Construction Monitoring—The Greatest Stress Is Not Always What Is Measured

Author(s):  
Brett Commander ◽  
Jesse Sipple ◽  
Scott Aschermann
2002 ◽  
Vol 46 (6-7) ◽  
pp. 151-158 ◽  
Author(s):  
L. Dallmer

This paper describes part of a program undertaken by South Sydney City Council to promote sustainable water management The aim of the project, named SQIRTS (Stormwater Quality Improvement & Reuse Treatment Scheme) was to demonstrate best-practice water management approaches, to learn from the process of implementing these, and to encourage the further use of these technologies. It comprises three main components located in a suburban park: a gross pollutant trap (GPT), a stormwater reuse system, and interpretative artworks that aim to educate and interpret the water processes within the park. Results from the pre-construction monitoring program are presented.


Author(s):  
Fangliang Chen ◽  
Kaihua Zeng ◽  
Xuejun Li ◽  
Manqing Xu ◽  
Hongtao Dai

2018 ◽  
Vol 878 ◽  
pp. 89-94 ◽  
Author(s):  
Er Lei Wang

Implementing monitoring over construction process of old bridge’s reinforcement serves as an important measure to ensure construction quality and safety and realize the goal of reinforcement. This paper, with a case study of the maintenance and reinforcement project of Zhicheng Yangtze River Bridge (steel truss highway-railway combined bridge), adopted MIDAS to establish finite element analysis model, and with stress and deformation as monitoring parameters, completed the construction monitoring work, numerical simulation analysis and site test for the reinforcement project.


2013 ◽  
Vol 351-352 ◽  
pp. 1240-1243 ◽  
Author(s):  
Ting Yin ◽  
Wei Zhang ◽  
Yan Bo Zhao ◽  
Xiao Long Sun

Large-span V structure tied arch bridge structure system is complex. In order to make the actual state of the bridge into the ideal state of maximum close to the design, we must make real-time monitoring in the key parts of the structure, and adjust to the design of the data by analysis calculated, to ensure the safety and reliability of arch bridge in the course of construction and into stress after the completed bridge. Combined with the construction monitoring of the main Xinglong Bridge on Si River, this paper introduces the main bridge construction process measurement a preliminary study on the large span V configuration basket tied arch bridge construction monitoring technology. Based on the construction monitoring of Xinglong Bridge on Si River, this paper introduces the main contents and methods of monitoring point location, monitoring control of construction process, and discussed the construction monitoring technology of long-span X-style tied arch bridge V structure.


2020 ◽  
Vol 6 ◽  
Author(s):  
Jinwoo Kim

Operation-level vision-based monitoring and documentation has drawn significant attention from construction practitioners and researchers. To automate the operation-level monitoring of construction and built environments, there have been much effort to develop computer vision technologies. Despite their encouraging findings, it remains a major challenge to exploit technologies in real construction projects, implying that there are knowledge gaps in practice and theory. To fill such knowledge gaps, this study thoroughly reviews 119 papers on operation-level vision-based construction monitoring, published in mainstream construction informatics journals. Existing research papers can be categorized into three sequential technologies: (1) camera placement for operation-level construction monitoring, (2) single-camera-based construction monitoring and documentation, and (3) multi-camera-based onsite information integration and construction monitoring. For each technology, state-of-the-art algorithms, open challenges, and future directions are discussed.


Sign in / Sign up

Export Citation Format

Share Document