scholarly journals Study on aerobic corrosion characteristics of gas injection pipe wall in oil field under dry / wet interaction condition

Author(s):  
T. Cheng ◽  
Y.B. Dang ◽  
F.T. Hu ◽  
Z.W. Jia ◽  
Z. Niu ◽  
...  
Keyword(s):  
2021 ◽  
pp. 1-13
Author(s):  
Wang Xiaoyan ◽  
Zhao Jian ◽  
Yin Qingguo ◽  
Cao Bao ◽  
Zhang Yang ◽  
...  

Summary Achieving effective results using conventional thermal recovery technology is challenging in the deep undisturbed reservoir with extra-heavy oil in the LKQ oil field. Therefore, in this study, a novel approach based on in-situ combustion huff-and-puff technology is proposed. Through physical and numerical simulations of the reservoir, the oil recovery mechanism and key injection and production parameters of early-stage ultraheavy oil were investigated, and a series of key engineering supporting technologies were developed that were confirmed to be feasible via a pilot test. The results revealed that the ultraheavy oil in the LKQ oil field could achieve oxidation combustion under a high ignition temperature of greater than 450°C, where in-situ cracking and upgrading could occur, leading to greatly decreased viscosity of ultraheavy oil and significantly improved mobility. Moreover, it could achieve higher extra-heavy-oil production combined with the energy supplement of flue gas injection. The reasonable cycles of in-situ combustion huff and puff were five cycles, with the first cycle of gas injection of 300 000 m3 and the gas injection volume per cycle increasing in turn. It was predicted that the incremental oil production of a single well would be 500 t in one cycle. In addition, the supporting technologies were developed, such as a coiled-tubing electric ignition system, an integrated temperature and pressure monitoring system in coiled tubing, anticorrosion cementing and completion technology with high-temperature and high-pressure thermal recovery, and anticorrosion injection-production integrated lifting technology. The proposed method was applied to a pilot test in the YS3 well in the LKQ oil field. The high-pressure ignition was achieved in the 2200-m-deep well using the coiled-tubing electric igniter. The maximum temperature tolerance of the integrated monitoring system in coiled tubing reached up to 1200°C, which provided the functions of distributed temperature and multipoint pressure measurement in the entire wellbore. The combination of 13Cr-P110 casing and titanium alloy tubing effectively reduced the high-temperature and high-pressure oxygen corrosion of the wellbore. The successful field test of the comprehensive supporting engineering technologies presents a new approach for effective production in deep extra-heavy-oil reservoirs.


2014 ◽  
Author(s):  
M. Cobanoglu ◽  
A. Jabri ◽  
F. Mahruqi ◽  
O. Quintero Sarmiento ◽  
S. Linthorst

2021 ◽  
Author(s):  
Kok Liang Tan ◽  
Sulaiman Sidek ◽  
Syakirin M. Nazri ◽  
Haziqah Hamzah

Abstract Immiscible Water Alternating Gas (iWAG) scheme was adopted in Echo field, offshore Sarawak Malaysia, to increase recovery factor of the matured oil reservoir after more than two (2) decades of peripheral water injection. It was implemented through four (4) horizontal wells located at reservoir’s eastern and western flanks. Since the commencement of iWAG injection, multiple challenges occured interrupting the stable injection that halting the success of this integrated mega scale project. It started with prolonged iWAG performance test run due to surface constraint, measurement and well issues on executing switching test, followed with low injectivity during switching operation. Subsequently, injectivity issues occured in the gas phase after several injection cycles. In addition to that, injector wells facing high downtime due to surface facilities and well integrity issues, causing low injection rates and unavailability to meet cycle volume within the stipulated duration. Reactivation of iWAG benefiter wells also prove to be challenging due to wells have been idle for a long time and multiple interventions required to revive the well. Injection data for both gas and water phase were analysed to improve iWAG operating procedure and understand the wells performance. INJ-J2 was installed with temporary pressure gauge during the water to gas switching, while the other two (2) wells are equipped with Permanent Downhole Gauge (PDG) to monitor the well injectivity. Application of non-intrusive flowmeter was also proven useful in calibrating the Flow Transmitter (FT) for both water and gas injectors, ensuring the accuracy and precision in the water and gas injection measurement. Besides that, fluid temperature trending was referred to validate on the meter measurement. Low injection rate compared to original plan were reviewed with the Reservoir Management Plan (RMP). Several approaches are implemented in order to achieve the iWAG RMP target and idle well reactivation. Analysis of injection data showed that gas injectivity issue occurred after the water to gas switching cycle. Injectivity improves slightly after long duration of continuous gas injection and applying higher Tubing Head Pressure (THP), unfortunately some wells remain with low injectivity because of insufficient discharge pressure to push the water from the near-wellbore deep into the reservoir to improve injection. Low injection rate issue is mitigated by extending injection cycle duration in order to meet the RMP cycle volume. Besides that, wells are normally injected with higher injection rate to cater for the high downtime. Both gas and water injection are balanced to ensure that the wells reached their cycle volume at similar duration. With limited new field discovery by the Operator, tertiary recovery on the mature field is inevitable. However, there is less implementation of iWAG in offshore field. Through this paper, authors wish to provide insights and lesson learnt for others when planning for iWAG tertiary recovery, taking account of various challenges faced.


2020 ◽  
Author(s):  
Khalid Javid ◽  
Guido Bascialla ◽  
Alvaro Sainz ◽  
Mohamed Hossni Ali ◽  
Srinivas Ettireddi ◽  
...  

