scholarly journals Analysis and Design Information System using CPM (Critical Path Method) Method the web-based at PT.Pakarti Tirtoagung

Tech-E ◽  
2019 ◽  
Vol 2 (2) ◽  
pp. 23
Author(s):  
Bella Liantono ◽  
Edy Edy

Project planning has several stages or project activity plans that can result in the running of a project more optimally to the project estimation that can help the planning manager or project manager work together in preparing project implementation at PT. Pakarti Tirtoagung. PT. Pakarti Tirtoagung is a business that will produce an intangible product (service) / service activity for construction and oil services that will be used for the needs of other companies. Problems at PT. Pakarti Tirtoagung in processing project data using the MS system. Excel which results in data redundancy so it must check data -  data and must be input again. This results in data redundancy and lack of data consistency so the presentation of project manager information is less accurate. Then this research uses CPM (Critical Path Method) method to determine the level of project progress in order to optimize project duration, possibility of accelerating time of project implementation and make it easier as admin by supporting project estimation activities, making it easier to manage planning of project activities and preparing a project scheduling. The design is implemented using PHP and MySQL database servers.

Tech-E ◽  
2019 ◽  
Vol 3 (1) ◽  
pp. 22
Author(s):  
Felina Natalia Lie ◽  
Edy Edy

PT. Pakarti Tirtoagung is one of the companies engaged in construction services in Indonesia, in the scope of gas and petroleum. To facilitate the company in carrying out the project implementation process and monitoring the progress of the project, a special computerized system is needed.Looking at the system that runs on the company, there is no specific system support, which has several obstacles, among others in making schedule project, errors in recording data and presenting project progress reports because project progress was not monitored, completion of projects that are not in accordance with time schedules, etc. Of the several obstacles encountered, it becomes an interesting discussion to looking for solutions that can minimize obstacles and even risks that will occur as a result of these constraints. For that it was made Analysis And Design Of Web-Based Project Management Information System Using Critical Path Method (CPM) Method On Pt. Pakarti Tirtoagung. Using the CPM method for help planning activities to project development. Based on the results of the questionnaire that was distributed to 10 (ten) respondents and after processing the results 58% of respondents felt agree and 38% strongly agree that the system can present information about the ongoing project, monitoring the project and presenting a project progress report .  


2017 ◽  
Vol 862 ◽  
pp. 296-301
Author(s):  
Silvianita ◽  
Amalia Herdianti Winda ◽  
Mulyadi Yeyes ◽  
Suntoyo

In order to succeed Indonesia’s mission to provide 23.000 MegaWatt, the gas pipeline transmission has been built. The Project consists of many activities that related to each other, If one of the activities are having a problem that caused a delay, then the succeeding activities will get affected and could cause a project’s delay. To anticipate, it needs the acceleration of the project’s activity. In this case, the pipe transmission project would cause a 7 day delay. To accelerate it, this study gives the calculation, using “What If Analysis Method” on “Critical Path Method”. The acceleration actions are treated in accordance with providing extra working hours and the certain amount of manpower in the succeeding activities.


2018 ◽  
Vol 7 (12) ◽  
pp. 6731
Author(s):  
Rini Wijaya Kusuma Wardhani ◽  
Kastawan Mandala

ABSTRACT The increasing number of construction companies in Indonesia poses a challenge for companies to improve the effectiveness and efficiency of resource management in order to excel among competitors. The purpose of this study is to determine whether the implementation of Network Planning can improve efficiency and effectiveness in the allocation of time and cost on the construction project. The research method is a case study to address the problem at Putra Dewata PT Karya Tama concerning network planning of Mutiara Residence Housing project. Data analysis technique used is Critical Path Method. The results show that the project completion time is 142.5 days, 14.5 days faster than the calculation result by the company with Gantt Chart method. This will provide benefits in terms of cost of completion of the project, where cost efficiencies that can be gained is Rp. 20,807,500.   Keywords: network planning, critical path method, critical path.  


Author(s):  
Mridul Bhardwaj ◽  
Ajay Rana ◽  
Neeraj Kumar Sharma

<p>To make a perfect project plan, the software size of the order from the customer is the most important factor. The biggest challenge for the project manager is to estimate the project end date in the beginning of the project i.e. in project planning phase with realistic accuracy. Apart from other major inputs to estimate the project end date, expected team capability (productivity) and estimated software size are the major inputs that may influence the project end date. Software size is one of the most significant independent metric available in the planning phase and project manager has to estimate the other metrics based on the initial estimated software size. There is no direct relationship available between software size and project duration or software size and team productivity, however, there are industry data published by Quantitative Software Management and ISBSG that shows how these metrics influence each other. In this paper, using the data published by ISBSG and Quantitative Software Management, we try to statistically establish how productivity and project duration are influenced by software size. We have done linear regression analysis by generating the secondary data based on the data published by ISBSG and Quantitative Software Management. Linear regression equation validated with the actual project data and experimental results suggest that that productivity is significantly dependent on software size, however, project duration does not significantly depend on software size but may also be dependent on other metrics like team size, apart from software size.</p>


Author(s):  
Totska Olesia ◽  
Glovatsky Anastasia

The purpose of the article is to plan a project of an electric vehicle technicalassistance point. the methodology of the study is to use the critical path method.the scientific novelty of the obtained results is that the article describes the practicalaspects of project planning of the creation of an electric vehicle technical assistancepoint. In particular, the tasks of the project are described, labor, material and financialresources necessary for its realization are specified. conclusions. The implementationof the developed project will effectively manage the content, time and resources ofthe project of the creation of an electric vehicle technical assistance point.


2022 ◽  
Vol 14 (4) ◽  
pp. 75-81
Author(s):  
Tatyana Novikova ◽  
Svetlana Evdokimova ◽  
A. Novikov

The guiding principles of project implementation are planning. The discrepancy in time, cost, and quality between the plan and the actual implementation of the project requires management decisions supported by an analysis of the optimization of the duration of the project and the search for reserves to reduce the implementation time. For this purpose, a basic PERT model for a specific project was developed, early and late deadlines for work, time reserves, and a critical path were calculated. This work is aimed at applying methods of evaluation and analysis of projects to find optimal solutions and control the efficiency of time and costs in project planning, by varying the work on the project and the executors of the work. The results of this study showed that there are quite large time reserves for works 5-7, 7-9, 6-9, etc., which makes it possible to redistribute work between performers and allows you to vary performers during the implementation of several projects simultaneously.