Accessibility for maintenance in the engine room: development and application of a prediction tool for operational costs estimation

2022 ◽  
pp. 1-13
Author(s):  
Paola Gualeni ◽  
Fabio Perrera ◽  
Mattia Raimondo ◽  
Tomaso Vairo
1994 ◽  
Vol 29 (12) ◽  
pp. 23-29 ◽  
Author(s):  
G. Voigtländer ◽  
E.-P. Kulle

The paper presents a small sewage treatment plant (package plant) operating without additional energy. Purification of sewage is achieved in a three-step process: sedimentation tank, anaerobic reactor and wastewater pond or aerobic reactor. The efficiency of the anaerobic reactor - in contrast to the efficiency of a common septic tank - is significantly increased by using fixed biomass systems. Further degradation of sewage compounds by adhering microorganisms occurs in pond or aerobic reactor. The bed for the aerobic biomass is made of a semipermeable plastic film and arranged in order to ensure simultaneous supply of oxygen. The three pilot plants are showing different results. The main aims of research i.e. lowering of operational costs, energy supply, minimizing of maintenance expenditure and cleaning work, reliability of degradation efficiency have been achieved so far for the anaerobic reactor.


2019 ◽  
Vol 68 (6) ◽  
pp. 411-419 ◽  
Author(s):  
Gamze Güngör-Demirci ◽  
Juneseok Lee ◽  
Jonathan Keck ◽  
Stephen J. Harrison ◽  
Geoffrey Bates

Abstract Groundwater wells are critical drinking water infrastructure elements that widely support basic system supply needs while also providing supply reliability, better water quality (in some cases), and comparatively lower operational costs. Well rehabilitation and replacement are thus an area where water utilities could benefit from rational decision support frameworks and quantitative tools that enable them to better navigate the complex trade-off relationship(s) that exist among a variety of environmental quality, public health, financial, regulatory, organizational, and technological dimensions. Consistent with these considerations, a business risk-based prioritization tool was developed for this study that augments/extends California Water Service (Cal Water)'s well rehabilitation and the replacement decision-making process. For this derivation, a business risk exposure methodology is combined with an analytical hierarchy process (AHP), with the AHP being utilized to determine the weights of the factors involved in the likelihood of failure and the consequence of failure calculation. It is expected that the new tool will assist in optimizing inspection and action plans and identify the wells requiring attention and/or additional work for water utilities.


2021 ◽  
Vol 687 (1) ◽  
pp. 012106
Author(s):  
Anqi Niu ◽  
Mingxuan Guo ◽  
Jianli Wang ◽  
Meiqi Chen ◽  
Guoliang Jin ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document