scholarly journals Fuzzy project planning and scheduling using critical path techique

2019 ◽  
Vol 1377 ◽  
pp. 012044
Author(s):  
T Leelavathy ◽  
S Padmadevi
2019 ◽  
Vol 892 ◽  
pp. 266-273
Author(s):  
Chuan Kian Pang ◽  
Noor Ajian Mohd-Lair ◽  
Yi Sheng Chua

An air-conditioning and mechanical ventilation (ACMV) construction project involved many interrelated construction activities with varying durations and multiple dependencies. This paper focuses on the development of a best possible project planning and scheduling technique that can help the project manager to manage and complete the ACMV project in optimal time. The program evaluation and review technique (PERT) is used in this research. The PERT technique helps to determine the probabilities of various stages of the project by specified deadlines and identify the activities on the critical path that have high potential for causing delays in the project completion time. The completion times of 72, 76, 79, and 80 weeks were taken for the PERT analysis. Deadline of 72 weeks is the contractual period of the ACMV project as specified in the contract. Completion time of 76 weeks is the critical path of the project as analyzed by the PERT technique. The deadline of 79 weeks is the proposed completion time for the ACMV project whereas 80 weeks are the actual completion date of the project. The PERT analysis revealed that the project completion time of 72 weeks, which is as stated in the contractual completion time, yielded the probability of completion of 2.67% only. This analysis shows that the contractual period is impossible to be achieved and it is an unrealistic time setting. Further negotiation is required including changing or extending of the contractual completion time. The other completion times are able to be achieved but the company may need to face the high penalty costs due to the delays in completion time.


Author(s):  
Totska Olesia ◽  
Glovatsky Anastasia

The purpose of the article is to plan a project of an electric vehicle technicalassistance point. the methodology of the study is to use the critical path method.the scientific novelty of the obtained results is that the article describes the practicalaspects of project planning of the creation of an electric vehicle technical assistancepoint. In particular, the tasks of the project are described, labor, material and financialresources necessary for its realization are specified. conclusions. The implementationof the developed project will effectively manage the content, time and resources ofthe project of the creation of an electric vehicle technical assistance point.


2022 ◽  
Vol 14 (4) ◽  
pp. 75-81
Author(s):  
Tatyana Novikova ◽  
Svetlana Evdokimova ◽  
A. Novikov

The guiding principles of project implementation are planning. The discrepancy in time, cost, and quality between the plan and the actual implementation of the project requires management decisions supported by an analysis of the optimization of the duration of the project and the search for reserves to reduce the implementation time. For this purpose, a basic PERT model for a specific project was developed, early and late deadlines for work, time reserves, and a critical path were calculated. This work is aimed at applying methods of evaluation and analysis of projects to find optimal solutions and control the efficiency of time and costs in project planning, by varying the work on the project and the executors of the work. The results of this study showed that there are quite large time reserves for works 5-7, 7-9, 6-9, etc., which makes it possible to redistribute work between performers and allows you to vary performers during the implementation of several projects simultaneously.


Author(s):  
Hamsa Maan Mohammed Hamsa Maan Mohammed

Any project consists of a set of interconnected and interrelated activities in a specific order that are carried out at a specific time. The size of the projects, their high costs, and the complexity of their activities made it necessary to make a careful and prior planning. From here came the idea of ​​business networks, where scientific analysis was adopted for project planning, scheduling and reviewing by representing these projects with a network that shows the sequence of their activities at appropriate costs and times. Since such networks need time and effort to implement, the researcher used one of the smart techniques (the weed algorithm) and applied it to some business network issues that require great time and effort that increase as the size of the project increases. By applying the algorithm to some of these issues, it succeeded in achieving the required results in a record time (a few minutes) and according to the size of the issue, and hardly a little effort, in the first issue, the results (the expected time for each activity, determining the critical path, calculating the time needed to complete the critical path) achieved results in approximately one minute, and the second issue took less than two minutes. As for the third issue, the results were given in approximately two and a half minutes. Thus this smart technology has achieved the desired results in the least possible time and effort. Such a technique can be used and implemented on problems in different fields due to its accuracy, efficiency and speed in solving problems.


Tech-E ◽  
2019 ◽  
Vol 2 (2) ◽  
pp. 23
Author(s):  
Bella Liantono ◽  
Edy Edy

Project planning has several stages or project activity plans that can result in the running of a project more optimally to the project estimation that can help the planning manager or project manager work together in preparing project implementation at PT. Pakarti Tirtoagung. PT. Pakarti Tirtoagung is a business that will produce an intangible product (service) / service activity for construction and oil services that will be used for the needs of other companies. Problems at PT. Pakarti Tirtoagung in processing project data using the MS system. Excel which results in data redundancy so it must check data -  data and must be input again. This results in data redundancy and lack of data consistency so the presentation of project manager information is less accurate. Then this research uses CPM (Critical Path Method) method to determine the level of project progress in order to optimize project duration, possibility of accelerating time of project implementation and make it easier as admin by supporting project estimation activities, making it easier to manage planning of project activities and preparing a project scheduling. The design is implemented using PHP and MySQL database servers.


Sign in / Sign up

Export Citation Format

Share Document