scholarly journals Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project

2018 ◽  
Vol 246 ◽  
pp. 01039
Author(s):  
Yongyan Wu ◽  
Huiyong Huang ◽  
Qi Li ◽  
Yibo Yan

To realize demand-oriented operations in the middle route of South-to-North Water Diversion Project, this paper proposed a pool operation method that a variation interval of water level at the upstream of the check gate is allowed. In this method, water users’ demand for flow changes can be satisfied as much as possible. Accordingly, downstream water depth is kept to fluctuate within a certain range, which is determined considering the canal safety, the operation frequency of check gates and the pool delay. The method is tested using the self-developed simulation platform for the middle route of South-to-North Water Diversion Project, which is established based on the Saint-Venant equations and programmed with the language Fortran. Results show that the flow changes demanded by water users, either increase or decrease, can be achieved effectively, while the water level variations can meet the restrictions for canal operation safety, and the frequency of gate adjustment is practically acceptable as well. Therefore, the operation method of allowing variation interval of downstream water level is suitable in the middle route of South-to-North Water Diversion Project at the current stage.

Sensors ◽  
2019 ◽  
Vol 19 (16) ◽  
pp. 3510
Author(s):  
Nengfang Chao ◽  
Gang Chen ◽  
Zhicai Luo ◽  
Xiaoli Su ◽  
Zhengtao Wang ◽  
...  

The Danjiangkou Reservoir (DJKR) is the freshwater source for the Middle Route of the South-to-North Water Diversion Project in China, and its water level and storage changes are important for water resource management. To maximize the potential capacity of the Gravity Recovery and Climate Experiment (GRACE) mission, an improved Lagrange multiplier method (ILMM) is first proposed to detect terrestrial water storage anomalies (TWSA) in the small-scale basin (DJKR). Moreover, for the first time, water diversion fingerprints are proposed to analyze the spatiotemporal pattern of the TWSA in the DJKR. The results indicate that the increased water level and storage signals due to the DJKR impoundment in 2014 can be effectively detected by using the ILMM, and they agree well with the results from altimetry and in situ data. Additionally, the water diversion fingerprints due to the DJKR impoundment are inferred, and describe the progression of spatiotemporal variability in water storage. The results show that water storage decreased in the upper Hanjiang River and increased in the DJKR as well as to the east of it during the period 2013–2015. Our research provides a scientific decision-making basis for monitoring the water resources of the DJKR and managing the South-to-North Water Diversion Project.


Water ◽  
2021 ◽  
Vol 13 (1) ◽  
pp. 97
Author(s):  
Yongyan Wu ◽  
Liqun Li ◽  
Zihui Liu ◽  
Xiaonan Chen ◽  
Huiyong Huang

Scientific and effective operation control of the Middle Route of South-to-North Water Diversion Project (MRP) is crucial to ensure water conveyance safety. As the longest water transfer project in China, its operation is confronted with unprecedented difficulties since it is controlled by a large number of check gates and diversion gates, subject to multiple constraints, and has no online regulation reservoirs. No automatic control models have been successfully put into use yet. This paper firstly introduced an expanded downstream depth operation method, and then scheduled the delivery using the volume balance principle and chartography according to the possible combination of flow change of the check gate, water volume change of the pool and flow change of diversions. Next, an improved real-time control model was established on the basis of PI controller, and the models were integrated into an automatic system for daily operation. Finally, a case study was carried out. Results showed that water level variations could be controlled within the target interval (0.25 m), and users’ demands could be met five times more rapidly. In addition, the total times of check gate operation could be reduced almost two times. The findings could promote the intelligent operation of the MRP.


2013 ◽  
Vol 12 (11) ◽  
pp. 2239-2247 ◽  
Author(s):  
Guomin Li ◽  
Haizhen Xu ◽  
Ming Li ◽  
Shouquan Zhang ◽  
Yanhui Dong ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document