scholarly journals Comparing construction technologies of single family housing with regard of minimizing embodied energy and embodied carbon

2018 ◽  
Vol 49 ◽  
pp. 00126 ◽  
Author(s):  
Arkadiusz Węglarz ◽  
Michał Pierzchalski

This article concerns the Life Cycle Assessment method of evaluation and the ways in which it can be applied as a tool facilitating the design of buildings to reduce embodied energy and embodied carbon. Three variants of a building were examined with the same functional ground plan and usable floor area of 142.6 m2. Each variant of the building was designed using different construction technologies: bricklaying technology utilizing autoclaved aerated concrete popular in Poland, wooden frame insulated with mineral wool, and the Straw-bale technology. Using digital models (Building Information Model) the building’s energy characteristics was simulated and the embodied energy and embodied carbon of the production stage (also called cradle-to-gate) were calculated. The performed calculations were used to compare the cumulative energy and embodied carbon of each variant for a 40 year long life cycle.

Energies ◽  
2020 ◽  
Vol 13 (8) ◽  
pp. 1905 ◽  
Author(s):  
Ming Hu

Knowledge and research tying the environmental impact and embodied energy together is a largely unexplored area in the building industry. The aim of this study is to investigate the practicality of using the ratio between embodied energy and embodied carbon to measure the building’s impact. This study is based on life-cycle assessment and proposes a new measure: life-cycle embodied performance (LCEP), in order to evaluate building performance. In this project, eight buildings located in the same climate zone with similar construction types are studied to test the proposed method. For each case, the embodied energy intensities and embodied carbon coefficients are calculated, and four environmental impact categories are quantified. The following observations can be drawn from the findings: (a) the ozone depletion potential could be used as an indicator to predict the value of LCEP; (b) the use of embodied energy and embodied carbon independently from each other could lead to incomplete assessments; and (c) the exterior wall system is a common significant factor influencing embodied energy and embodied carbon. The results lead to several conclusions: firstly, the proposed LCEP ratio, between embodied energy and embodied carbon, can serve as a genuine indicator of embodied performance. Secondly, environmental impact categories are not dependent on embodied energy, nor embodied carbon. Rather, they are proportional to LCEP. Lastly, among the different building materials studied, metal and concrete express the highest contribution towards embodied energy and embodied carbon.


2018 ◽  
Vol 10 (9) ◽  
pp. 3229 ◽  
Author(s):  
Craig Langston ◽  
Edwin Chan ◽  
Esther Yung

Refurbishing buildings helps reduce waste, and limiting the amount of embodied carbon in buildings helps minimize the damaging impacts of climate change through lower CO2 emissions. The analysis of embodied carbon is based on the concept of life cycle assessment (LCA). LCA is a systematic tool to evaluate the environmental impacts of a product, technology, or service through all stages of its life cycle. This study investigates the embodied carbon footprint of both new-build and refurbished buildings to determine the embodied carbon profile and its relationship to both embodied energy and construction cost. It recognizes that changes in the fuel mix for electricity generation play an important role in embodied carbon impacts in different countries. The empirical findings for Hong Kong suggest that mean embodied carbon for refurbished buildings is 33–39% lower than new-build projects, and the cost for refurbished buildings is 22–50% lower than new-build projects (per square meter of floor area). Embodied carbon ranges from 645–1059 kgCO2e/m2 for new-build and 294–655 kgCO2e/m2 for refurbished projects, which is in keeping with other studies outside Hong Kong. However, values of embodied carbon and cost for refurbished projects in this study have a higher coefficient of variation than their new-build counterparts. It is argued that it is preferable to estimate embodied energy and then convert to embodied carbon (rather than estimate embodied carbon directly), as carbon is both time and location specific. A very strong linear relationship is also observed between embodied energy and construction cost that can be used to predict the former, given the latter. This study provides a framework whereby comparisons can be made between new-build and refurbished projects on the basis of embodied carbon and related construction cost differentials into the future, helping to make informed decisions about which strategy to pursue.


2021 ◽  
Vol 13 (9) ◽  
pp. 4757
Author(s):  
Pollyanna Fernandes Bianchi ◽  
Víctor Yepes ◽  
Paulo Cezar Vitorio ◽  
Moacir Kripka

Despite insufficient housing facilities, particularly in developing countries, construction systems are generally selected intuitively or based on conventional solutions sanctioned by practice. The present study aims to evaluate different options for the design of low-income housing in Brazil by integrating the life cycle assessment (LCA) into the decision-making process. To achieve this objective, three single-family projects with different construction systems were selected and analyzed. The most sustainable design was selected through the analytic hierarchy process (AHP). The considered parameters, which were obtained through a survey with professionals and customers, included cost, environmental impact, thermal comfort, construction time, and cultural acceptance. LCA and life cycle cost assessment (LCCA) were performed with the frontier’s system considering the cradle-to-gate cycle, which included the extraction of raw materials, manufacture of building materials, and housing construction. The projects were modelled using Autodesk Revit software with the Tally application for LCA evaluation. The results indicated that light steel frame houses present a better behavior than other conventional alternatives, and the integration of building information modelling with LCA and LCCA in the design phase can lead to the development of more sustainable houses.


