Comparing the levels of performance of small scale local government contractors in Northern Nigeria with international practice

2016 ◽  
Vol 23 (5) ◽  
pp. 588-609 ◽  
Author(s):  
Nuru Gambo ◽  
Ilias Said ◽  
Radzi Ismail

Purpose The purpose of this paper is to compare the performance levels of small scale local government contractors (SSLGCs) in northern part of Nigeria with international practice. Previous studies focused attention primarily on benchmarking the performance of contractors, but were mostly conceptual rather than from empirical findings. This continuous to pose a challenge to the sustainable development of the construction industry, particularly, in developing countries like Nigeria. There is therefore a need to identify, assess and compare performance practice levels of small scale contractors. Design/methodology/approach The performance of each contractor was evaluated using a five-point Likert scale used in obtaining mean performance levels in respect to three classes of performance practices. A questionnaire survey was administered to major parties in the industry; clients, contractors and consultants who were selected by using a proportionate stratified random sampling technique. The contractors’ performance was compared by using ANOVA with post hoc. Findings The results indicated that the SSLGCs in Nigeria were average performers and there were effects and differences among the various contractors’ levels of performance with international practice. Research limitations/implications The study is limited to SSLGCs in northern part of Nigeria. Practical implications The study provided the criteria for evaluation of SSLGCs’ performance in Nigeria and other developing countries that faced similar problems. Social implications The study created bases for self-evaluation and competition among small scale contractors in Nigeria for the enhancement of productivity particularly in rural areas and general national development. Originality/value This study emanated from the governmental reports and past researches in the area of performance management on the persistence of the poor performance of small scale contractors in construction industry.

2018 ◽  
Vol 25 (1) ◽  
pp. 357-372 ◽  
Author(s):  
Joseph Asante ◽  
Ernest Kissi ◽  
Edward Badu

Purpose The needs assessment is the heart of any capacity-building strategy since it determines the design of any intervention, and also helps to prioritise the allocation of resources. Whereas there is a considerable amount of literature on the challenges faced by small- and medium-scale building contractors (SMBCs), very little is known about the needs (support) required by SMBCs. But given the critical role played by SMBCs in the construction industry demands, an understanding of how this sector can be assisted is required. The purpose of this paper is to contribute to the literature relative to capacity building of SMBCs by exploring and examining the needs with the objective to extend the understanding on how to promote and sustain SMBCs to continue their infrastructural delivery at the local and rural areas in Ghana. Design/methodology/approach A questionnaire with five-point Likert scale is administered to 416 respondents, including local government authorities, consultants, first-class contractors and SMBCs using simple random and purposive sampling techniques. Data generated from the survey are analysed using mean score ranking and principal component analysis, thus enabling the findings of the study to be examined under six thematic areas. Findings The SMCs needs identified include anti-corruption measures, job accessibility, technical and technological assistance, favourable fiscal policy, business development support and financial assistance. The findings of the study bring to the attention of policy makers the critical areas that required support by the assistance of SMBCs. In the interim, the study recommends the extension of business advisory services to the SMBCs by National Board of Small-Scale Industries, whilst in the long term, the government must create the necessary business operating environment to promote SMBCs pertaining to the industrial sector of the economy. The SMBCs must also factor the needs into their business operations that can be addressed from within. Originality/value The study suggests the need of SMBCs in building a robust construction industry in developing countries.


2020 ◽  
Vol 25 (2) ◽  
pp. 201-223
Author(s):  
Abdulmalik Sa'eed ◽  
Nuru Gambo ◽  
Ibrahim Ibrahim Inuwa ◽  
Innocent Musonda

