An Innovative Approach to Automatically Detect and Interpret Salient Spatiotemporal Features of a Numeric Field: A Case Study in Electrocardiographic Imaging

2009 ◽  
Author(s):  
Liliana Ironi ◽  
Stefania Tentoni ◽  
George Maroulis ◽  
Theodore E. Simos
2021 ◽  
Author(s):  
Andrew Imrie ◽  
Ashikin Kamaludin ◽  
Andrew Hood ◽  
Alistair Agnew

Abstract Traditional evaluation of behind-casing cement bond quality prior to cement plug placement involves removal, storage, transportation, and disposal of the tubing completion string. This paper presents an innovative approach to verifying cement bond and subsequent cement plug placement. This method involves cutting and retrieving part of the completion string and deploying acoustic logging tools into the casing, followed by using the tubing as a cement stinger. The procedure described in this paper first involves plugging and cutting the tubing, followed by partial retrieval of the completion to expose the abandonment horizon, which may be an impermeable shale or salt layer. A radial cement bond log tool is conveyed on wireline out of the tubing cut in order to evaluate the cement bond behind the exposed casing section. The existing cement sheath is assessed in accordance to a cement evaluation criteria to determine suitability as a barrier. A balanced cement plug is pumped utilising the existing completion string rather than a dedicated stinger. The permanent barrier is then verified appropriately based on satisfying key metrics in the pumping operation before hanging off the completion tubing in-hole and progressing with the rest of the abandonment programme. In the case study presented here, the tool string design considered the need to pass completion restrictions, convey through production tubing, and remain centralised with up to 50-degree deviation. Analysis of cement bond log data indicated that bond quality was good and suitable to place an internal cement plug across the abandonment horizon. This satisfied a minimum of 200-ft coverage across the zone of interest. The existing deep-set mechanical plug placed in the tubing prior to tubing cut was utilised as a base for the cement barrier. A 2,000-ft balanced cement plug was successfully set across the zone of interest. The completion tubing was used as a conduit for cement slurry placement, eliminating the usage of a dedicated work string. At the end of displacement, the tubing string was pulled out of hole safely to approximately 500-ft above the top of the cement with the help of controlled-gel progression properties incorporated in the slurry design. Due to existing completion accessories, setting a through-tubing cement plug and tubing rotation is not an option. Expandable cement was pumped to mitigate natural shrinkage and enhance post-set cement expansion to ensure a competent barrier. The cement job objectives were achieved by meeting the cementation execution criteria with no requirement to wait on cement. This provides additional time saving to the well abandonment. The discussed approach has successfully realised a significant rig-time saving of approximately two days on each well. Going forward, the methodology has effectively been applied to multiple wells across the Southern North Sea (SNS).


2017 ◽  
Vol 112 ◽  
pp. 01023 ◽  
Author(s):  
Raluca Daicu ◽  
Valentin Diţu ◽  
Gheorghe Oancea

2002 ◽  
Vol 40 (11) ◽  
pp. 1535-1549 ◽  
Author(s):  
C.L. Kruger ◽  
M. Murphy ◽  
Z. DeFreitas ◽  
F. Pfannkuch ◽  
J. Heimbach

2015 ◽  
Vol 2015 ◽  
pp. 1-15 ◽  
Author(s):  
António Aguiar Costa ◽  
António Grilo

This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research.


1986 ◽  
Vol 32 (2) ◽  
pp. 205-223 ◽  

Racial and ethnic violence continues to be a major problem in the United States. Boston, which experienced hightened racial turmoil since its desegregation process, presents an excellent case study of a police department that faced the problem in a straightforward manner. Traditional methods of classifying and investigating racial incidents were viewed as ineffective. The Boston Police Department developed an innovative approach to the handling of racially motivated crime, which involved implementing a departmentwide policy and creating a specialized police unit. This unit was highly successful in uncovering incidents that under traditional reporting methods appeared commonplace. Upon further examination, these incidents, taken together, indicated persistent and compelling patterns of racial animus. The uncovering of these incidents, the subsequent relabeling of them into “community disorders,” and the development of innovative strategies are described. Policy implications and recommendations are presented. Critics may question the allocation of police resources to a problem that on the surface may appear minor. However, racial violence viewed in the aggregate form has dramatic impact on the quality of life for the victim. A police department that recognizes the significance of this problem is making an important statement about the kind of society we are and what we as a nation stand for.


Sign in / Sign up

Export Citation Format

Share Document