2009 ◽  
Vol 16-19 ◽  
pp. 1091-1095
Author(s):  
Stuart Tomlinson ◽  
Chang J. Wang ◽  
Colin Morgan

This paper provides an analysis of the carbon emissions of materials used by a water company in the refurbishment of mechanical and electrical equipment at its pumping station. A tool for attaining life cycle calculations for embodied carbon, which can be applied in similar applications, is developed. Due to uncertainties in the derivation of numerical data and other related information, such as sources of raw materials, the embodied carbon emissions are calculated and analyzed using material emission factors using the Life Cycle Assessment method. This work may be used as a template for organizations requiring estimates of embodied carbon in materials and plant, for example, as a precursor to a major refurbishment project.


2021 ◽  
Author(s):  
◽  
Brian Berg

<p>This research simplifies the calculation of the Initial Embodied Energy (iEE) for commercial office buildings. The result is the improved integration of Life Cycle Assessment (LCA) assessments of building materials into the early stages of the building design process (sketch design). This maximises the effectiveness of implementing design solutions to lower a building’s environmental impact.  This thesis research proposes that building Information Models (BIM) will make calculating building material quantities easier, to simplify LCA calculations, all to improve their integration into existing sketch design phase practices, and building design decisions. This is achieved by developing a methodology for using BIM LCA tools to calculate highly detailed material quantities from a simple BIM model of sketch design phase building information. This is methodology is called an Initial Embodied Energy Building Information Model Life Cycle Assessment Building Performance Sketch (iEE BIM LCA BPS). Using this methodology calculates iEE results that are accurate, and represent a sufficient proportion (complete) of a building’s total iEE consumption, making them useful for iEE decision-making.  iEE is one example of a LCA-based indicator that was used to test, and prove the feasibility of the iEE BIM LCA BPS methodology. Proving this, the research method tests the accuracy that a BIM model can calculate case study building’s building material quantities. This included developing; a methodology for how to use the BIM tool Revit to calculate iEE; a functional definition of an iEE BIM LCA BPS based on the environmental impact, and sketch design decisions effecting building materials, and elements; and an EE simulation calibration accuracy assessment methodology, complete with a function definition of the accuracy required of an iEE simulation to ensure it’s useful for sketch design decision-making.  Two main tests were conducted as part of proving the iEE BIM LCA BPS’ feasibility. Test one assessed and proved that the iEE BIM LCA BPS model based on sketch design information does represent a sufficient proportion (complete) of a building’s total iEE consumption, so that are useful for iEE decision-making. This was tested by comparing the building material quantities from a SOQ (SOQ) produced to a sketch design level of detail (truth model 3), to an as-built level of detail, defined as current iEE best practices (truth model 1). Subsequent to proving that the iEE BIM LCA BPS is sufficiently complete, test two assessed if a BIM model and tool could calculate building material quantities accurately compared to truth model 3. The outcome was answering the research question of, how detailed does a BIM model need to be to calculate accurate building material quantities for a building material LCA (LCA) assessment?  The inference of this thesis research is a methodology for using BIM models to calculate the iEE of New Zealand commercial office buildings in the early phases of the design process. The outcome was that a building design team’s current level of sketch design phase information is sufficiently detailed for sketch design phase iEE assessment. This means, that iEE and other LCA-based assessment indicators can be integrated into a design team’s existing design process, practices, and decisions, with no restructuring required.</p>


Energies ◽  
2021 ◽  
Vol 14 (13) ◽  
pp. 3748
Author(s):  
Michał Pierzchalski ◽  
Elżbieta Dagny Ryńska ◽  
Arkadiusz Węglarz

Life cycle assessment is an environmental method which estimates either a process or a building material within the cradle-to-grave cycle. Presently, it is one of a few tools that include all factors which may influence the environment. The authors used this tool to prove effects connected with potential efficient energy levels and a reduction in CO2 emissions within a building’s life cycle. For the purpose of our analyses, several types of single-family building were chosen and they were subjected to analysis in the fixed location of Warsaw. The research scope included a numerical analysis of the buildings concerning the level of embodied energies and the emission of greenhouse gases. The performed analysis proved that, within a 50-year cycle, the difference between the embodied energy from the best and worst building choices can amount to 14.87%, whereas a reduction in embodied carbon emissions can reach 20.65%. Each change in the building’s form and the type of building materials used, regardless of the usable area, influence the environmental impact. Therefore, this paper concludes that LCA, as a management tool, should be used cyclically as part of each phase of the design process. A multi-criteria method for selecting architectural solutions was proposed which considered minimum cumulative primary energy, minimum cumulative carbon emission and minimum cost of constructing a building.


