Minimum Design Loads and Associated Criteria for Buildings and Other Structures

2021 ◽  
Author(s):  
Keyword(s):  
2015 ◽  
Vol 105 (49) ◽  
pp. 1-8
Author(s):  
Katharina Fischer ◽  
Matthias Schubert ◽  
Mark Schaer ◽  
Stefan Margreth ◽  
Kristian Schellenberg

1992 ◽  
Vol 25 (4-5) ◽  
pp. 161-168 ◽  
Author(s):  
J. Einfeldt

A process, called Bio-Denipho, for combined biological phosphorus and nitrogen removal in a combination of an anaerobic tank and two oxidation ditches is described. In this process the anaerobic tank consisting of three sections working in series is followed by two oxidation ditches. These too are working in series, but with both inlet to and outlet from the tanks changing in a cycle. The Bio-Denipho process is described specifically for the process itself and as a case study for the implementation of the process on a 265,000 pe wastewater treatment plant for the city of Aalborg in Denmark. The plant was designed and erected in two stages and the last stage was inaugurated October 31,1989. Lay-out and functions for the plant is described and design loads, plan lay-out and tank volumes are given in this paper together with performance data for the first year in operation.


Materials ◽  
2021 ◽  
Vol 14 (11) ◽  
pp. 2809
Author(s):  
Md. Akter Hosen ◽  
Fadi Althoey ◽  
Mohd Zamin Jumaat ◽  
U. Johnson Alengaram ◽  
N. H. Ramli Sulong

Reinforced concrete (RC) structures necessitate strengthening for various reasons. These include ageing, deterioration of materials due to environmental effects, trivial initial design and construction, deficiency of maintenance, the advancement of design loads, and functional changes. RC structures strengthening with the carbon fiber reinforced polymer (CFRP) has been used extensively during the last few decades due to their advantages over steel reinforcement. This paper introduces an experimental approach for flexural strengthening of RC beams with Externally-Side Bonded Reinforcement (E-SBR) using CFRP fabrics. The experimental program comprises eight full-scale RC beams tested under a four-point flexural test up to failure. The parameters investigated include the main tensile steel reinforcing ratio and the width of CFRP fabrics. The experimental outcomes show that an increase in the tensile reinforcement ratio and width of the CFRP laminates enhanced the first cracking and ultimate load-bearing capacities of the strengthened beams up to 141 and 174%, respectively, compared to the control beam. The strengthened RC beams exhibited superior energy absorption capacity, stiffness, and ductile response. The comparison of the experimental and predicted values shows that these two are in good agreement.


1994 ◽  
Vol 10 (2) ◽  
pp. 319-331 ◽  
Author(s):  
John F. Bonacci

This paper explores the development of a method that is useful for design of reinforced concrete (RC) frame structures to resist earthquakes. The substitute structure method, originally proposed in the 1970s, makes an analogy between viscously damped linear and hysteretic response for the purpose of estimating maximum displacement. The evolution of the method is retraced in order to emphasize its unique reliance on experimental results, which are needed to establish rules for assignment of substitute linear properties. Recent dynamic test results are used to extend significantly the calibration of the method, which furnishes design loads on the basis of drift and damage control.


2021 ◽  
Author(s):  
Sheng Dong ◽  
Yuliang Zhao ◽  
Zihao Yang ◽  
Lance Manuel

1982 ◽  
Vol 108 (7) ◽  
pp. 1684-1685
Author(s):  
A. R. Flint ◽  
J. G. M. Wood
Keyword(s):  

2021 ◽  
Author(s):  
Formentini Federico ◽  
Luigi Foschi ◽  
Filippo Guidi ◽  
Ester Iannucci ◽  
Lorenzo Marchionni ◽  
...  

Abstract This paper is based on the experience made during the design and installation of an offshore pipeline recently completed in Indonesia, where a 24” subsea production pipeline (16km long in 70m water depth) was found susceptible during design to lateral buckling. To limit the development of excessive deformation within the acceptance criteria, a mitigation strategy based on interacting planned buckles has been adopted installing three Buckle Initiators (BI) along the pipeline route. Buckling is a well understood phenomenon. However, this project was characterized by major uncertainties mainly driven by soil characterization, soil-pipe interaction, seabed mobility and soil liquefaction. These uncertainties have played a key role in the in-service buckling design. A lot of engineering efforts have been spent to go through the screening between alternative concepts, the validation of the chosen solution and its detailed engineering phase. This paper discusses the main contributing factors and how the uncertainties have been tackled. The Buckle Initiators are quite large and heavy structures with two main bars: the first ramp has an inclination equal to 30° and the pipeline has been laid on it; a second horizontal ramp was used as sleeper to accommodate the development of the lateral buckle during the operating life. A rotating arm was also used to restrict the pipeline lay corridor on the inclined ramp guaranteeing a combined horizontal and vertical out-of-straightness in the as-laid configuration. The rotating arm has been released as soon as the pipeline passed the BI permitting the pipeline to slide freely over the two BI ramps. The foundation of the Buckle Initiator has a footprint surface of about 60m2 guaranteeing its stability for different soil types characterizing the three installation areas. This more complex solution was preferred with respect to a typical sleeper to increase the robustness of the system in terms of buckle mobilization. The design of the Buckle Initiator was a multidisciplinary activity where many novel concepts were developed and many issues were faced (i.e. pipeline laying on an inclined sleeper, anti-scouring system, foundation design, etc.). The Buckle Initiator design was focused on structural calculations against design loads expected during temporary and operating conditions, geotechnical verifications, installation analysis, pipeline configuration and fatigue assessment. This paper presents all main engineering aspects faced during design and first feedbacks from field after the pipeline installation.


Author(s):  
Bethanie A. Parker ◽  
Rodney P. McAffee ◽  
Arun J. Valsangkar

An induced trench installation was instrumented to monitor earth pressures and settlements during construction. Some of the unique features of this case study are as follows: (a) both contact and earth pressure cells were used; (b) part of the culvert is under a new embankment and part was installed in a wide trench within an existing embankment; (c) a large stockpile was temporarily placed over the induced trench; and (d) the compressible material was placed in two stages. The maximum vertical pressure measured in the field at the crown of the culvert was 0.24 times the overburden pressure. The maximum horizontal pressure measured on the side of the culvert at the springline was 0.45 times the overburden pressure. The column of soil directly above the compressible zone settled approximately 40% more than did the adjacent fill. The field results at the crown and springline compared reasonably with those observed with numerical modeling. However, the overall pressure distribution on the pipe was expected to be nonuniform, the average vertical pressure calculated by using numerical analysis on top of the culvert over its full width was 0.61 times the overburden pressure, and the average horizontal pressure calculated on the side of the culvert over its full height was 0.44 times the overburden pressure. When the full pressure distribution on the pipe is considered, the recommended design loads from the Marston–Spangler theory slightly underpredict the maximum loads, and the vertical loads control the design.


Sign in / Sign up

Export Citation Format

Share Document