Purpose The purpose of this study is to assess the effects of financial management practices of small-scale building contractors on the technical performance of the contractors in the northern part of Nigeria with international best practices. Previous studies argued that the technical performance of small-scale building contractors in developing countries is poor because of insufficient cash to acquire strategic resources at the outset of a project. This continues to pose a challenge to the sustainable development of the construction industry, particularly in developing countries like Nigeria. There is, therefore, a need to identify, assess and compare the effects of financial practices of the contractors with technical performance best practices. Design/methodology/approach The technical performance of each contractor was evaluated using a five-point Likert scale. This is used to obtain the mean technical performance levels of the contractors. A questionnaire survey was administered to the professionals in the industry who were selected by using a proportionate stratified random sampling technique. The contractors’ performance was compared using ANOVA with post hoc, and the effects of contractors’ financial management practices were determined using multiple regression analysis. Findings The results of this study indicated that the contractors in Nigeria were average technical performers and there were large effects of financial management practices on the technical performance of contractors in building projects. Research limitations/implications This study is limited to small-scale building contractors in northeast Nigeria. One of the implications of this study is that it provides the criteria for an evaluation of small-scale building contractors’ technical performance in Nigeria and other developing countries that faced similar problems. Practical implications The practical implications of this study are that it establishes the current level of contractors' technical performance and serves as an awareness of contractors' current financial practices. Social implications This study created bases for self-evaluation of contractors’ technical performance and competition among small-scale contractors in Nigeria for the enhancement of productivity particularly in rural areas for national development. Originality/value This study emanated from the government reports and past studies in the area of performance management based on the persistence of poor technical performance of small-scale contractors in the construction industry.


2022 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Hashim Ibrahimkhil ◽  
Laith Hadidi

PurposeThe aim of this paper is to assess the safety level of construction sites in Afghanistan following the US Army Corps of Engineers (USACE) safety practices and compare this with other construction sites in Afghanistan that follow local government safety guidelines. The USACE oversees and funds many infrastructure projects in Afghanistan, and these projects are supposed to follow the same standards implemented in the USA, including safety standards. The local government of Afghanistan also funds infrastructure projects in Afghanistan; however, these do not follow USACE best practices. This research explores the question of whether the USACE standards provide a safer construction site. The effect of the USACE standards on safety practices in construction projects is also investigated in the Afghanistan construction industry.Design/methodology/approachA literature review and other safety checklists were used to develop a safety checklist containing 104 items (questions) in 17 categories. Subsequently, the checklist was used to assess the safety performance of 57 construction projects (25 USACE projects, and 32 governmental projects). Utilizing quantitative analysis, the Spearman rank correlation coefficient (Rho) and Mann–Whitney tests were carried out for correlation and statistical disparity between USACE and governmental projects.FindingsThe safety performance level of Afghan government projects was found to be poor in relation to other developing countries, while in USACE projects it was excellent. In addition, fire prevention, safety administration, PPE, heavy equipment, and handling and storage of materials for all types of contractors were the most overlooked aspects of Afghan Government projects.Practical implicationsThe findings clearly demonstrate the deficiencies in construction sites observed during this study and also support the adoption of USACE standards in Afghanistan projects.Originality/valueTo the best of the authors’ knowledge, this study is the first to investigate the safety of construction sites in Afghanistan. The study also demonstrates the benefits of adopting international standards (USACE) to improve the safety of construction sites in a developing country such as Afghanistan. The findings provide evidence of the safety of the Afghanistan construction industry compared to other developing countries. These findings will contribute to the Afghan Government's efforts to track injury statistics.


Author(s):  
Nunzio Angiola ◽  
Piervito Bianchi ◽  
Letizia Damato

Purpose Considering a micro performance perspective, the purpose of this paper is to analyze whether and to what extent the adoption of better performance management systems could improve the performance levels of a public university. Design/methodology/approach With reference to a period of four years (2011-2014), the quality of performance management systems of 29 Italian universities (response rate: 48 percent) was examined and the possible effects on performance levels of these institutions were analyzed by means of statistical methodologies (multiple regression analysis). Outcome indicators were considered. Findings The findings indicate the need to go further “measurement,” and to take care of performance “management,” especially in complex organizations as universities, where academicians identify themselves more with their professions than with the organization and where technicians and administrative employees might look at the performance-based reform with “bureaucratic eyes.” A fruitful cooperation between the professional soul and the bureaucratic one is paramount. Originality/value Studies which analyze organizational factors that could affect the adoption and implementation of performance management systems are rare, and use in prevalence qualitative methods or refer to machine bureaucracies, not many to professional ones as public universities. Moreover, the performance management literature in a public university context deepens the topic of the selection of KPIs and the focus is mainly on macro performance or on management tools for gathering and analyzing performance measures.