2021 ◽  
Author(s):  
◽  
Brian Berg

<p>This research simplifies the calculation of the Initial Embodied Energy (iEE) for commercial office buildings. The result is the improved integration of Life Cycle Assessment (LCA) assessments of building materials into the early stages of the building design process (sketch design). This maximises the effectiveness of implementing design solutions to lower a building’s environmental impact.  This thesis research proposes that building Information Models (BIM) will make calculating building material quantities easier, to simplify LCA calculations, all to improve their integration into existing sketch design phase practices, and building design decisions. This is achieved by developing a methodology for using BIM LCA tools to calculate highly detailed material quantities from a simple BIM model of sketch design phase building information. This is methodology is called an Initial Embodied Energy Building Information Model Life Cycle Assessment Building Performance Sketch (iEE BIM LCA BPS). Using this methodology calculates iEE results that are accurate, and represent a sufficient proportion (complete) of a building’s total iEE consumption, making them useful for iEE decision-making.  iEE is one example of a LCA-based indicator that was used to test, and prove the feasibility of the iEE BIM LCA BPS methodology. Proving this, the research method tests the accuracy that a BIM model can calculate case study building’s building material quantities. This included developing; a methodology for how to use the BIM tool Revit to calculate iEE; a functional definition of an iEE BIM LCA BPS based on the environmental impact, and sketch design decisions effecting building materials, and elements; and an EE simulation calibration accuracy assessment methodology, complete with a function definition of the accuracy required of an iEE simulation to ensure it’s useful for sketch design decision-making.  Two main tests were conducted as part of proving the iEE BIM LCA BPS’ feasibility. Test one assessed and proved that the iEE BIM LCA BPS model based on sketch design information does represent a sufficient proportion (complete) of a building’s total iEE consumption, so that are useful for iEE decision-making. This was tested by comparing the building material quantities from a SOQ (SOQ) produced to a sketch design level of detail (truth model 3), to an as-built level of detail, defined as current iEE best practices (truth model 1). Subsequent to proving that the iEE BIM LCA BPS is sufficiently complete, test two assessed if a BIM model and tool could calculate building material quantities accurately compared to truth model 3. The outcome was answering the research question of, how detailed does a BIM model need to be to calculate accurate building material quantities for a building material LCA (LCA) assessment?  The inference of this thesis research is a methodology for using BIM models to calculate the iEE of New Zealand commercial office buildings in the early phases of the design process. The outcome was that a building design team’s current level of sketch design phase information is sufficiently detailed for sketch design phase iEE assessment. This means, that iEE and other LCA-based assessment indicators can be integrated into a design team’s existing design process, practices, and decisions, with no restructuring required.</p>


2020 ◽  
Vol 310 ◽  
pp. 00065
Author(s):  
Andrea Moňoková ◽  
Silvia Vilčeková

This study presents a life cycle assessment (LCA) of ten single family houses located in Eastern Slovakia with the aim to compare them in terms of the materials and technologies used. The main goal is to investigate and emphasize the reduction rate of environmental impact resulting from using green materials and technologies. Environmental impacts are determined by using eToolLCD software. Life cycle impact assessment (LCIA) categories of global warming, ozone depletion, acidification, eutrophication and photochemical ozone creation potential, as well as abiotic depletion potential - elements, abiotic depletion potential - fossil fuels, use of renewable primary energy resources, net use of fresh water, components for reuse and materials for recycling are determined within the cradle-to-grave boundary. Assessed family houses are built as a combination of conventional materials such as aerated concrete blocks, expanded polystyrene (EPS), extruded polystyrene (XPS) and roofing mineral wool and natural materials such as wood, cellulose, clay, straw and extensive vegetation roofs. Multi-criteria decision analysis points out that material optimization of building structures as well as the application of green technologies can ensure a considerable reduction of environmental impacts.


2020 ◽  
Vol 11 (3) ◽  
pp. 41-53
Author(s):  
A. S Suntsov ◽  
O. L Simchenko ◽  
Y. A Tolkachev ◽  
E. L Chazov ◽  
D. R Samigullina

In this article, by studying the market for BIM solutions, we analyze the capabilities of the building information model for its compliance with the modern BIM ideology. Development in the direction of supporting the process of building construction: from the moment of the idea of its construction to complete dismantling, the BIM concept also included economic and planned components. At the present stage, the information model should develop and live with the building, even after putting it into operation. The purpose of this study is to analyze the maturity level of BIM solutions in accordance with the current development of BIM technologies at all stages of the building's life cycle. The stages of creating a model are distinguished: drawing up technical specifications for designing, performing engineering surveys, compiling 3 types of information models in accordance with the requirements for the development of the relevant sections of project documentation. The stages of the BIM-model life cycle that need to be improved are identified: operation, dismantling of buildings. The features of compiling information models, existing BIM solutions from various software manufacturers are considered. The comparison of existing BIM-solutions at all stages of creating an information model. For the analysis of BIM solutions, an expert assessment method will be used. A list of indicators and their rating weight for the methodology of expert evaluations is compiled. An assessment of the maturity of BIM-solutions. As a result of the analysis, a graph was compiled that clearly demonstrates the degree of maturity of the information model for the life cycle. The average percentage of development as a result of the assessment is determined. Some BIM solutions raise the question of the appropriateness of their use in the field of BIM technologies.