2008 ◽  
Vol 11 (04) ◽  
pp. 778-791 ◽  
Author(s):  
Secaeddin Sahin ◽  
Ulker Kalfa ◽  
Demet Celebioglu

Summary The Bati Raman field is the largest oil field in Turkey and contains approximately 1.85 billion bbl of oil initially in place. The oil is heavy (12°API), with high viscosity and low solution-gas content. Primary recovery was less than 2% of oil originally in place (OOIP). Over the period of primary recovery (1961-86), the reservoir underwent extensive pressure depletion from 1,800 psig to as low as 400 psig in some regions, resulting in a production decline from 9,000 to 1,600 STB/D. In March 1986, a carbon-dioxide (CO2) -injection pilot in a 1,200-acre area containing 33 wells was initiated in the western portion of the field. The gas-injection was initially cyclic. In 1988, the gas injection scheme was converted to a CO2-flood process. Later, the process was extended to cover the whole field. A peak daily production rate of 13,000 STB/D was achieved, whereas rate would have been less than 1,600 STB/D without CO2 application. However, the field has undergone a progressive production decline since 1995to recent levels of approximately 5,500 STB/D. Polymer-gel treatments were carried out to increase the CO2 sweep efficiency. Multilateral- and horizontal-well technology also was applied on a pilot scale to reach the bypassed oil. A water-alternating-gas (WAG) application has been applied extensively in the western part of the field. Current production is 7,000 STB/D. This paper documents more than 25 years of experience of the Turkish Petroleum Corporation (TPAO) on the design and operation of this full-field immiscible CO2-injection project conducted in the Bati Raman oil field in Turkey. The objective is to update the current status report, update the reservoir/field problems that TPAO has encountered (unpredictable problems and results), and provide a critical evaluation of the success of the project. Introduction The Bati Raman field is the biggest oil accumulation in Turkey and is operated by TPAO. It contains very viscous and low-API-gravity oil in a very challenging geological environment. Because of the fact that the recovery factor by primary recovery was limited, several enhanced-oil-recovery (EOR) techniques had been proposed and tested at the pilot level in the 1970s and 1980s. On the basis of the success of the laboratory tests and the vast amount of CO2 available in a neighboring field, which is only 55 miles away from the Bati Raman field, huff ‘n’ puff injection was started in the early 1980s. Because of the early breakthrough of CO2 in offset wells in a short period of time, the project was converted to field-scale random-pattern continuous injection. During more than 20 years of injection, the recovery peaked at approximately 13,000 STB/D and began to decline, reaching today's value of approximately 7,000 STB/D. In the case of Bati Raman, in its mature, the injected agent is bypassing the remaining oil and production is curtailed by excessively high gas/oil ratios (GORs). The naturally fractured character of the reservoir rock has been a challenge for establishing successful 3D conformance from the beginning, and its impact is even more pronounced in the later stages of the process. Therefore, the field requires modifications in the reservoir-management scheme to improve the recovery factor and to improve productivity of the current wells.


1984 ◽  
Vol 24 (1) ◽  
pp. 278
Author(s):  
H. T. Pecanek ◽  
I. M. Paton

The Tirrawarra Oil and Gas Field, discovered in 1970 in the South Australian portion of the Cooper Basin, is the largest onshore Permian oil field in Australia. Development began in 1981 as part of the $1400 million Cooper Basin Liquids ProjectThe field is contained within a broad anticline bisected by a north-south sealing normal fault. This fault divides the Tirrawarra oil reservoir into the Western and Main oil fields. Thirty-four wells have been drilled, intersecting ten Patchawarra Formation sandstone gas reservoirs and the Tirrawarra Sandstone oil reservoir. Development drilling discovered three further sandstone gas reservoirs in the Toolachee Formation.The development plan was based on a seven-spot pattern to allow for enhanced oil recovery by miscible gas drive. The target rates were 5400 barrels of oil (860 kilolitres) per day with 13 million ft3 (0.37 million m3) per day of associated gas and 70 million ft3 (2 million m') per day of wet, non-associated gas. Evaluation of early production tests showed rapid decline. The 100 ft (30 m) thick, low-permeability Tirrawarra oil reservoir was interpreted as an ideal reservoir for fracture treatment and as a result all oil wells have been successfully stimulated, with significant improvement in well production rates.The oil is highly volatile but miscibility with carbon dioxide has been proven possible by laboratory tests, even though the reservoir temperature is 285°F (140°C). Pilot gas injection will assess the feasibility of a larger-scale field-wide pressure maintenance scheme using miscible gas. Riot gas injection wells will use Tirrawarra Field Patchawarra Formation separator gas to defer higher infrastructure costs associated with the alternative option of piping carbon dioxide from Moomba, the nearest source.


Author(s):  
C. D. (Charlton) Breon ◽  
D. R. (Daniel) Veth

A turbine-compressor train consisting of a General Electric MS5001 Model R single-shaft gas turbine, a Philadelphia Gear speed-increasing gearbox, and a Dresser-Clark centrifugal compressor was uprated for 30% increased gas throughput. This train is one of thirteen units operated by ARCO Alaska, Inc. for high pressure natural gas injection service in Alaska’s Prudhoe Bay Oil Field. The uprate included an in-place conversion of the gas turbine from a Model R to a Model P configuration. This paper describes the engineering, planning, and implementation activities that led up to the successful uprate of this train with only a 24 day equipment outage.


Sign in / Sign up

Export Citation Format

Share Document