2018 ◽  
Vol 25 (6) ◽  
pp. 1921-1934 ◽  
Author(s):  
Fei Ying ◽  
John Tookey ◽  
Jeff Seadon

PurposeConstruction logistics is an essential part of Construction Supply Chain Management for both project management and cost aspects. The quantum of money that is embodied in the transportation of materials to site could be 39–58 per cent of total logistics costs and between 4 and 10 per cent of the product selling price for many firms. However, limited attention has been paid to measure the logistics performance at the operational level in the construction industry. The purpose of this paper is to contribute to the knowledge about managing logistics costs by setting a key performance indicator (KPI) based on the number of vehicle movements to the construction site.Design/methodology/approachA case study approach was adopted with on-site observations and interviews. Observations were performed from the start of construction until “hand-over” to the building owner. A selection of construction suppliers and subcontractors involved in the studied project were interviewed.FindingsData analysis of vehicle movements suggested that construction transportation costs can be monitored and managed. The identified number of vehicle movements as a KPI offers a significant step towards logistics performance management in construction projects.Originality/valueThis research paper demonstrates that framework of using vehicular movements meet the criterion of effective KPI and is able to detect rooms for improvements. The key findings shed valuable insight for industry practitioners in initiating the measurement and monitor “the invisible logistics costs and performance”. It provides a basis for benchmarking that enables comparison, learning and improvement and thereby continuous enhancement of best practice at the operational level, which may accelerate the slow SCM implementation in the construction industry.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Anish Banerjee ◽  
R. Ramesh Nayaka

Purpose The purpose of this paper is to investigate building information modelling (BIM) integrated Internet of Things (IoT) architectures extensively and provide comparative evaluation of those against deciding parameters pertaining to their characteristics and subsequent applications in construction industry. Design/methodology/approach This paper identifies BIM-integrated cyber physical system frameworks, specific to project objectives, comprising of sensors working as physical assets and BIM-based virtual models acting as the cyber component , connected via wired or wireless protocols (e.g. WiFi, Zigbee, near-field communication, mobile-to-mobile, Zwave, 3 G, 4 G, long-term evolution, 5 G and low-power wide-area networks) and their potential applications in decision-making, visual management, logistics and supply chain management, smart building system management and structural performance assessment, etc. Such proposed architectures are evaluated against deciding parameters such as availability, reliability, mobility, performance, management, scalability, interoperability and security and privacy to evaluate their respective efficiencies. Findings This study finds that the underlying aim of planned IoT frameworks is to integrate systems and processes for a better information flow and to initiate shift from silo solutions to a smart ecosystem. The efficiencies of such frameworks are completely subjective to their respective project natures, objectives and requirements. Originality/value This study is unique in its nature to identify requirements of an efficient BIM-integrated IoT architecture and provide comprehensive insights about potential applications in construction industry.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Toluwalope Ogunro ◽  
Luqman Afolabi

PurposeRecently, multidimensional aspects of poverty has been increasingly focused on which includes education, economy and health, while access to modern energy such as stable electricity is also one of the possible solution; thus, this article aims to divulge the relation between access to electricity and progression in socioeconomic status in urban and rural areas of Nigeria in an attempt to propose a sustainable framework for access to electricity.Design/methodology/approachDemographic and health survey data are collected using four categories of model of questionnaires. A standard questionnaire was designed to gather information on features of the household's dwelling element and attributes of visitors and usual residents between the 2018 period. Biomarker questionnaire was used to gather biomarker data on men, women and children. Logistic model estimation technique was employed to estimate the socioeconomic factors affecting access to electricity in Nigeria.FindingsThese studies discovered that there are diverse set of factors affecting access to electricity in Nigeria especially in the rural areas. However, respondent residing in rural areas are still largely deprived access to electricity; most importantly, households with no access to electricity are more likely to use self-generating sets as revealed. Additionally, empirical findings indicated that the higher the level of your education and wealth, the higher the likelihood of having access to electricity in Nigeria. These factors included political will to connect the rural areas to the national grid, development of other infrastructures in those deprived areas and others.Practical implicationsThe problem confronting access to electricity in Nigeria has three components. The first is the significance of those deprived access to electricity in the rural areas and the physical resources needed to connect them to the national grid. The second is the political willingness of the government to have equitable distribution of public goods evenly between rural and urban areas especially on electricity access which will go a long way in reducing poverty in Nigeria. The third is lack of robust national development plans and strategy to tackle the problems facing electricity access in Nigeria.Social implicationsAs the rate of socioeconomic status/development increases, access to electricity is anticipated to rise up in Nigeria.Originality/valueThe findings can be used by the policy makers to address problems facing access to electricity in Nigeria.


