated from the government reports and past studies in the area of performance management based on the persistence of poor technical performance of small-scale contractors in the construction industry.


1994 ◽  
Vol 22 (6) ◽  
pp. 325-331 ◽  
Author(s):  
P. F. Kaming ◽  
P. O. Olomolaiye ◽  
P. Corbett ◽  
F. C. Harris

2016 ◽  
Vol 23 (5) ◽  
pp. 588-609 ◽  
Author(s):  
Nuru Gambo ◽  
Ilias Said ◽  
Radzi Ismail

Purpose The purpose of this paper is to compare the performance levels of small scale local government contractors (SSLGCs) in northern part of Nigeria with international practice. Previous studies focused attention primarily on benchmarking the performance of contractors, but were mostly conceptual rather than from empirical findings. This continuous to pose a challenge to the sustainable development of the construction industry, particularly, in developing countries like Nigeria. There is therefore a need to identify, assess and compare performance practice levels of small scale contractors. Design/methodology/approach The performance of each contractor was evaluated using a five-point Likert scale used in obtaining mean performance levels in respect to three classes of performance practices. A questionnaire survey was administered to major parties in the industry; clients, contractors and consultants who were selected by using a proportionate stratified random sampling technique. The contractors’ performance was compared by using ANOVA with post hoc. Findings The results indicated that the SSLGCs in Nigeria were average performers and there were effects and differences among the various contractors’ levels of performance with international practice. Research limitations/implications The study is limited to SSLGCs in northern part of Nigeria. Practical implications The study provided the criteria for evaluation of SSLGCs’ performance in Nigeria and other developing countries that faced similar problems. Social implications The study created bases for self-evaluation and competition among small scale contractors in Nigeria for the enhancement of productivity particularly in rural areas and general national development. Originality/value This study emanated from the governmental reports and past researches in the area of performance management on the persistence of the poor performance of small scale contractors in construction industry.


Author(s):  
Yutian Chen ◽  
Oswald Chong

The Chinese Construction Industry (CCI) has become one of the largest in the world within the last 20 years. However, due to its rapid growth it has been experiencing issues causing the industry to struggle with delivering high performing projects. Due to the differences between developed and developing countries construction industries, research from other developing countries that were similar to China (Vietnam and Kingdom of Saudi Arabia) were used to help identify solutions to improve the CCI. Previous research has identified the major risks in Vietnam and Saudi Arabia. It has also been identified the only solution that has documented evidence that it can improve construction performance is the Best Value Approach that was developed in the United States at Arizona State University. A literature research was performed identifying the major risks and issues that have been documented in the CCI. These risks were then compared to that of the Vietnam and Kingdom of Saudi Arabia’s construction industry risks. It was identified that the majority of the top risks were similar in all three countries. Identifying that developing countries have been experiencing the same issues. This also identifies that the Best Value Approach might be a solution to help improve the CCI.


2020 ◽  
Vol 10 (1) ◽  
pp. 5237-5241 ◽  
Author(s):  
P. T. Nguyen ◽  
P. C. Nguyen

The constant demand for construction in developing countries like Vietnam causes more and more challenges and difficulties to Project Management Units (PMUs) in carrying projects to completion on schedule, with quality assurance and fewer costs. In order to do this, PMUs need to have better and tighter management tools and forms. However, in order to minimize risks during project implementation, the binding terms in contracts are also becoming stricter with more and more new forms of contracts. One of them is the design-build (DB) contract form. This paper presents the critical risk factors for design-build projects in the construction industry. Good identification and management of these risk factors will help projects succeed and will increase the confidence of owners and contractors who seek to use the design-build form.


2021 ◽  
Vol 21 (2) ◽  
Author(s):  
Chau Ngoc Dang ◽  
Long Le-Hoai ◽  
Vachara Peansupap

The construction industry should seek to enrich its workforces due to the increasing lack of trained and skilled employees. This study attempts to investigate the relationship between encouragement-based management mechanism (EMM) and manpower development (MD) in construction firms and examine the moderating effect of firm size on this relationship by conducting bivariate Pearson correlation and hierarchical multiple regression analyses to analyse empirical data collected from 79 construction firms in Vietnam. The results show that EMM positively affected MD, and this positive effect was stronger in small/medium-sized construction firms than in large firms. The findings could provide construction firms in Vietnam, as well as other developing countries, with a better understanding of the effect of EMM on MD. Hence, they could establish appropriate and wise encouragement-based strategies to enhance their manpower. This study could contribute to the extant literature on construction manpower development by providing empirical evidence of the EMM−MD relationship in the context of construction firms.


Sign in / Sign up

Export Citation Format

Share Document