2020 ◽  
Vol 24 (2) ◽  
pp. 163-182
Author(s):  
Edison Omollo Oduor ◽  
Lucy Wanjiru Ciera ◽  
Vijay Adolkar ◽  
Odoch Pido

Purpose This paper aims to determine the best conventional degumming technique for use by rural farmers practicing Eri silk fiber production in Kenya. Design/methodology/approach Three conventional silk degumming methods (water, soap and alkali) were analyzed under the factors, namely, time, pressure and degumming media, following the multilevel factorial design of experiments. The effect of variables on degumming weight loss was determined. The effects of the conventional degumming methods that produced complete sericin removal on chemical structure, surface morphology, thermal properties, crystallinity and fiber strength on Eri silk fibers produced in Kenya were then determined. The optimal degumming condition was then evaluated. Findings Soap and water degumming led to incomplete sericin removal. Alkali degumming media had the most effect, especially when pressure cooked at 103 kPa. Increasing time during alkali degumming beyond 30 min did not to have any major difference on degumming loss (at p 0.05). There were no major changes in chemical and thermal properties after degumming. However, the tensile strength and elongation deteriorated especially on alkali medium. Decreasing degumming time in alkali medium from 120 min to 30 min reduced the strength loss from 45% to 33%. Optimal degumming was found to be in an alkali media at 103 kPa for 30 min. Originality/value There is very little information available on Eri silk fibers produced in Kenya. Results of this study provide an optimized conventional degumming procedure suitable for small scale farmers in rural areas practicing Eri silk fiber production.


2019 ◽  
Vol 35 (3) ◽  
pp. 391-411 ◽  
Author(s):  
Saleh Ahmed ◽  
Elizabeth Eklund

Rural accessibility means more than just reliable roads and cost-effective transportation networks. Rural accessibility is critical for achieving social and economic development in low-income developing countries such as Bangladesh where both rural and urban development are constrained by significant infrastructural deficiencies. It is also an important factor that determines the effects of natural disasters on these resource-constrained societies, since both disaster responses and sustainable development are compromised by poor rural accessibility. Using two contrasting case studies from Bangladesh, this article reveals the significance of improved rural accessibility on rural development and the effects of natural disasters on rural areas. The findings of this article suggest that the improvement of rural accessibility should be a top national development priority, since it increases the opportunities for sustainable social and economic development and reduces the adverse effects of natural disasters on the rural areas in developing countries such as Bangladesh.


2015 ◽  
Vol 37 (1) ◽  
pp. 48-65 ◽  
Author(s):  
Colin C Williams ◽  
Ioana Alexandra Horodnic

Purpose – The purpose of this paper is to evaluate critically the “marginalisation” thesis, which holds that marginalised populations disproportionately participate in undeclared work. Until now, the evidence that participation in undeclared work is higher in marginalised areas (e.g. peripheral rural localities) and marginalised socio-economic groups (e.g. the unemployed, immigrant populations and women) has come from mostly small-scale surveys of particular localities and population groups. There have been no extensive quantitative surveys. Here, the intention is to fill this gap. Design/methodology/approach – To do this, we report a 2007 survey of participation in undeclared work involving 26,659 face-to-face interviews conducted in 27 European Union (EU) member states. Findings – The finding is that the marginalisation thesis is valid when discussing younger people and those living in peripheral rural areas; they are more likely to participate in undeclared work. However, there is no significant association between immigrant populations and participation in undeclared work. Moreover, a reinforcement thesis, which holds that the undeclared economy reinforces the spatial and socio-economic disparities produced by the declared economy, applies when considering those with fewer years in education, women, the unemployed and less affluent European regions; they have lower participation rates than higher educated people, men, the employed and affluent European regions. Research limitations/implications – The outcome is a call for a more nuanced understanding of the marginalisation thesis as valid for some marginalised populations but not others. Whether similar findings prevail at other spatial scales and in other global regions now needs investigating. Practical implications – This survey displays that although it is appropriate to target some marginalised populations when tackling undeclared work, this is not valid for others (e.g. immigrant populations, the unemployed, those living in less affluent EU regions). Originality/value – The first extensive evaluation of whether marginalised populations are more likely to participate in undeclared work.


Sign in / Sign up

Export Citation Format

Share Document